採油作業 的英文怎麼說

中文拼音 [cǎiyóuzuò]
採油作業 英文
production practice
  • : Ⅰ名詞1 (脂肪; 油脂) oil; fat; grease 2 (姓氏) a surname Ⅱ動詞1 (用桐油、油漆等塗抹) apply t...
  • : Ⅰ名詞1 (行業) line of business; trade; industry 2 (職業) occupation; profession; employment; ...
  1. In the course of working, , the plow will make use of the shuttling method so that it can dig alternately either on the left or on the right. compared to the unilateral plow, it can improve the productivity because it can help leave off the soil 、 take from the consumed energy and reduce the empty journey. to meet the requests above, we will use a remote cylinder with both a small cubage and double functions, approximately designing the plow to be columniform and symmetric. after the experiment for a period in the field, we found that the most frayed areas had happened at the places of both plow shank and share and at the same time the base of the remote cylinder had ruptured suddenly

    與單向犁相比,其優點在於:耕地無開、閉壟,地表平整,降低了耕后整地的能量消耗,減少了地頭的空行程,因而大大提高班次生產率。為了滿足犁體梭式的要求,我們用了一隻小容積雙用的液壓缸;同時對犁壁曲面的形狀用了近似圓柱形的對稱設計。但經過一段時間的田間試驗,我們發現:該犁犁胸部分的犁脛和犁鏵上的犁尖在工中磨損較為嚴重;主犁梁和缸缸體的連接部分(即缸底座)突然發生了斷裂,造成整個犁體無法正常工
  2. The subsea wellhead production system, named building block subsea system, adopts the most advanced technologies in the world, including the subsea horizontal christmas tree, electro - hydraulic control system, mudline booster pump, umbilical assembly, host, and rov, etc

    被稱為「組塊搭接式控制系統」的水下井口生產系統,薈萃了當今世界的尖端技術,包括雙定位水下臥式樹、電/液控制系統、泥線增壓泵、電纜系統、折疊式鉆井底盤系統和遙控機器人等。
  3. Petroleum and natural gas industries - design and operation of subsea production systems - completion workover riser systems

    和天然氣工.水下系統的設計和操.完井修井提升管系統
  4. It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up

    本船改建后為非自航固定式起重船,以港口及平水區域為主,可在我國沿海ii類航區中調遺拖航,適用於打撈船舶港口建設橋梁吊裝裝卸重大物件,以及海上石鉆井平臺和其他海上弔裝工程。
  5. Design and downhole operation of continuous gas lift

    連續氣舉井設計及施工
  6. Safety regulation of offshore oil recovery and downhole operation

    淺海與井下安全規程
  7. If pre - drilling mode was taken in an offshore oil development, pgb - free well drilling technology might be adopted for supplementary wells when the pgb slots were totally occupied

    摘要用預鉆井方式開發的海上氣田,對水下鉆井基盤鉆井槽孔用完后增鉆的調整井,可用無基盤鉆井方式
  8. The plate and frame filter design is the standard in basic process depth filtration for clarification and pre - filtration in industries such as the pharmaceutical, chemical, cosmetic, food beverage, and electric utility

    板框壓濾機通常用濾板為過濾介質,有特殊要求時也可以用紙板為過濾介質,如石的精細過濾過程用濾紙為過濾介質。
  9. Therefore, a positive research method was adopted to put forward two hypotheses during the oil and gas drilling works, i. e, a certain relation existed between operation ' s cost and drilling footage and cycle respectively

    為此,用實證研究方法,針對氣鉆井的過程提出兩個假設:鉆井成本與鉆井進尺呈一定的比例關系;鉆井成本與鉆井周期呈一定的比例關系。
  10. According to the requirements of oil salvage operation and ground equipment, research and develop a system to conduct the dynamic test on the speed and position of oil extractor, and the tension supported by steel wire, with c8051f330 single - chip microcomputer as the core module, hall - effect sensor and resistance sensor as the test components

    摘要根據撈和地面設備的需求,研製一種以c8051f330單片機為核心,用霍爾傳感器和電阻應變片為檢測元件,實現付撈抽子升降速度、位置和鋼絲拉繩所承受拉力的動態檢測系統。
  11. Using upper printing system easy to check ink voume and efficient for changing plate

    用上板印刷系統,可自視檢查墨狀及換板方便迅速。
  12. Using upper printing system easy to check ink volume and efficient for changing plate

    用上板印刷系統,可自視檢查墨狀況及換板方便迅速。
  13. Petroleum and natural gas industries - design and operation of subsea production systems - subsea wellhead and tree equipment

    和天然氣工.水下系統的設計和操.井口和樹設備
  14. Petroleum and natural gas industries - design and operation of subsea production systems - general requirements and recommendations

    和天然氣工.水下系統的設計和操.一般要求和建議
  15. Petroleum and natural gas industries - design and operation of subsea production systems - part 4 : subsea welhead and tree equipment

    和天然氣工.水下系統的設計和操.第4部分:井口和樹設備
  16. Petroleum and natural gas industries - design and operation of subsea production systems - flexible pipe systems for subsea and marine applications

    和天然氣工.水下系統的設計和操.海底和海洋設備用軟管系統
  17. Petroleum and natural gas industries - design and operation of subsea production systems - part 3 : through flowline systems iso 13628 - 3 : 2000 ; german and english version en iso 13628 - 3 : 2000

    和天然氣工.水下系統的設計和操.第3部分
  18. Petroleum and natural gas industries - design and operation of subsea production systems - part 1 : general requirements and recommendations iso 13628 - 1 : 2005 ; english version en iso 13628 - 1 : 2005

    和天然氣工.水下系統的設計和操.第1部分
  19. Article 32. vessels, when bunkering or loading and unloading oil, must observe operating instructions and take effective measures to prevent oil spills

    第三十二條船舶進行加和裝卸時,必須遵守操規程,取有效的預防措施,防止發生漏事故。
  20. In response to british government encouragement of carbon dioxide capture and storage efforts, oil companies are proposing novel capture projects at natural gas power plants that are coupled with enhanced oil recovery ventures at fields underneath the north sea

    為響應英國政府對於二氧化碳捕集與儲藏工的獎勵措施,石公司正研擬新型捕集方案,對象為兼營北海海床下方田、從事激勵的天然氣發電廠。
分享友人