接地干線 的英文怎麼說

中文拼音 [jiēdegānxiàn]
接地干線 英文
ground bus
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 干Ⅰ名詞1 (事物的主體或 重要部分) trunk; main part 2 (幹部的簡稱) short for cadre Ⅱ動詞1 (做...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 接地 : [電學] landing; body; ground connection; electrical grounding; grounding; earthing; earth; ground...
  1. Major projects under planning include the traffic improvements to tuen mun road town centre section, reconstruction and improvement to tuen mun road, widening of the tolo highway fanling highway between island house interchange and fanling, the central - wanchai bypass and the island eastern corridor link, improvement to island eastern corridor between causeway bay and north point, central kowloon route, widening of gascoigne road flyover, route 4 between kennedy town and aberdeen and retrofitting of noise barriers on 8 existing road sections. hk - zhuhai - macao bridge hk project management office

    而籌劃中的項目有屯門公路市中心段交通改善工程屯門公路重建及改善工程舊政務司官邸附近道路交匯處與粉嶺之間的吐露港公路粉嶺公路擴闊工程中環及灣仔繞道和東區走廊連路銅鑼灣至北角的東區走廊改善工程中九加士居道行車天橋擴闊工程四號堅尼城至香港仔及加建隔音屏障工程於八條現有道路。
  2. This bus wire connect the long - distance equipments in system and control equipment of other manufacturer. especially, the adoption of control word used in communication and control reduced the quantity of control cable, also. the good treatments of grand and protection has a every strong capability of anti - jamming

    該總通過相應的通訊模塊,與系統內的遠程控制設備以及其他廠商的單機控制設備相連,採用控制字的方式進行通訊和控制,可節約大量控制電纜,並且通過良好的處理和保護,具有極高的抗擾能力。
  3. The northern section dbl covered under this contract primarily comprises the construction of viaduct with some at grade sections and cut slopes at the northern end where the road passes through the northern extremity of the tsing shan range. it connects the hk - swc to the southern section near castle peak road

    合約項下的北段后海灣北段主要包括建造高架路,在北端設有面路段和削坡,道路會在該處橫過青山嶺北端的山邊,把深港西部通道與青山公路附近的南段連起來。
  4. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv電網故障的形式、消弧的應用范圍、兩種運行方式供電可靠性的高低、人身安全、通訊擾和運行維護工作量等諸多方面。 11 17本論文就是針對以電纜為主的城區10kv電網中性點方式的選擇問題進行研究。論文首先對10kv電網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變電站10kv電網的實際參數來建立數值計算模型,在考慮了電網電容電流變化、中性點電阻取值大小、電阻值變化等多種影響因素的情況下,對中性點經消弧和經小電阻方式下電網的過電壓水平和點短路電流大小進行了數值計算,其計算結果與電科院所作現場試驗進行了比較。
  5. The east round - city road runs across it like a huge dragon, winding over xincheng area, and the important traffic position, such as xi ` an railway station, shaanxi provincial bus stop, east city bus station have an important effect on our economic construction

    北連西安至銅川高速公路,可直達黃帝陵和革命聖延安;東西安到臨潼高速,直世界第八大奇跡秦始皇兵馬俑;東二環宛如一條巨龍從新城凌空穿過。
  6. Beijing - kowloon line is the second railway serving areas between the northern china and the hksar

    京九為連香港與中國北部方的第二條鐵路
  7. These include 4 new - build power plants, 5 local residential and commercial distribution networks in shenzhen, dongguan, guangzhou, foshan and hong kong, 3 lng ships, one oil - to - gas power plant conversion and guangdong dapeng lng company ltd ' s terminal and trunkline projects

    其中包括四家新建的燃氣電廠,深圳、東莞、廣州、佛山及香港的五家當城市燃氣和商業用氣輸配網,三艘液化天然氣船,一家油改氣電廠以及大鵬公司的lng收終端及輸氣項目。
  8. The west kowloon reclamation will provide housing for more than 100 000 people, commercial space and vital road and rail arteries linking kowloon with the new airport and north - west new territories

    西九龍填海區將為超過10萬名居民提供住所,並設有商業用。該填海區也為連九龍與新機場和新界西北部的重要道路及鐵路,提供土
  9. For the improvement of reliability and stability of the whole apparatus, meanwhile, for eliminating various electric - magnetic disturbance within the power supply and ground, measures such as filter, grounding, shielding are all taken in technique. the special methods are lc filter for power supply, bypass capacitor for suppressing voltage surge in printed circuit board, shielding layer wrapped in sensor head and overall grounded

    通過採用合理的濾波、、屏蔽等各種方法,尤其是採用電源lc濾波電路、電源上加旁路電容抑制路板上的電壓波動、傳感頭加屏蔽層、傳感頭總體結構等多種抗擾辦法,減小了電源和上的各種電磁擾,保證了系統的穩定性和可靠性。
  10. Located in the middle of north china plain, xinji is 65 kilometers east of hebei provincial capital shijiazhuang, 250 kilometers south of both beijing and tianjin. shide railway, 307national way and shihuang expressway run across the city and connect with jingshen, shitai highway and jingguang, jingjiu and jinhu railway. it is 70 kilometers from shijiazhuang airport, 3 hours distance from tianjin port and 1. 5 hours from huanghua port by car

    辛集市處華北平原腹,西距省會石家莊65公里,北距北京天津均為250公里,石德鐵路307國道石黃高速公路橫貫東西,連京深高速公路石太高速公路和京廣京九津滬三條鐵路,距石家莊機場70公里,由辛集到天津港口僅需3個小時,到黃驊港需1個半小時,交通極其便利。
  11. Other major new road projects under planning include the deep bay link ( which will connect the proposed shenzhen western corridor to the local highway network ), the central

    其他規劃中的新道路工程,主要包括連擬建的深圳西部通道與本港公路網的后海灣、中環灣仔繞道、七號香港仔至堅尼城段,以及竹篙灣連路。
  12. Access roads at the western end of ckr to link with yau ma tei interchange of the west kowloon highway

    在中九西端興建通道,連西九公路的油麻交匯處
  13. The deep bay link is a 5. 4 - kilometre approach road connecting the shenzhen western corridor with the yuen long highway at lam tei

    后海灣駁道路,全長5 . 4公里,連深港西部通道和藍的元朗公路。
  14. The tuen mun western bypass would connect to the dbl to the south of the boundary control facilities, probably at the junction of the dbl with the access roads to the hsksga

    屯門西繞道將連至邊界口岸設施南面的后海灣,並可能在後海灣交界處興建通路,直達洪水橋策略性增長區。
  15. Notwithstanding the recommendations of the stage 1 study, this study concludes that the four roads in the crosslinks project ( dbl, tmpe, tmsb and dbcr ) are feasible and could be built without causing unacceptable environmental impacts, the only exception being the dbcr where it will be difficult to provide on - site or off - site mitigation for the residual ecological impacts. consideration should be given to an alternative route such as the tuen mun western bypass

    1盡管研究的第一階段已就計劃提出建議,但本研究結果顯示,新跨界通道工程項目(后海灣、屯門港口快速公路、屯門南繞道和后海灣海岸公路)是可行的,並不會引致無法受的環境影響,唯后海灣海岸公路除外,該公路會帶來剩餘生態影響,若要在盤以內或以外採取緩解措施,將遇到困難,因此須考慮如屯門西繞道等其他路
  16. Expand hong kong s network of highways by building route 16 connecting sha tin and west kowloon and route 10 between north lantau and yuen long, and plan for the central kowloon route and route 7 between kennedy town and aberdeen

    擴展香港的公路網,興建連沙田和西九的十六號及連北大嶼山和元朗的一段十號,並籌建中九及連堅尼城和香港仔的一段七號
  17. Expand hong kong s network of highways by building route 16 connecting sha tin and west kowloon and route 10 between north lantau and yuen long, and plan for the central kowloon route and route 7 between kennedy town and aberdeen. our quality of life

    擴展香港的公路網,興建連沙田和西九龍的十六號及連北大嶼山和元朗的一段十號,並籌建中九龍及連堅尼城和香港仔的一段七號
  18. Besides, we use software smooth filtering to minish the influence of white noise and high - frequency noise, ground connection and shield technology to eliminate electromagnetic interference, and rational circuit distribution to attain high signal - to - noise of the whole fiber optic weak magnetic sensor system

    另外,採用軟體平滑濾波等處理以減小白噪聲和高頻噪聲的影響,利用及屏蔽技術消除外界的電磁擾,並對電路進行合理布局布,以獲得高信噪比的光纖微弱磁場傳感器系統。
  19. Recurring to rnathematic figure and examples and aiming at such questions as unbalanced current and induced voltage and high frequency interference, this paper has not only researched anti - jamming ability and measuring process of both three - electrode method and four - electrode method which are combined with reverse phase method, but also summarized actual measuring experiences

    通過數學推導和實例,圍繞消除網不平衡電流、電壓極電流極引問互感電壓、高頻擾等問題,分析了三極法、四極法結合倒相法測量電阻的抗擾能力和測量過程,並總結了實際測試經驗。
  20. And it analyzes the characteristic of common main stem road and its correlative theory and puts forward investment and financing mode adapting to jiangsu province. it quantitative and qualitative analyzes the existent problem of jiangsu province common main stem road investment and financing mode and brings forward corresponding resolvent. finally according to the situation of investment and financing of jiangsu province main stem road we scheme out several efficient and feasible investment and financing projects and some policy suggestions

    論文首先對國內外最新的投融資模式進行了一般的論述,著對普通公路作為公共基礎設施的特點和相關的理論進行了分析,研究並提出適合江蘇省的投融資模式,然後定量和定性分析了江蘇省普通公路投融資模式存在的問題,針對這些問題提出相應的解決方案,最後結合江蘇省普通的投融資實際情況,設計出幾種有效且可行的投融資方案,並提出了若對策建議。
分享友人