排水路線 的英文怎麼說

中文拼音 [bèishuǐxiàn]
排水路線 英文
drainage route
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 排水 : drain off water; drain away water; dewatering
  • 路線 : 1. (從一地到另一地所經過的道路) route; itinerary; way; tail; line 2. (思想上、政治上或工作上所遵循的根本途徑) line
  1. Vsp is both a pivotal tache in logistic distribution optimization and indispensable in electronic commerce. it can increase logistic economic benefit and realize logistic rationalization. the systemic study on the theory and method of vsp is the base on the growth of logistic intensivism, the establishment of modem chain of command, the development of its and ec. now, the problem is not only applied to the field of auto transportation, but also to ship avigation communication electricity industry management computer application etc. the algorithm has been applied into many combinatorial optimization problems such as the trainman ' s shift arrangement in avigation the optimization design of cargo arrangement in ship company

    對貨運車輛進行調度優化,可以提高物流經濟效益、實現物流科學化。對貨運車輛調度優化理論與方法進行系統研究是物流集約化發展、建立現代調度指揮系統、發展智能交通運輸系統和開展電子商務的基礎。目前,問題的形式已有很大發展,該問題以不僅僅局限於汽車運輸領域,在運、航空、通訊、電力、工業管理、計算機應用等領域也有一定的應用,其演算法已用於航空乘務員輪班安、輪船公司運送貨物經過港口與貨物安的優化設計、交通車、生產系統中的計劃與控制等多種組合優化問題。
  2. High performance and high precision copper and copper alloy strips, electrolytic copper foil, lead frame, copper clad and printed - circuit board, special enameled copper wire, fashioned copper bar, track contact wire, medium and high elastic copper strips for interconnecting devices, precision alloy copper pipes for ac and cooling appliance, over - long and corrosion - resistant copper alloy condenser pipe, seamless cooper water pipe in housing construction and other copper fine and deep processing products will be highly developed in jiangxi province

    江西將重點發展高性能高精度銅及銅合金板帶、電解銅箔、引框架、覆銅板及印刷電板、特種漆包、異型銅、軌道接觸、接插元件用中高彈性銅帶材、空調與製冷精密合金銅管、超長耐腐蝕銅合金冷凝管、建築用無縫銅管等10項銅精深加工產品。
  3. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨新田東面主要道的單行車道橋,以連接沿該主要道東面近車輛輪候區的現有未命名道與淳裕
  4. The new district has independent public utility systems of water supply, drainage, heating supply, gas, wideband network ( wbn ), cable tv, independent sewage and garbage disposal facilities

    新區內有獨立的供、供熱、供電、燃氣、寬帶網、有電視等公用設施系統,獨立設置污處理及垃圾處理設施。
  5. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親平臺、沙灘浴場及停車場的道和景觀設計,對東湖環湖的面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊的文化性、藝術性和獨特性,合理安布置配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽
  6. Lorazepam was synthesized by the following seven steps : condensation reaction ( 1 ), condensation reaction ( 2 ), cyclic reaction, ring expanding reaction, acylate reaction, hydrolysis reaction and refining

    摘要詳細設計了勞拉西泮的合成,主要過程有縮合反應(一) 、縮合反應(二) 、環合反應、擴環反應、酰化重反應和解反應。
  7. ( 5 ) taking full of advantage of the ado. net and asp. net technology under the. net platform. it construct a powerful remote control and monitor system and meet the reqirment of the users. in order to achieve real - time control, it design a front environments built on the asp. net structure, from which the system can fulfill the real - time function. due to the characteristic of drain off water pump station remote control and monitor system ( big pump station need high voltage ( 6000v ) and great power ), so now do n ' t adopt the ways that client _ end controls it. in addition, the server - end design a database to manage from which the system could tackle users information and online users log in the form of winform and strengthen the safety of the system

    Net平臺下的ado . net與asp . net技術,發揮兩者的武漢理工大學碩士學位論文優勢,構造了功能更強的遠程監控系統,更好的滿足用戶的需要。系統設計中以asp . net架構為前臺環境,實現了客戶端通過ie瀏覽器來實時的監控到泵站的運行情況,使系統達到了實時監視,但由於大泵機工作電壓高( 6000v )功率大( 100okw )的特點,暫不採用客戶端控制系統。在服務端,設計了數據庫,並且以winform的形式來管理網管理員和用戶的信息以及在用戶的日誌,加強了系統的安全性。
  8. Because of deposit the ground form, wide soft soil and large thickness, we should use the methods to set up the standard design., such as to change and fill out a stone, lump block of stone of the strong rammer and split off the thick liquid of note and so on

    摘要深圳市港灣大道沿屬前海灣沿岸海漫灘沉積地貌,軟土層分佈范圍廣、厚度大、性狀極差,闡述該採用的換填塊石、劈裂注漿、插板堆載預壓、強夯塊石墩等地基處理方法,進行了標準設計。
  9. The line is mainly used for producing foamed pvc pipes. those pipe are widely used in sewer, electricity and tele - communication cables, drainage for airport and railway projects irrigation pipes, etc

    該生產主要用於生產pvc發泡管材,生產的芯層發泡管材廣泛適用於下管道。電力及道通訊。電纜導管、機場道和鐵管、低孔灌溉輸管。
  10. Comprehensive arrangement the location of kitchen & toilet in the house, rational division of the space of the kitchen & toilet ( eg. it is necessary to separate the dry from humid space in toilet, the clean from contaminated space in kitchen ), it is emphasized that decent space for kitchen & toilet and some flexible space is advocated in the design, the appurtenances arrangement should be coped with the human engineer, it is better to design pipe well and equipment layer to accommodate the various meters, wires and pipes. in order to save energy and water, it is recommend to use solar energy and the different quality water

    本著「以人為本」的設計思想,提出適宜經濟適用住宅的整體廚衛設計思和方法,即:綜合協調廚衛在住宅中的位置;對廚衛空間進行合理分隔(衛生間干濕分離,廚房潔污分離) ;廚衛各空間必須具有適宜的空間尺度和面積保障,並提倡具備一定的面積彈性設計;依據人體工效學原理進行廚衛部分設備的綜合布局;利用管道井、設備層綜合布局各種管儀表;採用分質供設計系統和太陽能供能系統,達到節節能;注重廚衛的煙通風設計,提高室內環境質量;考慮廚衛的適應能力,注重通用設計。
  11. Ackout of original indoor fitment, fitment of the ball bar, lightening, catv, telephone, computer pipeline and the installation of the drainage

    室內原裝修拆除,球吧裝修工程,電氣照明有電視電話計算機管及給安裝工程。
  12. Associated civil, structural, electrical and mechanical, geotechnical, landscape and drainage works, fire services, water works, environmental mitigation measures, street lighting, traffic aids and directional signs

    進行相關的土木結構機電土力環境美化和渠工程安裝消防設備設置務設施實施紓減環境影響措施裝設街道照明設施輔助交通設備和指示標志。
  13. E associated civil, structural, electrical and mechanical, geotechnical, landscape and drainage works, fire services, water works, environmental mitigation measures, street lighting, traffic aids and directional signs

    E進行相關的土木結構機電土力環境美化和渠工程安裝消防設備設置務設施實施紓減環境影響措施裝設街道照明設施輔助交通設備和指示標志。
  14. This thesis aims at putting forward the designation routes of an automatic monitoring & controlling system of a mine drainage pipelines for the purpose of solving the problem

    由此提出礦山污輸自動監控系統的設計思以解決問題。
  15. After acquiring the land for the hsr taichung station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵臺中車站地區區段徵收公共工程施工項目包括:整地工程道工程工程自來工程污工程公共照明工作及傳統管埋設工程橋梁工程等。
  16. The conclusions have been deduced from the detailed analysis of a set of experimental results as below : 1 ) the formula of tangent young ' s modulus et has been established during the unloading process ; 2 ) the shearing features of the samples are similar to undrained test even though there are draining paths so the possion ratio of the sample is about 0. 5 ; 3 ) unloading paths have little effects on the shearing strength parameters

    通過對試驗結果的分析得到: 1 )任一時刻土體的切彈性模量公式; 2 )卸載情況下盡管存在通道,但試樣仍基本上表現為不的性狀,按廣義虎克定律得到的泊松比在0 . 5附近; 3 )卸荷應力徑對土體的強度參數影響不大。
  17. Introduction : i, a raiders game. pipes, chimneys, antennas into the middle floor of the two roads open umbrella, put the right platform for shoring point out, flowerpots, black chimneys, two windows closed to no avail

    第一集游戲攻略1 .管,煙囪,把天放到兩樓中間鋪,打開傘,把平臺右邊的支撐物點掉,花盆,黑色煙囪,兩扇窗關閉注意掌握時間。
  18. Allocate the principle of the basis of the cubic metre of earth and stone, combine the characteristics of limestone geology of mountain area and ecological environment, we set up the mathematical model of the linear programming, which is suitable for limestone mountain area large system cubic metre of earth and stone of expressway, meanwhile we put forward systematic thinking of treatment and method through the remaining cubic metre of earth and stone after allocating, at the same time, we give the protective measure on abandon soil field and fetch earth field about environmental ; making the discussion on medical treatment of natural river system and underground river system of the slope recover

    根據土石方調配原則,結合石灰巖山區地質和生態環境的特點,建立了適合於石灰巖山區高速公的大系統土石方調配性規劃數學模型,同時對通過調配后剩餘的土石方提出了系統的處理思和方法,並對棄土場提出了系統的環境保護措施;對各種設施的設置與自然系的調治恢復相結合做了初步探討。第三,塹邊坡環境恢復。邊坡景觀是公景觀的重要組成部分,是高速公環境保護研究的主要內容。
  19. 3 the permit holder shall deposit with the director 3 sets of 1 to 1000 scale layout drawings showing the works boundaries, drainage channel, ancillary road alignments and any other facilities assessed in the eia report ; the locations of environmental mitigation measures recommended in the eia report ; and an explanatory statement

    許可證持有人須向署長存放下列文件,計有: 3套1 : 1000比例的設計規劃圖則,顯示工程界道、附屬道及環評報告所評估的任何其他設施;環評報告所建議的環境緩解措施的地點;以及一份解釋說明。
  20. The company used advanced technologies routes reasonable quality sound system, the detection means complete, and the production base of environmental protection facilities, and sewage to the national testing, standards, products through salt city binhai county and technical supervision approval, production reached 3, 000 ~ 4, 000 tons of products since the company has put on the market, service quality and sales are leading domestic level, products and services have been well received unanimous

    本公司採用的技術工藝先進合理,質保體系完善,檢測手段齊全,生產基地環保設施齊全,污放達到國家檢測、標準,產品通過鹽城市濱海縣技術監督局的認可,年生產量達到3000 4000噸,自公司產品投放市場以來,質量和銷售量均處國內領先平,產品與服務都得到一致好評。
分享友人