接地瞬間 的英文怎麼說

中文拼音 [jiēdeshùnjiān]
接地瞬間 英文
at impact
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞(眼珠一動; 一眨眼) wink; twinkling Ⅱ動詞(眨眼) wink
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 接地 : [電學] landing; body; ground connection; electrical grounding; grounding; earthing; earth; ground...
  • 瞬間 : moment; instant; minute; wink; in the twinkling of an eye瞬間點焊 shot weld(ing); 瞬間高壓試驗 ...
  1. You know, i was thinking i was gonna gut you bow to stern, soon as i laid eyes on you. but, alackaday, you look so pretty when you ' re scared, don ' t you

    我在想怎樣把你的內臟狠狠取出,就在我們眼神觸的,我想你哀嚎的樣子一定很誘人,對嗎
  2. Being a method of time - domain electrical magnetic surveying, the transient electromagnetic method ( tem ) can transmit first pulse electromagnetic field to underground making use of loop or electrical source and receive secondary induction field during of the pulse intermission

    變電磁法是一種時域電磁測量方法,是利用不回線或線源向下發送一次脈沖磁場,在一次脈沖磁場的歇期,採用不線圈收感應二次磁場。
  3. However, the accuracy and instantaneity of the most used mark post measurement method are not good and the errors of five - wheel measure device with contacting measurement principle are serious when it is used in soft and undulated surface field

    但是,常用的標桿法測量精度和態性較差,觸式測量的五輪儀法用於田松軟、不平的況誤差較大。
  4. If all errors belong to single or multiple temporary 0 1 - error or stuck - at - error produced by one module, then these errors can be corrected effectively. the results obtained from the simulation validate the correctness of the cl - acl structure. analytic results show that the delay of the cl - acl structure is dramatically less than that of a dmr structure using alternating - complementary logic mode

    這些粒子所引起的干擾不僅將改變存儲單元的邏輯值,而且將導致邏輯電路產生時輸出脈沖,如果這些脈沖在某個關鍵的時段里產生,比如在時鐘或數據的變化過程中,那麼它們將使其它電路的狀態產生變化。
  5. The greatest eclipse : the moment when the centre of the moon is the closest to the centre of the earth s shadow

    食甚:月圓面中心與球本影中心最近的
  6. Taking the bending stiffness, cable sag and cable inclination into consideration, the space vibration control of the cables using the visco - elastic dampers in cable - stayed bridges is investigated by joining the center difference method and the state space strategy. both the maximum modal damping ration and the optimal damper size are obtained, then the practical suggestions are proposed for the design of the dampers. the space nonlinear vibration equations of the cable - damper system are derived, and a new hybrid method for solving the cable - damper system is presented by combing the newmark method and pseudo - force technology

    綜合考慮了拉索抗彎剛度、垂度的影響,研究了粘彈性阻尼器對斜拉橋拉索的空振動控制,聯合中心差分方法及狀態空法,得出了拉索麵內、外振動各階模態可能達到的最大阻尼比及相應的最優阻尼器系數,並對斜拉橋拉索的阻尼器設計提出了參考建議:考慮拉索抗彎剛度、垂度及幾何非線性,導出了索-阻尼器系統的空振動非線性方程組,結合newmark方法及偽力( pseudo - force )方法,創新提出了求解非線性方程組的雜交方法,根據拉索-阻尼器系統的阻尼特性,在各種荷載作用下,對索-阻尼器系統的非線性態振動響應進行了研究,從系統響應的角度更加直驗證了阻尼器的控制效果。
  7. Tsing yi station lies at the heart of a mass development project near tsing yi north bridge which includes a futuristic shopping and entertainment mall - maritime square. the mall and the tsing yi station are designed to bring the northern and western new territories into the 21st century

    青衣站位於近青衣北橋的一個大型發展計劃的中心,車站上蓋為佔50萬平方尺的購物商場青衣城,這個嶄新的購物及娛樂中心,已成香港其中一個消閑熱點。
  8. ( 8 ) for the sake of overcoming the shortage of the former work, axisymetrical analytical solutions of vacuum combined surcharge preloading were deduced, the effect of surcharge loading speed was considered and vacuum was regard as instantaneous load, so we can take account of effect of surcharge loading time, well resistance and smear, it is more closed to practical engineering

    ( 8 )根據以前真空-堆載聯合預壓解析解的不足之處,推導了真空-堆載聯合預壓下基孔壓及固結度的解析解。本文的解析解將真空荷載視為時施加,而將堆載荷載的施加考慮為線性施加過程,因此可以考慮堆載施加的時影響,與實際工程情況更摘要加近,並可同時考慮井阻、塗抹的影響。
  9. In addition, the enormous use of cables in city power system increases the current through the grounded capacitor. these make the single - phase fault current get greater, which lead to more and more instantaneous grounding faults unable to eliminate naturally

    近年來,由於城市配電網路規模的不斷發展,以及城網中大量使用電纜,使得系統的電容電流大大增加,系統單相故障時電弧不能自動熄滅,越來越多的單相故障不能自動消除。
  10. In recent years, with the large - scale reconstruction of city power system, the scale of power system is continuously expanding, and the power supply network is becoming larger and larger. in addition, the enormous use of cables in city power system increases the current through the grounded capacitor. these lead to more and more instantaneously grounding faults unable to eliminate naturally

    近年來,國家對城市電網的大規模改造,使得電網的規模不斷發展,配電網路越來越大,加上城網中大量使用電纜,使電容電流大大增加,越來越多的單相故障不能自動消除,為了解決這一問題,我國普遍採用中性點經消弧線圈的補償方式。
  11. This paper has proposed one new way of thought of differentiating the fault type. after observing the physical course of the single - phase grounding of transmission line, analyzing by the wavelet transformation the transient signals sampled during the fault period from the moment that single - phased grounding occurs to the moment that line breakers work, we can distinguish temporary fault from permanent one through the wave form

    本文提出了一種不同於現有故障類型判別的思路,通過考察線路單相故障的物理過程,利用小波變換理論分析處理線路單相時性故障和永久性故障在故障發生后斷路器開斷前時段的暫態信號,通過波形識別區分兩種故障。
  12. Yesterday they had kissed in the first moment of joy at meeting, but to - day they felt that out of the question. he felt that every one, his mother and his sisters, were looking inquiringly at him, and wondering how he would behave with her

    昨天在會面的歡天喜的第一他們互相吻了,但是今天他們覺得這樣做是不行的,他覺得母親姐妹們,大家都帶著疑惑的目光注視著他,等待他用什麼方式對待她。
分享友人