挖方量 的英文怎麼說

中文拼音 [fāngliáng]
挖方量 英文
amount of excavation
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. The prosecutor palazzi, the lawyers, the secretary, the investigate and the accusatory all together in front of a ridiculous stalls made by journalist and non looking only for the big scoop to feed up the mass

    檢查官帕拉奇,律師們,部長們,調查人員們還有控人員們一起聚在一個由記者和看熱鬧的人群所構建的可笑的牲口圈,讓人們盡情的來掘那些愚蠢的被誇大的消息里來滿足群眾的大需求。
  2. In this article i do a lot of analysis for the data formed in the mobile samples with the basis of the research of data mining, mainly including : it analyses and summarizes the theory and technology of data, especially the further discussion of the data mining algorithm for time sequential. it introduces the course of the test curve of the power transmission system of electric mobile and discusses the technology and methods of pretreatment for curve data. it studies and develops the antitype system for the analyses of test curve data of the power transmission system of electric mobile with the mining and analysis of test curve data of the power transmission system of electric mobile and the basis of the algorithm of time sequential

    本文以目前數據掘的研究為基礎,對汽車樣品試驗中形成的大數據進行分析處理,主要研究內容包括:分析和綜述了數據掘理論基礎和相關技術,特別是對時間序列掘演算法進行了深入的討論介紹了電動汽車動力傳動系統檢測曲線生成的基本過程,討論了曲線數據的預處理技術與法以時間序列掘演算法為基礎,對電動汽車動力傳動系統檢測曲線數據進行了掘與分析,研究並開發了電動汽車動力傳動系統檢測曲線數據分析原型系統。
  3. This process of urban fringe adult education asks for the direction of " of community, by community, and for community ", adopts community principles, methods, means and ways, the principles including native, intensive and humanistic, the basic method is native teachers, near resources and the contents combined with community, aims at it ' s communalized development. it ' s ultimate abject is compatible and developing together with urban fringe society. adult education differs from each other just because the economic situation difference among areas

    城市邊緣區成人教育社區化發展就是要求城市邊緣區成人教育在選擇發展策略時要以「辦在社區,依靠社區,為了社區」為指導思想,採取社區化的原則、法、手段和途徑,並以社區化發展為目標,以本土化、集約化、人文化為基本要求,以「師資力就地取材,教育資源就近掘,教育內容結合社區」為基本做法,以達到成人教育與邊緣區社會協調一致、共同發展為最終目的。
  4. This paper recurred to the basic theory of rough set of data mining and under the direction of the frame of intelligent decision, the main theories include i ) the different methods of data mining on the base of rough set are used to deal with typical decision system namely consistent decision system and inconsistent decision system in order to carry through data reduction and rule distilment ; ii ) in the environment of dynamic increment database, the methods of data reduction to deal with the original data and increment data are discussed in the consistent and inconsistent decision system ; iii ) the method of data mining of rough set is analysized to treat with the attributes with priority ; iv ) on the base of basic rough set theory, the data analysis methods of amalgamation of rough set theory ; v ) and also the pre - disposal method to database is analysize

    本文從系統工程進行決策分析的角度出發,藉助數據掘技術中粗糙集的基本理論,在智能決策框架的指導下,研究了基於數據掘的智能決策理論及法。主要理論包括:如何利用粗糙集對典型的決策系統即相容性決策系統和不相容性決策系統運用不同的數據法進行有效的數據約減和規則提取;在增動態的數據庫環境下討論了在典型決策系統中對原始數據和增數據進行數據約減的法;分析了帶有優先權屬性的粗糙集數據法;以基本粗糙集為基礎探討了粗糙集擴展模型的數據分析法;研究了粗糙集數據預處理法。
  5. To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts.

    為了降低土工程的費用,填應等於挖方量
  6. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開法、支護體結構的應力法及測試手段;分析了支護體初期支護工字鋼拱應力、錨桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  7. Based all above, the digital railway plan system is developed. the system can do some operations including alternant planning the railway in the 3d terrain landscape, 3d modeling, budgeting the count of evolution, querying the information of the railway, outputting of avi

    該系統實現了在三維地形景觀中進行互動式的鐵路選線設計,並能對設計出的鐵路線進行三維建模、挖方量預算、信息查詢以及三維場景的avi動畫文件輸出。
  8. 5 the director ' s prior approval shall be sought if the in - situ dredging volume exceeds 23, 500 m3

    如果原址超逾23 , 500立米,須得到署長事先批準。
  9. According to the geological data which was gained by exploration investigation, establishing a geological model which can reflect rock mass characteristics ; with analyzing the internal and exterior factors synthetically, the deformation and possible failure mechanism and mode of the cut slopes was confirmed which combines with stereoic projection and other techniques ; the stabilities of the 14 high slopes are estimated synthetically by applicable design codes and guidelines. with the estimate result and some other analysis methods, the rock mass mechanical parameters of slope are identified ; as a results, 14 high slopes fall into 4 categories based on rockmass characteristics and discontinuities. the stability and deformation of some typical slopes was analyzed with distinct element method by udec ; the safety factor of some dangerous slopes are calculated by rigid limiting equilibrium method for comparison

    首先著重研究影響邊坡穩定性的內在因素,主要是通過地質勘探、測、現場觀測等手段取得研究區地質體的基礎地質資料,建立起能夠反映地質體結構特徵的地質模型;隨后綜合分析潛在的內外部影響因素,並結合赤平投影對邊坡可能的失穩模式或破壞機製作出判斷;運用已有巖體質分類法對沿線14個高陡邊坡穩定性進行初步的評價,並結合試驗研究、經驗判斷、工程類比等手段確定了坡體的巖體力學參數;根據穩定性初步評價結果將研究區14個高陡邊坡按開式分為4大類,並利用離散元程序udec對各類典型高陡邊坡進行了穩定性計算分析;對潛在危險邊坡利用剛體極限平衡法求出了不同工況下的安全系數。
  10. With synthesize slope ratio increasing, the stability of cutting slopes decreases, but the stability of sharpen slope affected by natural slopes ratio changes rarely, the stability of cutting slope that height is 30m is change notably due to slope type, whose single slope ratio with madao is inferior to the slope that upper ratio is less than lower ratio with platform in middle part. but the stability of cutting slope with 50m height is little change with the slope type change. with same stratum, slope height, slope type, the cutting slope is inferior to the sharpen slope in stability

    結果表明,地層含水在12 . 0 18 . 0變化范圍內,各種邊坡穩定性均隨濕度的增大而顯著降低;路塹邊坡的穩定性隨綜合坡比的增大而降低,但削坡受自然坡比影響,隨綜合坡比的增大其穩定性基本不變;坡高30m的路塹邊坡穩定性因坡型改變而有明顯變化,且單一坡比多級馬道型邊坡的穩定性較上緩下陡平臺型邊坡的穩定性差,但坡高50m的路塹邊坡穩定性因坡型變化而基本不變;當坡高、坡型、地層條件相同時,路塹邊坡的穩定性較削坡的穩定性差。
  11. This manner of change reflected the great influence of texture to rock mass quality. rock mass mechanical parameters corresponding to individual rock mass quality at different levels are determined by means of correlation analysis and statistical analysis. results show that calculation outcomes match well with measured mechanical parameters

    研究結果表明:對于混凝土重力壩,按照現在的深開案,壩肩開后,土石高達820x10 『 m 『 ,且在72dri高程至坡頂將產生大范圍的破壞區,採用工程治理將帶來巨額的費用。
  12. This paper set up a geological model of sliding mass by geological condition analysis and selection cross section of character representation of guishan sliding mass. the stability of sliding mass is calculated and evaluation under bench stoping and deck excavation in terms of six excavation schemes with limit equilibrium method. there dimensional finite element method is applied to study the stability of sliding mass to the deck excavation schemes by means of computer simulation and calculation

    通過對滑坡體工程地質條件的分析,選取滑坡體的代表性剖面建立了滑坡體的地質模型,選取極限平衡法就滑坡體在臺階式開和整體開兩種不同開式共6種具體開案條件下,對滑坡體的穩定性進行了定計算評價,提出臺階式開和整體開兩種不同開式的的各開案的比較結果,然後就確定的具體開案開展三維有限元數值計算,並進行評價,以達到相互校核、相互驗證的目的,最後,確定出工程應用的開施工案。
  13. The change of energy in wall rock is tracked in the whole process and the amount of energy transferred to linings is also evaluated. 5 ) based on the principal of energy invariance and the energy properties of sfrc, a practical design equation that related the thickness of projecting sfrc to the energy related properties of tunnel is given in the end. this equation is then used to design a single - track railway tunnel in iii grade rock condition

    並進一步推導了不同形式的構件間的能耗散關系,為將標準試驗的能統計結果運用於實際結構中打下了基礎; 4 )利用有限元軟體對隧道開過程進行了三維模擬,得到了隧道圍巖在開掘進過程中的能轉化趨勢和規律,得到了鋼纖維噴射混凝土襯砌在支護過程中的能變化; 5 )利用能守恆原理和已經推導出的構件能耗散關系,建立了鋼纖維噴射混凝土襯砌厚度與圍巖開變化間的關系,並運用此法對級圍巖條件中的鐵路單線隧道的鋼纖維噴射混凝土襯砌進行了設計計算;
  14. With the new index, the intension of rockburst and the position and extent of failure zone can be predicted quantitatively during rockmass excavation under high geostress

    該指標可更好地定預測高地應力下地下工程開過程中巖爆發生的強度、破壞位置與范圍,由該指標求出的圍巖釋放能又可作為地下工程開案的優化指標。
  15. Particularly four following respect problems of main research of this thesis : first, excavating and optimizing of the road bed and the slope protect, on the basis of influence factor analysis and the slope design principle by the expressway of mountain area of limestone, we excavate the model of optimizing after putting forward the road bed which is suitable for the expressway of mountain area of limestone, through employ this optimize model, we can reduce the amount of road bed excavate, thus maximum reducing slope excavate destruction to environment and pollute ; according to limestone mountain area expressway characteristic of the cutting slope, we use the law of finite element and rmr of revision carry on stability analyze and appraise to their side slope ; combine the limestone rock body characteristic of mountain area, we have analyzed the corresponding side slope safeguard procedures

    論文主要研究了以下四面問題:第一,路基開優化。在分析石灰巖山區環境特徵的基礎上,探討了石灰巖山區路線設計的原則與法;在應用有限元數值分析法對邊坡的開穩定性進行分析的基礎上,提出了陡開強支護的石灰巖山區高速公路的路基開式,並建立了填平衡,開面積最小的石灰巖山區高速公路的路基開優化模型;結合石灰巖山區巖體特性,探討分析了相應的邊坡防護措施。第二,土石處理及自然水系調治恢復。
  16. The excavation of the right slope of the approach channel for the inlet of the spillway tunnel in heihe water control project has a significant effect upon the construction quality and the cost of the project

    摘要黑河水利樞紐右岸溢洪洞進口引渠右岸邊坡的開案,是影響該工程質和造價的突出問題。
  17. Secondly, on the basis of mechanic properties analysis, applying the stress - strain model of lateral unloading which can reflect the decrease change of principal stress state in the excavation progress of slope, dividing excavations slope into cutting slope and sharpen slope, numerical simulation is respectively carried through in order to analyze the impact of changing of slope type, slope height and stratum water content on the slope stability

    其次,在試驗研究的基礎上,應用能夠反映黃土邊坡大、小主應力減小變化的圍壓卸荷剪切應力應變模型,將邊坡區分為路塹邊坡和削坡,通過數值模擬開過程分析了坡高、坡型、坡比及地層含水變化對邊坡穩定性的影響。
  18. First, considering the change of stress conditions in excavation slopes by means of triaxial equipment, the triaxial tests of three kinds of stress paths of q3 and q2 loess, including lateral unloading, keeping mean normal stress changeless and conventional axial loading, is carried out under different water content and consolidation stress conditions

    本文就黃土高邊坡工程問題,首先在三軸儀上考慮邊坡開過程應力條件的變化,進行了q _ 3 、 q _ 2黃土不同含水條件下圍壓卸荷、等p剪切及軸向加載三種應力路徑的試驗。
  19. The excavating method of protected level of foundation for hydraulic structure is concemeted with the quality, progress and benefits of engineering

    水工建築物基礎保護層開法直接影響到水電工程的質、進度和效益。
  20. Abstract : in this paper the mathematical model for shape optimization of arch dam subject to crack - depth constraint is estabilshed and the super finite element method ( sfem ) for arch dam cracking analysis is used as the re - analysis method. the research findings on xiaowen arch dam show that the shape optimization of arch dam subject to crack - depth constraint may further help reduce the volume of dam

    文摘:本文引進裂縫深度約束條件,研究了拱壩開裂條件下的體形優化設計問題.結構分析採用超級有限單元法,既能有效控制計算規模又能便地反映結構開裂的局部特性.對小灣拱壩和溪洛渡拱壩進行的優化設計研究表明,在優化過程中允許開裂並考慮開裂約束條件,可以更好地掘拱壩潛力,進一步減小壩體混凝土
分享友人