控制工程 的英文怎麼說

中文拼音 [kòngzhìgōngchéng]
控制工程 英文
control engineering
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制工程模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過轉動力的變化過曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  2. Most damage of construction is due to the crack, so people always consider the beginning of crack as the sign of danger, it always makes people fear. with the development of economy in our country, the dimensions of construction is larger and larger, and the engineering is growing towards large - scale and complexity, because the refresh of material of concrete, the strength of concrete is improved, but a lot of crack appears in the engineering. in recent years, as the further development of economy in our country, the need of steel in the engineering is increscent, but the supply of steel in our country can not satisfy with the need, the price of steel is continuously rising, so it gives us a problem, we must save steel in designing construction and simultanentily controlling the crack of construction. so it gives us a new question on crack study

    由於建築物的破壞往往始於裂縫,所以人們一般把裂縫的出現視作危險的徵兆,裂縫使人們產生恐懼感。隨著國家經濟的發展,建設規模越來越大,結構朝著大型化、復雜化的方向進展,隨著混凝土原材料的不斷更新,混凝土強度等級的不斷提高,在實際上出現了大量的裂縫問題。近年來隨著國家經濟的進一步發展,用於建設的用鋼量日趨增大,而國家的鋼材供應量不能滿足日趨增大的市場需求量,導致鋼材的價格不斷上漲,這就要求我們在節約鋼材用量的基礎上來設計控制工程中的裂縫問題,這也就給裂縫研究提出新的課題。
  3. Beijing chuangshijingye noise & vibration control co., ltd is a specialized company which is engaged in noise and the vibration control engineering on industrial enterprise, civil construction, municipal administrtion traffic

    北京創世靜業噪聲振動技術有限公司(以下簡稱:創世靜業公司)是從事業企業、民用建築、市政交通等噪聲與振動控制工程的專業公司。
  4. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施藝與質量採用振動梁和振動棒相結合的小型機械法施,通過對關鍵序如:施測量、場區基層碾壓、二灰層施、鋼筋施、模板施、混凝土面層的施藝與質量,表明小型機械法施能滿足需要,完成後符合驗收標準,滿足了業主的使用要求,對于同類的施具有借鑒意義。
  5. Measured data show that the regulation works of hechangzhou braided channel intrance has attained predicated effect

    后的實測資料分析表明,和暢洲左汊口門控制工程達到了預期的整治效果。
  6. The dcs of i / a series is regarded as main reference object, and the control is separated from model. and the configuration of control is operatised at administration system, not to be added into model, not to build control sound code also. therefore it realizes on - line adjusting, real - time control and so on. users configurate by filling table. they only define i / o condition, fill certain operation variable, and name logic variable. the software offers a friendly user ' s interface, so personnel can compile and modify the control and logic program, change the value of logic and control variable conveniently, attach themselves to run, debug and control the system, not need to know the programs deeply. so the configuration software offer a flat that control engineers can attend to control loop, not to give their attention to the complicated program

    在本課題中,採用填表的方式進行組態,用戶只需定義i / o條件、填寫具體的運算變量名即可。本軟體為建模人員提供了一個友好的用戶界面,使建模人員在建模時不必對模塊內部的、邏輯序有很深的了解就可以方便的對其進行編寫和修改,實時改變各邏輯和變量在數據庫里的值,參與運行和調試,從而實現對系統的。因此,本組態軟體提供的這樣一個平臺,讓控制工程師能集中精力于迴路的構成,而不必拘泥於一些具體而煩瑣的序操作。
  7. In domestic project management, the progress management is ineffectively for a long time, especially the information - based system construction aspect in progress management. the ning dian power engineering was put into production on 27th, dec. it was advanced twelve month. the key was using the p3 software to control the engineering ’ process during the construct period

    標志著我國電力裝機容量突破5億千瓦的寧電,於2005年12月27日正式投產發電,期提前了12 . 5個月正式移交試生產,而應用p3有效控制工程進度是該重點提前並網投產的關鍵。
  8. Once he engaged in the research work for more than 30 years on anti - corrosive material in chinese academy of science metal protection and the corrosion research institute, and was ever the director of material laboratory, and is now holding the post of director researcher of national metal corrosion control engineering technology research center, and obtaining in state - level invention award for phosphate fertilizer equipment material research

    曾在中國科學院金屬防護與腐蝕研究所從事耐腐蝕材料的研究作三十多年,曾任材料研究室主任,現任國家金屬腐蝕控制工程技術研究中心主任研究員。在磷肥設備材料研究中獲得到國家級發明獎,在化設備耐腐蝕材料研究中, xd - 1耐腐蝕、耐高溫材料獲得到孫師伯獎, f518 、 f7 、 fs - 1硫酸用材料獲得中科院重大科研成果二等獎。
  9. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的造價,即在決策階段編寫詳細的可行性研究報告和編投資估算;在設計階段優化設計方案,進行合理的技術設計和施圖設計;在實施階段選擇合理的施方案,嚴格控制工程變更和現場簽證,嚴格審核圖預算,造價的預算採用量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施有關資料,定嚴密的合同條款。
  10. Stream and river control works may have a serious local influence on accelerating channel erosion.

    水流及河流控制工程對加速河道沖刷有嚴重影響。
  11. Carrying out cost limited design to control engineering cost

    推行限額設計控制工程造價
  12. Design - limited can efficiently control cost of building

    限額設計可以有效地控制工程造價。
  13. Luneng control engineering co., ltd

    山東魯能控制工程有限公司
  14. Integral transformation control engineering

    積分變換控制工程
  15. Function of construction supervision in controlling construction cost

    監理在控制工程造價中的作用
  16. Control theory and control engineering

    理論與控制工程
  17. Abstract : design - limited can efficiently control cost of building

    文摘:限額設計可以有效地控制工程造價。
  18. Computer aided control engineering

    計算機輔助控制工程
  19. The behaviors of the inflow and sediment, the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the hechangzhou brai - ded channel are analyzed and the scheme researches, engineering design, construction and the effects of the control works at the entrance of the left branch of the hechang sandbar are presented in the paper

    根據鎮揚河目前的情況分析了該河段來水來沙特點、近期河道演變規律及演變趨勢,介紹了該河段二期整治的基本情況,並著重介紹了和暢洲左汊口門控制工程方案研究、設計、施效果等內容。
  20. Projects on environmental control such as air and water pollution control works, noise mitigation measures, waste water treatment and disposal measures, and asbestos abatement works ( hk $ 137 million )

    環境污染之,例如:空氣及海水污染控制工程,噪音緩解,污水處理及排放和清除石棉等(合共港幣一億三千七百萬元)
分享友人