採石開挖面 的英文怎麼說

中文拼音 [cǎidànkāimiàn]
採石開挖面 英文
quarry face
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫板堆壩壩基處理和防滲的原則及設計要點.趾板基礎和堆體各區砂礫基礎,除趾板與其下游1 / 9底寬范圍以及壩腳除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位用混凝土塞,其它部位用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為板堆壩的設計和研究提供參考與借鑒
  2. Excavating riverbeds in one channel may not only reduce the velocity area in some areas but also increase the velocity in other areas by increasing flow rate in this channel without correspondent changes in riverbeds of rocky rapids. in result, the velocity in waterway may be increased instead of be reduced, the flow condition may also be deteriorated. thus, which branch should be excavated and how to excavate in improving the flow condition of the branch should be further explored

    但在分汊河道內,情況較為復雜,在一汊河道內措施后,雖然其過水斷有所增加,局部流速相應降低,但是由於工程后,汊道的分流比將會相應變化,而質河床一般無法通過沖淤變化以適應水流條件的改變,因此,航道內工程處的流速可能降低,也可能不降反而有所增加,惡化了航道的水流條件。
  3. Abstract : variations of flow pattern, flow velocity in deep poo l and side bar, mainstream thread, and water surface, caused by excavation project, are investigated by two - dimensional mathematical model in an orthogonal curvili near coordinate system. the change of bed - load transport rate, and redeposition r ate are predicted. the influences of the excavation project on navigation are ana lyzed. grid - type and flat - type excavation alternatives are proposed and discuss ed

    文摘:用正交曲線坐標系下的河道平二維數學模型,研究了嘉陵江何家磧邊灘采砂后河道流勢、流態、灘槽流速、主流位置、水高程及比降的變化規律,預測了采砂方案完成後卵推移質輸沙率變化及其對航道的影響,並對格形和平整方案進行了比較分析
  4. Abstract : in the filling construction of lianhua concrete face rockfill dam, we have paid attention to plan the material sources according to the actual conditions, such as, using the excavated materials in other structures in order to reduce the cost, adopting the measures of filling by zones to quicken the construction progress and solve the construction problems during the cold seasons, using the convenient transportation roads to the dam and good road surface quality to ensure the high intensity filling, and selecting the rational construction equipment to make full use of the all equipment

    文摘:蓮花板堆壩填築施工中,注意對築壩料源做出符合工程實際情況的規劃:利用其他建築物的料降低造價;用分區填築的措施,加快施工進度和解決寒冷季節施工問題;方便的上壩交通道路網和良好的路,為高強度填築提供有力保證;選擇合理配套的施工設備使設備得到優化利用。
分享友人