挖漿機 的英文怎麼說

中文拼音 [jiāng]
挖漿機 英文
digger
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • 漿 : 漿同「糨」
  • : machineengine
  1. Based on the analysis of the characteristics of the raw mix slurry preparing process in alumina sintering production process, firstly, a mechanism model based on material balance principle was established as the master - rule model for the quality prediction ; secondly, considering the problem that the alkali liquor composition was unstable and its real - time measurement was difficult, a nn ( neural networks ) prediction model for the prediction of the alkali liquor composition was set up and nesting - integrated with the mechanism model ; finally, using the gray theory for the information mining from the errors of the mechanism model, a gm ( 1, 1 ) compensation model was put forward and parallel - connection - integrated with the mechanism model, achieving a raw mix slurry quality prediction model

    摘要針對燒結法氧化鋁生產過程中生料漿配料工藝的特點,根據物料平衡的原理建立理模型,作為生料漿質量預測的主規律模型;針對堿液成分波動大且難以實時檢測的問題,對堿液成分含量建立了神經網路預測模型,並和理模型進行嵌套集成;利用灰色理論對理模型的偏差數據進行信息掘,建立了gm ( 1 , 1 )補償模型,並與理模型進行並聯集成,獲得生料漿質量預測模型。
  2. Based on field test and theoretical analysis, the mechanism of instability of slurry - supported excavations was investigated from angles of soil arching effect, time - dependent effect, overall stability, and local stability

    同時,根據現場試驗和理論研究成果,從土拱效應、時間效應、整體穩定性和局部穩定性等方面分析了泥漿護壁開的失穩理。
  3. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開技術的發展情況分析,以及結合現代計算多媒體技術的特性,提出開發「水平定向鋪管技術多媒體培訓系統」的必要性;並在簡略介紹水平定向鉆鋪管技術的基礎上,給出開發「水平定向鋪管技術多媒體培訓系統」的「總論」 、 「施工前工程勘測」 、 「泥漿處理」 、 「施工原理」 、 「施工工藝」 、 「施工具」和「施工設計」七大模塊的具體設計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用前景和改進方向。
  4. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿作用力學理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿有限單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩定性分析的有限元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。
  5. In this thesis, analysis of whole performance and interior mechanism of plain soil slope and soil nailing wall with flag finite difference program has been carried out. at the same time, the impacts on the internal force distribution of soil nailing and the deformation of soil nailing wall of many factors, including the connection between face shield and soil nailing, the friction decline between soil nailing and soil, the shear force & bending moment resistance of soil nailing, the cement crack in soil nailing, face shield, excavation, the obliquity of slope, and so on are studied in this thesis

    本文通過flac有限差分程序,分析了素土基坑和土釘墻體的整體性能和內在理,研究了土釘和面層的連接變化、土釘表面性能的下降、土釘的橫向抗剪抗彎作用、土釘漿體的開裂、面層的有無、基坑的開過程、基坑放坡角度等因素對土釘內力分佈和土釘墻變形的影響。
  6. This paper designs the characteristic curves and system curves for the dredging materials of the water and all kind of mixtures, which base on the theory of hydraulic dredging and the experiment data of prototype dredger, then puts out the equations of computing the work point of dredge pump system and the model that can simulate the work condition of dredging pump such as the flow rate, vacuum and pressures

    該模型根據水力疏浚原理和1750泥船的技術數據,設計了泥泵和管路的清水特性曲線與泥漿特性曲線,在此基礎上給出了泥泵工作點的計算方法。最後給出了計算泥泵工況的模型和模擬實例; 3 、絞刀電動拖動系統。
  7. The spokesman said issues in relation to tunnel construction, including loss and contamination of ground water, subsidence and blow - out, will be addressed by way of the use of an earth pressure balance tunnel boring machine which has been proven to be very successful in the construction of one of the most difficult sections of the west rail, the tsing tsuen tunnel

    九鐵發言人指出,透過使用土壓平衡隧道鉆,可以解決各種建造隧道的問題,如地下水流失和污染、土地沉降及泥漿從地底湧出等。西鐵即採用了相同的鉆完成其中一項艱鉅的工程
  8. In order to improve the understanding of excavation stability under slurry supporting condition, an analysis was performed of some influencing factors, including the properties of slurry, the ground condition, the shape of excavated trenches, the operation of excavation equipment, the workmanship of construction, etc

    摘要為提高泥漿護壁條件下開穩定性的認識,在收集和整理現有研究成果的基礎上,分析了泥漿護壁開穩定性的影響因素,包括泥漿性質、地基土質條件、開槽段的形狀以及施工械和工藝等。
分享友人