挖豎井 的英文怎麼說
中文拼音 [wāshùjǐng]
挖豎井
英文
sink a shaft-
Excavation blasting of gate shaft for a pumping energy - accumulated power station in luotian
抽水蓄能電站閘門豎井開挖爆破Shaft excavation and lining construction in shisanling pumped storage power station
十三陵抽水蓄能電站豎井開挖及襯砌施工Secondly, the paper analyzed the behavior of isotropic and orthogonal anisotropic materials " cws on the basis of above theory and software. regularities of cws " deformation inner force and shared load and earth pressure in excavating stage and driving stage were gained. regularities influenced by material features top beam excavating depth sidewall depth properties of soil layers rear backing and location of load were also obtained, especially rules of display degree exerted by circular and vertical loads were also obtained
通過分析,得到了形成階段及頂進階段圓形工作井的變位、結構內力、分載及土壓的分佈規律及材料性質、頂冠梁及圍檁、開挖深度、井壁插深、土層性質、后靠背、頂載作用位置等因素對結構受力性狀的影響規律,特別是得到了工作井在受力時結構環向與豎向承載作用發揮程度的規律。The tubular turbines are the best selection for exploitation of tidal power and hydraulic power with extremely low heads and extremely large flow rates. they have large discharge, high specific and high efficiency, and need less excavation. they have been classified into bulb, pit, siphon and " s " types in the light of their structural types
貫流式水輪機是開發特低水頭,特大流量水電站及潮汐發電的良好機型。該機具有開挖量小,過流量大,比轉速高等特點。按其結構型式分燈泡式豎井式軸伸式等。A thorough quality control should be made in base construction. sixteen poles in longqiao iron mine poured into the wells can all satisfy designment requirement of engineering
摘要在樁基施工過程中進行全面的質量控制,龍橋鐵礦豎井井塔16根人工挖孔擴底灌注樁工程質量全部滿足設計要求。分享友人