排水抽水站 的英文怎麼說
中文拼音 [bèishuǐchōushuǐzhàn]
排水抽水站
英文
drainage pump station- 排 : 排構詞成分。
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 抽 : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 排水 : drain off water; drain away water; dewatering
- 抽水站 : (揚水站; 泵站) pump [lift] station抽水站抽水能力 pumping plant capacity
- 抽水 : 1. (用水泵吸水) draw [pump] water 2. (縮水) (of cloth through wetting) shrink
-
Based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works
結合東雷抽黃續建工程幾座大型泵站廠房屋面施工的實際,介紹大型預制屋面的排水與滲漏問題及設計、施工方面應注意的事項,供類似工程參考。Abstract : based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works
文摘:結合東雷抽黃續建工程幾座大型泵站廠房屋面施工的實際,介紹大型預制屋面的排水與滲漏問題及設計、施工方面應注意的事項,供類似工程參考。Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control
第三十七條任何單位和個人不得破壞、侵佔、毀損水庫大壩、堤防、水閘、護岸、抽水站、排水渠系等防洪工程和水文、通信設施以及防汛備用的器材、物料等。By forcing air currents through a water chamber, the system is effective and reliable in removing the unpleasant gases, thus reducing the odour nuisance to an acceptable level stipulated in the environmental guidelines
透過站內的強力抽氣扇,排氣須經過水力洗滌系統,利用水炮有效去除惡臭味,使排氣質素提升至可以接受的程度。Construction of lagoons reservoirs in the reclamation area will block existing pumping station intake and outfall pipes
-在填海區內興建瀉湖蓄水庫會阻礙現有抽水站的進水及排水管道。When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer
用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的預期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉爐爐次計劃的編制有很高的要求,合理安排來料、煉鋼與澆鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進行。Waterproof and drainage design of access gallery in pushihe pumped - storage power station
蒲石河抽水蓄能電站交通隧道防排水設計The second phase of the project can be described as the expansion of the first phase, as they have the same lower reservoir and the same upper reservoir
蒲石河抽水蓄能電站二期工程,就其工程布置及施工安排,相當於一期工程的擴建工程。The bureau is taking steps to upgrade storm water and wastewater facilities including sewer pipeline systems and pumping stations, and develop facilities to strengthen controls over rainwater overflow
因此,下水道局和抽水站正採取措施增強雨水排水設施能力,整備控制雨水溢出的設施。Drainage improvement in northern hong kong island - sheung wan stormwater pumping station and the associated intercepting drains
港島北部雨水排放系統改善計劃上環雨水抽水站及相關的截流渠To counter the above mentioned problems, this thesis is based on the practical situation of pump station operation to analyse its operation cost. the operation cost of pump stations consists of fixed and variable parts. to find the fixed and variable cost, the idea of investment allotment method ( iam ) is introduced to obtain the depreciation cost which is the main part of fixed cost
本論文針對上述兩方面問題,從我國大型泵站實際情況出發,對具有雙重功能? ?供水(含灌溉) 、排澇功能的泵站進行成本分析,提出投資分攤方法來解決固定成本中的固定資產折舊費問題,而用優化調度手段來推求泵站運行成本中的變動成本核心? ?抽水耗電費用。分享友人