振動爆破 的英文怎麼說

中文拼音 [zhèndòngbào]
振動爆破 英文
vibration blasting
  • : 動詞1. (搖動; 揮動) shake; flap; wield 2. (奮起) brace up; rise with force and spirit
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • 振動 : vibrate; vibration; vibrance; vibrancy; vibra; vibes; shaking; rumble; jitter; chatter; sway; jar...
  • 爆破 : blow up; blast; burst; demolish (by explosives); detonate; explode; dynamite
  1. Study on blasting seismic dynamic effect for tunnels with close interval in bedded rock mass

    層狀巖體中近鄰雙線隧道響應研究
  2. Then the article analyses the effecting elements about the economic result of blasting and puts forward some improving measures, and summarizes optimizing model on economic result of blasting both internal and overseas bearing upon. the theory is based on the blasting cost model, which proposed by dr. zhong hanrong. combining with the specialties of water and electricity engineering, starting off through blasting result, it emphasizing considers drilling cost, deep hole bench blasting cost, reblasting cost, and the cost of bottom fleet hole blasting that in mixed loading emulsion explosive blasting

    本文在加拿大鐘漢榮博士提出的成本模型基礎上,結合水電工程的特點,從效果出發,著重考慮了應用混裝乳化炸藥的鉆孔成本、深孔梯段成本、二次成本和后根底淺孔成本,以塊度、、安全為約束條件,以這四項成本最小為目標函數,廣泛收集各種經濟技術條件,建立了優化經濟數學模型。
  3. With the rapid development of road and communication of city, the harm effect that the blast vibration induced by building mass undergrounds or tunnels and digging blast underground structures act on the ground environment, are increasingly remarkable

    隨著道路、城市交通事業的迅速發展,大量地鐵、隧道的修築,淺埋地下結構的開挖,由此而導致的對地面設施,特別是對城市地面建築的危害效應越來越顯著。
  4. Cofferdam demolition blasting and vibration monitoring for yahekou thermal power station

    鴨河口火電廠取水口圍堰拆除觀測
  5. In this paper, combined with directional blasting of cooling tower engineering, some safety problems such as flying rock, blasting vibration, morphology vibration and blasting dust are introduced and analyzed, and more safeguard technologies are advise

    摘要文章結合冷卻塔定向拆除的實例,分別介紹了由引起的飛石、、塌落、碎碴飛濺和煙塵等安全間題,並對這些問題進行了分析,提出進一步提高安全的技術措施。
  6. Vibration monitoring for fresh concrete during plant foundation rock blasting at gongbo gorge hydropower station

    公伯峽水電站廠房基礎巖石開挖對新澆混凝土影響監測成果
  7. Analysis of factors affecting blasting vibration frequency

    頻率影響因素分析
  8. Testing and study of frequency specific property of blasting vibration

    頻率特性的測試與研究
  9. Engineering earthquake safety evaluation of the nuclear power station dam site and brige etc. seismic gonation and microgonation, earthquake disaters estimation and mitigation, engineering structure ' s dynamic characteristic etc

    核電站、大壩、大型橋梁等重大工程的地需安全性評價;地震區劃和小區劃,震賃評估、預測及其減賃對策,工程自特性和環境測試,公害的控制設計等。
  10. The process of stress change near the blasting cut was displayed objectively by the numerical simulation in different solid fea models. moreover, results of numerical analysis in blasting vibration load agree with the practical results, which show that ansys can be helpful to design and optimize the parameters of demolition blasting

    數值模擬結果客觀的再現了不同切口參數條件下的實體模型的受力情況,荷載的數值分析與實際結果相吻合,也證明了數值模擬方法在高聳建築物拆除中的適用性和科學性。
  11. Backout dynamic vibration testing analysis of the used guanlan bridge

    觀瀾大橋舊橋拆除測試分析
  12. Measurement amp; study of blasting vibration in demolition of high frame building

    高層框架樓拆除檢測與分析
  13. The paper suggests the new heat insulation materials and charge structures used under different temperatures condition of blasting objects, and presents the methods to avoid miss - fire and the measure to control the blasting shock and vibration damages to protected objects such as furnace lining, furnace body and back - up bearing

    推薦了被體在不同溫度條件下應採用的新型隔熱材料及裝藥結構,同時給出了施工過程中避免拒的方法及控制產生的沖擊對被保護對象(如爐襯、爐皮和支撐軸承等)危害的具體措施。
  14. Analysis of vibration response data of nuclear reactor structure by blasting vibration

    核島結構物在作用下的響應數據分析
  15. Study on the safety velocity for concrete lining under p wave loading

    波作用下襯砌混凝土的安全速度研究
  16. Control of blasting vibration of underground chamber at a hydropower station

    地下洞室控制研究
  17. This paper is on the basis of analysedding and summarized that these projects were blown up and tested materials in the past, use fracture mechanics, the dynamics blast theory and finite element analytical method, have carried on the system, detailed analysis and describes to this kind of method of blasting, proving theoretically that can cut the base rock effectively in this kind of method of blasting, reduce base blowing up stress value inside the rock, play and protect underpart base rock blow up into the function influenced in vibration, and blew up mechanism and analysed the main influence factor blown up according to it, had put forward the rational optimization measure to the relevant parameter when implementedding and blown up

    本文在分析總結以往這些工程試驗資料的基礎上,運用斷裂力學、力學理論及有限元分析方法,對這種方法進行了系統、詳細的分析及論述,從理論上證明此種方法可以有效地切割基巖面,降低基巖內部的應力值,起到保護下部基巖不受影響的作用,並根據其機理分析了的主要影響因素,對實施時的相關參數提出了合理的優化措施。
  18. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對力作用,進行邊坡的力響應分析,得出了以下結論: ( 1 )頻率為0 . 3hz時,坡面頂部水平向加速度峰值最大;綜合考慮,可認為該邊坡的自頻率為0 . 3hz左右; ( 2 )地形對存在放大作用,研究剖面的坡面,水平向加速度及位移在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,水平向位移及加速度絕對值均大於坡腳; ( 3 )強迫段,水平向加速度值隨時間變化的規律為:坡頂節點總的變化趨勢是越來越大,而坡體中部節點的變化趨勢是越來越小; ( 4 )當速較小時,變形壞的形式表現為坡頂表面滑塌型。
  19. Based on the numerical simulation method of finite element, the calculation method of particle vibration velocity, an important index reflecting the blasting vibration intensity, is discussed ; and an comparison analysis of the calculation results between two different kinds of charge structures decked with air and water is made

    基於有限元數值模擬方法的基礎上對反映強度的重要指標質點速度的計算方法進行了探討,並對空氣和水兩種不同間隔裝藥結構下的震強度計算結果進行了對比分析。
  20. Special emphasis is laid upon the construction operation process of flat tunnels with outsized span at even shallow depth, meanwhile, how to build large span flat tunnel is briefed in this article. measures taken to reduce vibrations caused by explosion in driving tunnel and surface subsidence and methods of monitoring and surveying in the course of construction are detailed in this article

    本文扼要介紹了大跨扁平隧道的施工方法,重點闡述了特大跨超淺埋扁平隧道的施工工藝過程,對和地表沉降的控制方法,以及施工監控量測的過程和方法,並通過對量測結果的分析,說明監控量測對施工的指導作用,並對圍巖穩定性進行了一些簡要分析。
分享友人