挖機 的英文怎麼說

中文拼音 []
挖機 英文
small backhoe
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : machineengine
  1. Anatomy of typical failures of komatsu pc200 - 7 excavator

    7型典型故障剖析
  2. Causes for bit freezing of auger drill and its countermeasure

    卡鉆原因及其對策
  3. We should have the dredge, barges and draglines in place about the same time.

    差不多要在同時使,駁船和索斗鏟各就各位。
  4. Data mining, which has been considered as a important methods in the analysis of time series, received more attention came from boffin. data mining is a process which get the useful information from the vast 、 incomplete 、 noised 、 fuzzy and random data

    數據掘技術是從大量的?不完全的、有噪聲的?模糊的、隨的數據中,提取隱含在其中的?人們事先不知道的?但又是潛在的有用信息過程。
  5. Analysis of low - speed of engine of thread - type borer in altiplano area

    發動高原掉轉分析
  6. Finite element analysis of mast section structure of thread - type borer

    常用鉆桅截結構的有限元分析
  7. Our excavation team consisted of twelve vehicles, including three excavators, a bulldozer, three tractors, two 35 - ton trucks, one eight - ton truck, and two jeeps. these vehicles were deployed in the severely hit areas of chungliao and chichi to open roads and clear debris from collapsed buildings and streets

    我們的車隊,包括了三臺大型的怪手一臺堆土三輛拖板車兩輛35噸的貨車一輛8噸的貨車兩輛吉普車,共十二部組成。
  8. Mar 2005 : the cnc roll grinder started construction

    2005年03月:研磨動工。
  9. Crawler excavators with electric power. basic parameter

    履帶式電動基本參數
  10. Crawler excavators with electric power. specification

    履帶式電動技術條件
  11. Designing on dibbling machine for plant tree

    植樹設計若干問題
  12. This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided

    故此選用這臺既可在軟土又可在硬石層運作的隧道鉆挖機,避免以明隨填的方法開鑿隧道,免卻對交通及環境造成嚴重影響。
  13. They visited west rail work sites in tuen mun, yuen long, kam tin, long ping, and tsuen wan. they also visited tai lam tunnel and tsing tsuen tunnel to view the operation of the tunnel boring machine

    參觀的地點包括西鐵在屯門、元朗、錦田、朗屏及荃灣的工地,他們亦到了大欖隧道及青荃隧道工地參觀隧道鉆挖機的操作情況。
  14. Also speaking at the commissioning ceremony, kcrc chairman mr k y yeung noted that because of the mixed ground conditions along the tsing tsuen tunnel site, conventional tunnel - boring machine could not handle the job

    九鐵主席楊啟彥先生在啟動儀式上表示,由於青荃隧道所經的位置混合軟土及硬石,傳統的隧道鉆挖機並不適用。
  15. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基坑空間和時間效應影響理論來分析逆作法施工過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  16. " mulan " is the largest tunnel - boring machine ever used in hong kong

    木蘭號是香港歷來規模最大的隧道鉆挖機
  17. Hard rock tunnel boring machine

    巖石隧道鉆挖機
  18. Secretary for the treasury commissions " mulan " west rail s giant tunnel boring machine " mulan " was commissioned by the secretary for the treasury miss denise yue on 31 march

    西鐵的巨型隧道鉆挖機木蘭號於三月三十一日由庫務局局長俞宗怡女士啟動。
  19. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東道沿路和前水警總部地底的鐵路隧道,會以鉆隧道方式建造,除了在廣東道政府合署現址附近的工地內開地面以便興建新車站及引進隧道鉆挖機外,需要在廣東道路面進行的工程規模會很少,以便盡量減少對毗鄰環境的影響。
  20. The spokesman said issues in relation to tunnel construction, including loss and contamination of ground water, subsidence and blow - out, will be addressed by way of the use of an earth pressure balance tunnel boring machine which has been proven to be very successful in the construction of one of the most difficult sections of the west rail, the tsing tsuen tunnel

    九鐵發言人指出,透過使用土壓平衡隧道鉆挖機,可以解決各種建造隧道的問題,如地下水流失和污染、土地沉降及泥漿從地底湧出等。西鐵即採用了相同的鉆挖機完成其中一項艱鉅的工程
分享友人