排煙裝置 的英文怎麼說

中文拼音 [bèiyānzhuāngzhì]
排煙裝置 英文
fume exhaust facilities
  • : 排構詞成分。
  • : Ⅰ名詞1 (物質燃燒時產生的氣體) smoke 2 (像煙的東西) mist; vapour 3 (煙草) tobacco 4 (紙煙、...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 排煙 : eject smoke; discharge smoke排煙道 smokejack; discharge flue; 排煙器 smoke ejector; 排煙裝置 fume extractor
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. In the third, this paper makes a survey on components of the exhausted flue gas and waste heat resource, and discusses the possibility and methods of steam generation and air preheating with the waste heat. and then, the analysis on the advantages and disadvantages of heat recovery plants with conventional steel - water heat pipes and inorganic heat - transfer heat pipes is carried out. the paper also gives a valuation about the plan and features of the design of heat recovery

    對余熱源的成分和余熱資源量進行標定,討論余熱回收產生蒸汽或加熱燃燒用空氣的可行性和方法,分析常規余熱回收技術設計、採用普通鋼-水熱管和無機傳熱熱管等傳熱元件的設計余熱回收的優缺點,並對余熱回收設計方案及其特點進行總體評價。
  2. Sand island the ventilation system isn ' t working. i can ' t see a thing through the smoke

    排煙裝置不起作用了。在濃里我甚麼都看不到!
  3. Fume extractor and dedulfurizing installation : wet and dry ventilation duct

    脫硫:溫式乾式通風道
  4. Abstract : the causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    文摘:分析了金陵石油化工公司煉油廠二套常減壓加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,溫度高,氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,溫度降至170左右,的爐效率由83 %左右提高到90 %以上
  5. The causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    分析了金陵石油化工公司煉油廠二套常減壓加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,溫度高,氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.測定結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,溫度降至170左右,的爐效率由83 %左右提高到90 %以上
  6. The timing - and - quantitation precision injection of lpg was realized with high - speed lpg solenoid valve and a set of electronic control system, which was designed by the author and can flexibly control the gas supply system of lpg. based on the analysis of experimental data got by comparing the performances before and after the application of the set of equipment on lr6105q12 diesel engine, the effects of load, speed and replace ratio, etc on the emissions of smoke, hc and co of dual fuel engine were expounded. through optimization, the smoke emission was utmostly reduced and the emissions of hc and co were within the government restriction

    為此,本文通過對各個方案進行詳細比較,選擇了電控多點順序噴射的供氣方案;利用高速lpg噴射閥和自己獨立開發出一套電子控制系統對lpg供氣進行靈活地控制,實現了lpg的定時定量噴射,並把這套應用到中國一拖生產的lr6105q12柴油機上,在對改前後的發動機進行大量試驗和分析的基礎上,闡明了負荷、轉速、摻燒比等因素對雙燃料發動機的度、 hc 、 co等放的影響情況,並且通過優化,最大限度地降低了發動機的放,同時使hc 、 co放限制在國家標準規定的范圍之內。
  7. Reciprocating internal combustion engines - exhaust emission measurement - part 9 : test cycles and test procedures for test - bed measurement of exhaust gas smoke emissions from compression ignition engines operating under transient conditions

    往復式內燃機.廢氣放測量.第9部分:瞬時條件下工作的壓縮點燃的廢氣放的試驗床測量的試驗循環和試驗過程
  8. Compared with natural ventilating up - draft barn, the common curing barn installed with " automatic controlling temperature and forced humid air exhausting apparatus " can enhance evidently superior leaves ratio, average price and income of raw tobacco, decrease evidently substandard tobacco leaves ratio, lighten work hardness, shorten curing time, reduce fuel consumption, save labor power and reduce curing cost

    摘要普通烤房安「烤自動控溫強制」后,與自然通風氣流上升式烤房相比,烤后的葉在上等率、均價、收益等方面都有明顯提高,級外明顯減少,此外,還能降低勞動強度,縮短烘烤時間,減少燃料消耗,節約勞動力,降低烘烤成本。
  9. Power station emission control, including a ban on the construction of new coal - fired or oil - fired power plants, the use of liquefied natural gas for power generation and the fitting of air - scrubbers to all power plants

    發電廠放管制,包括禁止興建燃煤發電廠或燃油發電廠、推行使用液化天然氣發電,以及於所有發電廠安氣減
  10. The problem of acid rain is still severity, in the fossil power plant, the flue gas desulfurization is the main approach on controlling the let of so2. the paper mostly introduce the dcs rebuilding project of the desulfurization system in. the equipment is first introduced into our country from mitsubishi corporation, which is the wet limestone - gypsum flue gas desulfurization equipment

    火電廠氣脫硫是控制so _ 2放的主要途徑。本文主要介紹華能珞璜電廠脫硫系統的dcs改造工程。該是國內首家引進的日本三菱重工公司濕式石灰石石膏法氣脫硫
  11. Air - conditioner, heat sources, cooling coils, heating coils, reheaters, smoke exhaust systems, air handling units, fan coil units, room air units, etc

    空氣調節冷氣機、發熱線圈、冷卻線圈、加熱器、系統、風櫃、風機盤管、窗口機等
  12. Smoke and heat control installations - part 5 : powered smoke exhaust systems ; requirements, design

    和熱控制.第5部分:動力系統.設計要求
  13. Sludge disposal system availability range from c13 superscript bin discharging sludge dewatering mouth, until dry sludge provide material, burning, smoke and ash emissions purification of the entire output of mechanical equipment, process pipelines, electrical equipment, instrument control system and civil engineering, including the whole project within the scope of the design, construction, manufacture, installation, and trial run and test run after the normal operation of the after - sales service

    污泥處系統供貨范圍從c13標脫水污泥料倉出料口開始,直到干化污泥出料、焚燒、氣凈化放和灰渣輸出為止的整套機械設備、工藝管道、電氣設備、儀控系統和土建工程,包括整個工程范圍內的設計、施工、製造、安調試、試運行及正常運行后的售後服務。
  14. Instruments and apparatus - part 10 : flue and exhaust gas analyses

    和儀器.第10部分:道及放氣體分析
  15. As the first of a series of new initiatives to preserve a clean and green campus, the university introduced its first environment - friendly shuttle bus today. the bus was installed with diesel oxidation catalysts to reduce smoke emissions. the university plans to install this device to all the shuttle buses to ensure cleaner air on the campus

    大學推行環保方案的第一步就是首部環保校巴投入服務,這部校巴安了柴油催化器以減少黑放,大學計劃在所有校巴添柴油摧化器,並於適當時候使用超低含硫量的柴油。
分享友人