接合試驗器 的英文怎麼說

中文拼音 [jiēshìyàn]
接合試驗器 英文
bond tester
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • 接合 : joint; zygosis; juncture; articulation; concrescent; nexus; coaptation; syndesis; synapsis; meet;...
  • 試驗 : trial; experiment; test
  1. Docking mechanism test - bed is mainly used to simulate dynamics process of two aerocraft ’ s docking on the ground, validate rationality of the mechanism ’ s design and estimate stability of the docking process

    機構綜臺主要用於地面模擬空間兩飛行的動力學過程,對機構設計的理性、對過程中的穩定性進行證和評估。
  2. The damage of the transducer was avoided, so the ability of over - loading can be improved highly. in order to acquire a good hermetic seal between the diaphragm and the base plate, two sealing methods were used, namely, compound method and crystallite method

    通過對比,確定了介質腔的厚度,使陶瓷膜片在過載時與基座觸,從而避免了傳感的過載損壞,使傳感的抗過載能力大大提高。研究了復法和結晶法兩種封方式,使陶瓷基座與膜片達到良好的匹配封
  3. Aerospace series. elements of electrical and optical connection. test methods. part 414 : unmating of lanyard release connectors

    航空航天系列.電氣及光學連元件.方法.第414部分:牽索釋放連的非配
  4. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - examinations and measurements - attenuation of random mated connectors

    光纖互連設備和無源元件.基本和測量程序.檢和測量.隨機配的衰變
  5. Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 3 - 34 : examinations and measurements ; attenuation of random mated connectors

    纖維光學互連件和無源元件.基本和測量程序.第3 - 34部分:檢查和測量.隨機插的衰減
  6. The fem analysis for the three structures of sling screw - thread - based, namely the circle, rectangle and that with strengthen plate, and the tensile test for sling screw - thread - based in torpedo body show, that the bonding with strengthen frp plate between load - bearing metal parts and frp hull with hatch can reduce the stress concentration and significantly decline the local stress in frp hull with hatch. this structure can also be used in the similar produces. ( 3 ) the effects of parameters for bonding process on the adhesive strength and leakproof are discussed, such as the bonding interface reduce, bonding surface treatment, match of adhesive surface, protect for adhesive seam and so on

    本文通過某型號雷體吊耳螺紋座結構的三種方案,即圓形昂耳螺紋座、長方形吊耳螺紋座、具有增強板的吊耳螺紋座的有限元分析及雷體吊耳螺紋座拉力結果證明:金屬承力件與開口玻璃鋼殼體粘採用玻璃鋼增強板補強,緩和了應力集中,使開口殼體局部應力明顯降低,類似的水下兵用金屬承力件與開口復材料殼體膠均可採用此種結構形式。
  7. Power electronic capacitors - part 2 : requirements for disconnecting test on fuses, destruction test, self - healing test and endurance test

    電力電子電容.第2部分:熔斷絲非破壞和耐力的要求
  8. In this paper, for the bonding between the sling screw - thread - based and composite hull based on the underwater weapon composite, the bonding structure design, process design and leakproof technology between the load - bearing metal parts and composite hull are studied. with the further investigation on tensile test of the sling screw - thread - based the common technology of bonding between load - bearing metal parts and composite hull is obtained, which establishes the experiment and theory base for the technology of underwater and deepwater weapon in china

    本文以水下兵為背景,以某型號雷體吊耳螺紋座與復材料殼體的膠為研究對象,著重進行了金屬承力件與復材料殼體的膠結構設計、工藝設計、膠防滲技術的研究,並進行吊耳螺紋座拉力研究,最終獲取了水下兵用金屬承力件與復材料殼體連形式的共性技術。
  9. The jerk of clutch is studied, and a rule that clutch can be optimizing controlled at every gear is given according to the test result. the rule means much to control clutch

    對不同擋位離的沖擊度進行了研究,並根據結果提出了不同擋位離過程的優化控制準則,該準則對實現離的優化控制具有指導意義。
  10. 5. according to the requirement of amt start up experiment, using dynamic link library to program for different kinds of data acquisition card and transferring data between pc and multi scm. in this way data can be acquired successfully and engine throttle 、 clutch locking speed and eddycurrent dynamometer torque were controlled by pc programs

    根據要求,採用動態鏈庫的方法對不同數據採集卡進行混編程,順利地採集參數和控制發動機節氣門開度及離速度,利用上下位機多機通信,使上位機控制電渦流測功機,實現了模擬加載。
  11. On the base of studying imaging theory of lens, the imaging theory of laser confocal scanning microscopy was analyzed in detail in this paper, and the advancement of that the optical fiber was applied to the system was described ; on the base of completed the demonstration for whole project, the experiment scheme was designed ; the relationship between the main parameters of key devices and the resolution was deduced, and the requirements of coupling efficiency and vignetting effects to optical system was analyzed ; the design of optical system and the planar scanning controlling circuit was completed ; a new method was put forward to resolved the inherent non - liner scanning problem of the galvanometer scanner by using software liner controlling in circuit design, and the perfect planar scanning was realized ; at last the low noise, high multiple and non - distortion amplify circuit of photoelectric detector was completed

    本文在透鏡成像理論的基礎上,系統、深入地分析了共焦掃描顯微成像的機理,論述了應用單模光纖的激光共焦掃描顯微成像系統的優點;進行了總體方案的論證,並設計確定了單模光纖激光共焦掃描顯微成像系統的總體方案;從理論上推導分析了解析度要求與系統中相關件主要參數之間的關系,分析了系統耦效率和漸暈現象對光學系統的設計要求;完成了方案中光學系統和二維掃描控制電路的設計,並在電路設計中採用了用軟體解決檢流計式光學掃描(振鏡)非線性問題的新方法,能夠實現較為理想的二維模擬掃描;完成了高增益、低噪聲和低失真的探測收系統的設計和調
  12. Measuring engine transient process data in ca1258p1k2l11t1 truck in accelerated mode, recording and analyzing the data, then analysis the test error. 4. building model and simulating two typical running mode ? fixed 6th gear acceleration with initial vehicle speed 40km / h and gear change acceleration starting with 2nd gear, comparing calculated result with test result, revising transient process simulation model and analyzing error between calculation

    本文基於ca1258p1k2l11t1載重卡車對ca6df2 - 26發動機的瞬變工況進行和模擬計算,結果表明: 1 ) gt - power軟體可以很好的模擬、分析、預測發動機瞬變過程,模擬計算的結果與結果很近,證明,預測分析指出的改進方向是正確的; 2 )加裝電動增壓可以降低整車使用油耗,改善低速煙度排放,縮短加速時間,改善整車的加速響應; 3 ) gt - power軟體預測分析配發動機和整車是分析、解決發動機瞬變過程的有力工具。
  13. Scii is equipped with an up - to date comprehensive test lab, which can be used to check various parameters for our parts of relays, contractors, transformers and photo - controls

    Scii擁有現代化的綜室,可以完成對繼電、變壓、光控等產品的各項技術參數測,確保為客戶提供優質產品。
  14. Under operation system of dos and windows, control software is developed respectively. the wave of voltage and current as the ac contactors switch - on and switch - off is displayed dynamically, which make the equipment not only used as general electric life test instrument, but can apply test date for contactor study

    在控制軟體方面,分別完成dos平臺和windows平臺控制軟體設計,實現了交流觸點閉與斷開時刻電壓、電流波形動態顯示功能,使該裝置不僅能作為交流常規電壽命裝置,還對觸點的研究提供必要的數據。
  15. Elements of electrical and optical connection - test methods - voltage strength for insulated terminal lugs and in - line splices

    和光學連元件.方法.絕緣終端線片和連機拼頭的電壓強度
  16. Connectors for electronic equipment - tests and measurements - general - test 1c - electrical engagement length

    電子設備連.和測量.總則.1c .電長度
  17. Connectors for electronic equipment - tests and measurements - part 1 - 3 : general examination - test 1c : electrical engagement length

    電子設備連.和測量.第1 - 3部分:一般性.1c :電長度
  18. After the installation of the transformer, the sealing points will be guaranteed without leakage and the correct readings of every instruments until the handover is up to the grade

    6變壓安裝完畢后,保證各密封點焊縫無滲漏,各表計準確無誤,各項交格。
  19. Initial recovery voltage and peak recovery voltage across the circuit - breaker have an essential affect on re - strike. for assessing performance of circuit - breaker, the higher inductance and lower inductance must be considered at the same time when testing according to theoretic analysis, the directly test circuit on switching the no - load overhead by high - voltage circuit breakers of rated voltage 252kv and below, in compliance with the correlative standard jb5871 and the test devices, and the test circuit parameters have been calculated and the many testes have been carried out

    在理論分析的基礎上,考慮實室現有設備的情況依據標準jb5871的規定,選用適的設備,對線路的參數進行計算,在實室建立了252kv及以下電壓等級斷路線路充電電流直線路,利用該線路進行了數臺產品的,分析了結果,並根據結果和理論基礎討論了gb t1984 - 200 《交流高壓斷路》 (報批稿)關于開線路充電電流的有關規定。
  20. At the same time, it detailed demonstrate and carry out the way, which apply housing electric spindles at generation state to carry out housing toque loading in the joint testing and indirectly estimation housing torque loading by the electromagnetism torque of inner tube electric spindles. thus, the technical problem that the high speed shafting torque loading device and torque sender are difficult to ins tall is solved. and it saves a set of expensive high speed shafting torque loading and measuring device

    同時,詳細論證並實施了採用外套電主軸工作在發電狀態實現的外套扭矩加載和通過內套電主軸的電磁轉矩來間估算外套加載扭矩的方法,從而解決了高速軸系扭矩加載裝置和扭矩傳感不宜安裝的技術難題,並且節省了一套昂貴的高速軸系扭矩加載和檢測裝置,該成果填補了國內高速單向軸承臺扭矩加載領域的空白,達到了國內領先水平。
分享友人