控制標高 的英文怎麼說

中文拼音 [kòngzhìbiāogāo]
控制標高 英文
control ling elevation
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  • 標高 : [測量學] elevation; level; altitude (飛行); datum mark; height mark
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監細則、組織機構及監的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工與監測工作的前期實驗工作和施工各工況、各節段支模、澆注混凝土后的的結構計算和其理論計算結果之後,詳細論述了主梁的線形方法和內容,實際支模的提出,結構應力監的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. That the antenna points at the aerocraft very precisely can utilize the gain of antenna, minishing the power of transmitter, and propagating data very gualitily effectly

    在無線測系統中,天線精確指向飛行目,可最佳利用天線增益,減小發射功率,質量的進行和數據傳輸。
  3. So it ' s necessary to set up a image processing system to handle the high - speed digital signals, it ' s used to acquire the beaconing light and compute it ' s undershot signal

    因此必須建立一個能夠處理速數字信號的圖像處理系統,來捕獲信光並計算出信光在面陣中的脫靶量,以滿足實時系統的需求。
  4. During construction of donghai bridge of yangshan deep - water port, bedrock bench mark, which is an important surveying datum mark, played an important part in control survey and elevation transmission

    摘要基巖是重要的測量基準設施,在洋山深水港東海大橋的工程建設中發揮了測量與程傳遞的重要作用。
  5. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐測量的方法,包括測量志點的選取、測量系統的建立及測量坐的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  6. The appropriate maximum stories and the appropriate maximum height of buildings are determined by using the various of control index, such as period, shear - compression ratio, allowable value of drift angle etc when earthquake fortification intensity is 8 degree

    用各項,如周期、剪壓比、軸壓比、層間位移角等進行對比分析,給出在8度區該結構的最大可建造層數和最大適用度。
  7. The discrepancy settlement control criterion relates to several aspects such as the placidity and comfort of driving at high speed, smooth drainage, and the crack which may occur during or after widening process

    差異沉降的準涉及眾多因素,包括拓寬過程中及拓寬以後速行車的平穩性、舒適性、排水的暢通以及新老路基間裂縫的開展等多種因素,其中速行車的平穩性為主要因素。
  8. With resonable calculating model and dynamic analysis method, the construction control elevation can be decided and so the precompression difficulty of support can be solved in the construction of large - span arched bridge

    採用精確的計算模型和動態分析技術,一次性給出施工控制標高,解決了大跨度拱橋有支架施工中支架需要預壓的問題。
  9. As to the frequency domain methods, the physical significations of the h performance targets, the selection strategy of the weighting functions, loop - shaping and standard problems of robust h control are discussed. frequency domain design methods of robust h control are also introduced to solve the congestion control problem of the high - speed communication networks, which based on flow rate control

    頻域方法方面研究了h性能指的意義、權函數的選取、迴路成形及h準問題;最後把h頻域設計方法應用於解決速通信網路基於流速的擁塞問題。
  10. On the analyzing of the technology trend, a plan of developing a multifunctional mark printer is brought forward the procedure of the development of a multifunctional mark printer is detailed in this thesis. a interface - card and a photoelectric board is designed, a control circuit is assembled by using them, through which a computer can control the mark printer ; a mark printer driver is developed by using com technology ; the mechanical part of the mark printer is designed by imitating milling machine ; a database software for components management is developed for high - speed train bearing industry. the managements include the registering for components, unique mark printing on components and analyzing of useful parameters. the user can complete the lifetime tracing for a component expediently

    設計介面卡和光電隔離放大電路,組成了電機和抬筆電路,通過它們pc機可以號印表機工作;採用組件化技術開發了號印表機軟體,驅動號印表機工作;參考刻模銑床原理,設計了機械部分;針對速客車軸承廠,開發了零件號管理軟體,使號列印和信息管理系統有機結合起來,達到在登記零件信息的同時,自動列印零件的號,方便了對零件的跟蹤管理。
  11. To avoid the probability, engineer calculate the cable tension and the pre - rising elevation with finite element theory, it cost much time in design the program and repeat calculation, the other hard work is to find out the place where the cables located in span arch structure, its must find out the optimized result manually which restrict the design work. recent years, lots of commercial fea software develop rapidly. engineers focus on the solution of commonness problems by the software existed

    為了解決這個問題,設計人員常常採用有限元方法計算扣索受力及拱肋控制標高,並根據計算結果設計扣索吊裝位置,在此過程中大量重復編程及計算工作佔用了很多工作時間,另外在扣索吊裝位置的選定過程中又沒有明確的方法,只能根據大量的計算結果人工尋找優化方案,這些都約著設計工作的開展。
  12. The high control criteria of water vapor quality in secondary circuit of 1000 mw pwr is introduced, and the criteria are compared with those in thermoelectric generating set

    介紹了壓水堆核電站1000mw機組二迴路水汽質量的準,並與火力發電機組的水汽質量準進行了對比。
  13. 2. technology - dedicate into the improvment of production eqipments, upgrade degree of production automatization. 3. quality control - to control the working procedure completely and improve production quality,

    3 .質量管-全面進行質量目管理及整個生產過程工序質量,提產品質量。
  14. In this paper, first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed, especially the relationships between gradation, strength and maximum dry density, long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn. by in - situ tests and researches on compacting mechanism of high - filled rock embankments, effecting factors on compaction, construction technology and shock compacting technology, obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction. by deeply research on the theory and methods of quality control of high - filled embankment, settled are the questions as quality detection method and control standard of high - filled rock embankment

    本文首先總結和分析了國內外公路和壩工行業已有的相關成果,深入探討了填石料的工程性質與最大幹密度、長期穩定性等之間的關系,得到了一些有益的結論;通過現場試驗路堤的試驗和對填石路堤壓實機理、填石路堤壓實效果影響因素、施工工藝和沖擊壓實技術等研究,解決填石路堤壓實工藝和最優碾壓參數等技術問題;通過深入研究填石路堤壓實質量原理和方法,解決填石路堤壓實質量檢測方法和準技術難題;解決填石路堤沉降觀測技術問題,並根據沉降觀測結果研究填石路堤地基和路堤沉降變化規律,得到了能預測沉降變化規律的「龔帕斯」成長曲線預測模型;根據工程實際,深入研究了邊坡穩定性的影響因素,得到了有益的結論。
  15. This dissertation has studied the structural model and model predictive control ( mpc ) algorithm that was first implemented for the structural vibration control of the tall building under earthquake excitation. based on analyzing structural motion equation and the state space form equation of the earthquake - excited structural model of the tall building, predictive model and control objective functions are defined and the mpc system of the tall building is set up

    本文主要研究層建築結構振動的結構模型和預測演算法,首次將預測應用到層建築結構地震反應中,在分析受地震波激勵的層建築結構模型的運動方程及其狀態空間形式方程的基礎上,確定預測模型和函數,建立層建築結構預測系統,從理論上對預測層建築結構振動中的應用進行研究。
  16. To control the settlement of roadbed, the degree of compaction regulated by current criterion is not enough, the mechanics parameter of filler compacted - - deformation parameter should be considered and dual control criterion should be put in practice. to get upper deformation parameter of xigeda stratum filler, the percentage of mudstone should be controlled. the thickness of filling layer regulated by current criterion can be increased if the compaction car has proper function

    通過此次研究,獲得了對路堤變形問題的新的認識,即為了路堤的沉降變形,不僅應滿足現行規范中規定的壓實度準,還應該引入填料壓實后的力學參數? ?變形模量值準,實行雙重準,而對于昔格達地層這種混合填料,為了獲得較大的模量值,應該填料中泥巖的含量;現行公路路基施工規范中對路堤填築時分層填築厚度的規定值,在壓實機具功能滿足的條件下,可以適當提
  17. The future land price was high or low, which laid on the rationality of urban land configuration, land function layout, basic establishment, and so on. and those factors were depended on the urban planning

    城市未來地價的低主要取決于城市土地配置的合理程度、用地功能布局、城市基礎設施的發展水平及城市建設總體容量準,這些主要是由城市規劃決策決定的。
  18. Enforcement of this licensing requirement and inspection of incoming goods is the responsibility of macau marine police and customs. as a practical matter, macau s ability to maintain international export control standards is very limited. an independent customs service has yet to be formed, and those officers now policing the airport, border, and harbor have little technical competence to identify sensitive goods

    澳門維持國際出口準的能力「非常有限」 ,而且目前沒有任何針對(軍民)兩用商品的管理機; 「澳門急於與國際社會一道合作以提對戰略貿易的,但是它在形成一個有效的戰略貿易系統之前還要做很多努力。 」
  19. The main contents of this paper are outlined as follows, ( 1 ) the physical significations and the correlativities of the often - used h performance targets are summarized, the selection strategies of the weighting functions are researched, and loop - shaping method as well as standard problems of robust h control are introduced. the frequency domain methods of robust h control are also introduced to solve the rate - based congestion control problem of the high - speed communication networks, and the h based controller are designed to deal with the time - delay problem of the single bottleneck node and multiple resources networks

    主要研究內容包括( 1 )總結了各種常見h性能指的物理意義及相互關系,探索了權函數的選取策略,介紹了迴路成形方法及h準問題;最後把h頻域設計方法應用於解決速通信網路基於流速的擁塞問題,設計基於h理論的流器用於解決多源單瓶頸網路中時變不確定多時滯問題。
  20. In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period

    摘要針對景洪水電站水文氣象條件、施工特點,以及上下游圍堰和右沖壩段碾壓混凝土溫度準,介紹景洪水電站縱向圍堰溫季節碾壓混凝土施工過程中採取的具體溫措施,以及業主在溫組織管理工作中採取的措施。
分享友人