掛籃 的英文怎麼說

中文拼音 [guàlán]
掛籃 英文
cradle
  • : Ⅰ動詞1 (使物體附著于某處) hang; put up; suspend 2 (中斷電話) ring off 3 [方言] (接通電話; 打...
  • : 1. (籃子) basket 2. [體育] (籃球架上的鐵圈和網) basket
  1. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度橋梁懸臂澆築施工的各種形式掛籃施工工藝進行了比較和總結,對連續剛構橋懸臂澆築掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂澆築施工的新型桁架斜拉式組合掛籃,並進行了可行性分析計算和設計。
  2. Dining - table is using two green, white colors to decorate the having readjusted oneself to a certain extent fish jar and delicate and fragile fishing rod of centre, every is a green ribbon on the fishing pole, is hanging to give guest ' s gift or a exquisite celluloid fish, or a fish filling candy to full basket

    餐桌用綠、白兩色裝飾起來中間放上魚缸和小巧玲瓏的釣魚竿,每個釣竿上系一條綠色飄帶,著送給客人的禮物? ?或是一個精巧的賽璐珞魚,或是一個裝滿糖果的魚子。
  3. A usually open gondola suspended from a hot - air balloon

    在熱氣球上,通常為敞口的吊
  4. Cantilever construction technology of triangle hanging basket

    三角掛籃懸臂施工技術
  5. The basket symmetrical cantilever construction, which is often used, is one way of large - span bridge construction. with the length of cantilever longer, the risk is increased as well

    掛籃對稱懸臂施工是大跨度橋梁施工中常用的一種方法,隨著懸臂長度的加長,風險也隨之加大。
  6. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  7. Secondly, the construction techniques of cantilever concreting method of girder are analyzed in details. the construction program of stay rope formwork traveler, including the selection of formwork traveler type and the design of formwork traveler, is introduced

    本文重點分析了主梁的懸灌施工技術,從掛籃方案的比選與定型,到掛籃的設計與使用都做了詳細的介紹,本橋採用牽索式掛籃施工方案。
  8. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  9. Further more, with the reference of testing information, the paper analyzed the traveler construction technique, obtained the guy rope stress and the front - end bottom mark of traveler for each step. using fem theory and large general - purpose program ansys, the paper discussed the cable - stayed bridge space stress characteristic and the relationship between several main design parameters

    以此為基礎,參照試驗資料,詳細分析了斜拉橋施工中掛籃的施工工藝,及其各個狀態下的受力情況,得出在各個階段掛籃牽索的索力值及掛籃前端各個工況的主梁底立模標高。
  10. Design of continuous triangle rigid structure suspended wagon

    大跨度連續剛構輕型三角形掛籃的設計
  11. An introduction to the eight - meter hanging basket of the load - bearing unbalanced heavy cantilever

    桁架式無平衡重懸臂八米掛籃介紹
  12. Design and feasible research of a triangular composite hanging basket concerning the roof truss

    桁架三角型組合掛籃的可行性研究和設計
  13. The new method of the construction with guyed travelers has been applied in bridge construction in recent years

    摘要掛籃施工是近幾年才應用於橋梁施工工程的一種新方法。
  14. As for the safety of bridge construction, it is necessary to guarantee the design line of the bridge, but the positioning precision with guyed travelers is the most important

    橋梁安全性能如何,施工能否保證橋梁的設計線型是關鍵,而掛籃的定位精度是保證線型的首要前提。
  15. At the same time, the roof truss and cable - state composite hanging basket in the paper is also an idea structure in bridge construction. especially, the significance is obvious in mountain area

    同時,提出並設計的新型斜拉式組合掛籃是一種較為理想的重載輕型掛籃形式,在塊件重量重的大跨度橋梁的施工中有較大的優越性。
  16. 4. wind load has great influence on construction, but the self error of casting girder and basket load have greater influence, especially, basket falling is directly responsible for the safety of construction

    4 .得到風載對施工期可靠度影響比較大,而已澆梁段的自重偏差和掛籃荷載影響很大,特別是掛籃跌落直接關繫到施工期橋梁的安全性。
  17. ( 2 ) development and application of the light - type cable - stayed hanging - cradle for railway, the hanging - cradle was applied in the construction of large span railway prestressed continous beem bridge, the quality and schedule of the construction was ensured

    ( 2 )開發、應用鐵路輕型斜拉式掛籃,施工大跨度鐵路預應力混凝土連續梁,保證了工程質量,達到了最快6d澆築t構一對梁段的施工進度。
  18. 2. the random nature of load construction is analyzed. according to analyze various factors on change of reliability index, casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling, which influence on construction reliability of rigid frame bridge with high - pier and large - span, are obtained

    2 .研究了各施工荷載的隨機性,通過分析各種影響因素對可靠指標的變化程度,得到已澆梁段、施工分佈活載、混凝土強度、風載和施工荷載偏差以及掛籃跌落等對高墩大跨剛構橋施工期可靠度的影響。
  19. The paper, in the light of my bureau ' s construction experience and project practice in constructing large span prestressed continuous beam bridge ( continuous rigid frame ) in recent dozens of years, introduces a new thinking about the standardized design of cable - stayed hanging basket and the standardized construction technology of the continuous beam bridge ( continuous rigid frame ), gives the detailed account of a series of construction technique and achievements such as : the development and construction ways of large span continuous beam bridge, the standardized design thinking and operation of cable - stayed hanging basket, the standardized construction technology of the continuous beam bridge ( continuous rigid frame ) etc., meanwhile, it is attached with a whole set of detailed standardized design sample drawings of cable - stayed hanging basket

    本文根據我局十幾年來修建大跨度預應力連續梁(連續剛構)橋的施工經驗和工程實例,介紹了一種斜拉式掛籃標準化設計的新思路及連續梁(連續剛構)橋標準化施工工藝。詳細敘述了大跨度連續梁橋的發展、施工方法、斜拉式掛籃標準化設計思路及做法、連續梁(連續剛構)橋標準化施工工藝等一系列施工技術及成果,並附有全套詳細的斜拉式藍標準化設計定型圖。對同類型橋梁的施工及掛籃設計具有參考價值。
  20. The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test

    本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下鉆孔樁施工、承載力3000kn斜拉式掛籃開發與研製、梁部施工、新型橋面鋪裝層施工技術及動靜載試驗。
分享友人