挖泥耙 的英文怎麼說
中文拼音 [wāníbà]
挖泥耙
英文
hand dredge-
Structure design of a 13 000 m3 large suction hopper dredger
3大型耙吸挖泥船的結構設計Tendency in development of large trailing suction hopper dredger
大型耙吸挖泥船的發展動向To predict the multiple dynamic behaviors of the suction pipe system of a trailing suction hoper dredger ( tshd ) when it is dredging at sea under the un - quiet conditions, the forces acting on the system should be analyzed accurately
摘要為預測耙吸式挖泥船遠海施工時耙吸管系統在非靜態環境中的多體動力學行為,要求準確分析作用在該系統上的力。Technical requirement for repairing special equipment of trailing hopper suction dredgers part 6 : suction pipe
耙吸挖泥船專用設備修理技術要求第6部分:舷外耙管Trailing suction side caster dredger
邊拋耙吸式挖泥船Trailing suction hopper dredger
耙吸式挖泥船Scoop - type suction dredger
耙吸式挖泥船Trailing suction dredger
耙吸式挖泥船Scoop - type dredger
耙吸式挖泥船Based on the mathematical model of these forces, a simulation model is built by using the software of adams
並以耙吸式挖泥船為例,根據得出的作用力數學模型,建立了基於adams動力學分析軟體的模擬模型進行驗證。The structure and the working process of a trailing suction dredger are complex, and the working environment and the material to be dredged vary very much
耙吸式挖泥船的結構和疏浚過程都非常復雜,其工作環境和工作對象變化較大。Improving the working character and the efficiency of trailing suction hopper dredgers will greatly increase the production, save power and bring more interests for dredging industry
改善耙吸式挖泥船的工作特性和工作效率將大大提高疏浚產量、節省能源,為疏浚工程創造更多的效益。The necessity of the yangtze estuary waterway administration bureau ' s purchasing of specialized trailing suction hopper dredger is analyzed, and suggestions on the way of building of the dredger are put forward
摘要對長江口航道管理局購買專用耙吸式挖泥船的必要性進行了分析,並對專用挖泥船建造方式提出了建議。Technical requirement for repairing special equipment of trailing hopper suction dredgers part 1 : duaghead
耙吸挖泥船專用設備修理技術要求第1部分:耙頭Full scale ship power measuring of quot; fangcheng quot; trailing suction hopper dredger and operational sailing speed forecast after draghead transformation
號耙吸挖泥船實船功率測試及耙頭改造後作業航速預報The process of effluent flow during loading in self - propelled trailing suction hopper dredgers was simulated by way of physical modeling and was measured and analyzed by using the flow rate and concentration of spoil in the hoppers, particle sizes of sediments at the inlet and outlet of the effluent flow pipe and hopper volume as the major control parameters
摘要通過物理模型試驗模擬自航耙吸挖泥船裝艙溢流施工過程,以艙內流速、艙內濃度、溢流進出口泥沙粒徑、裝艙量幾方面為主要控制因素,進行實測、分析,並比較自航耙4種常用裝艙裝置的消能效果。There are many sorts of the modern dredgers, to adapt the various working regions, and soil conditions etc. it is inevitable to select to build the large self - propelled trailing suction hopper dredgers for shanghai channel bureau, because of the developments of the big - scale ports and channels at home and abroad, and the bad working conditions offshore, and the business direction
現代挖泥船有各種類型,它們適用於不同的施工區域與土質等工況條件。世界與國內港口航道的發展愈來愈體現出規模大,向外海推進和施工條件惡劣的特徵,從上海航道局的企業經營定位出發,建造大型自航耙吸挖泥船是首選方案。This dissertation firstly discusses the basic structure of trailing suction hopper dredgers, then establishes the mathematical model of dynamic process of trailing suction hopper dredgers and the model of compensator of wind and wave, develops a set of real time simulation software using oop visual c + +, mfc, delphi and activex component technology, and simulates the different dynamic characters for different working situations
本文從討論耙吸式挖泥船基本結構和基本工作過程著手,建立了耙吸式挖泥船疏浚系統的數學模型,採用面向對象的visualc + + 、 mfc圖形函數、 delphi和activex控制項技術,開發了一套實時模擬軟體,模擬了不同疏浚工況下的動態特性。On development of large trailing suction dredges
大型耙吸挖泥船發展綜述Research on draught and loading monitoring system for suction dredger
自航耙吸挖泥船吃水裝載監測系統研究分享友人