排水渠工人 的英文怎麼說
中文拼音 [bèishuǐqúgōngrén]
排水渠工人
英文
drainlayer-
Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control
第三十七條任何單位和個人不得破壞、侵佔、毀損水庫大壩、堤防、水閘、護岸、抽水站、排水渠系等防洪工程和水文、通信設施以及防汛備用的器材、物料等。Roadside gullies are generally cleared manually every two weeks. application of larvicidal oil is done on weekly basis as a precaution against mosquito breeding. dirt and refuse taken from gullies are delivered to refuse collection points
在本港的道路上,大部分排水溝渠的垃圾和沙泥是由本署清潔工人以人手清理,通常每2星期清理1次,每星期需加上滅蚊油,以防蚊蟲滋生。To tie in with the temporary traffic arrangment for the west kowloon drainage improvement works at dundas street, the part - time pedestrian areas at sai yeung choi street south between soy street and dundas street, and soy street between sai yeung choi street south and fa yuen street are temporarily suspended
渠務署在登打士街進行西九雨水排放系統改善的工程,位於西洋菜街南介乎豉油街與登打士街及豉油街介乎西洋菜街南與花園街之部份時間行人專用區會暫時取消,改為全日通車。Drainage improvement in southern lantau in attendance for 102cd, 119cd and 128cd : director of drainage services chief engineer drainage projects, drainage services department
就102cd 119cd和128cd三個議程項目出席會議的人員:渠務署署長渠務署總工程師排水工程分享友人