推力桿角度 的英文怎麼說

中文拼音 [tuīgǎnjiǎo]
推力桿角度 英文
tla thrust lever angle
  • : 動詞1 (向外用力使物體移動) push; shove 2 (磨或碾) turn a mill or grindstone; grind 3 (剪或削...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 桿名詞(桿子) pole; staff
  • : 角Ⅰ名詞1 (牛、羊、 鹿等頭上長出的堅硬的東西) horn 2 (古時軍中吹的樂器) bugle; horn 3 (形狀像...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 推力 : visatergo; soot; propulsive force; thrust; momentum thrust
  • 角度 : 1. [數學] (角的大小) angle; the degree [size] of angle 2. (看事情的出發點) point of view; angle
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨與圍巖的相互作用機理進行研究,利用全長錨固錨的中性點理論,從等效均化的來考慮錨對圍巖的加固作用,並導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨支護結構的應場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應、變形的影響。
  2. Through the using of adams ( automatic dynamic analysis of mechanical systems ), kinematics simulations, which are based on the designed new type manipulate mechanism with concentrative link lever, are executed. interferences lying in the former model are measured accurately

    本論文使用機械繫統運動學/動學模擬分析軟體adams ( automaticdynamicanalysisofmechanicalsystems )對設計的新型土機集中連操縱機構進行了運動學模擬分析,精確測量了存在的聯動
  3. When analyzing skew support continuous curved box girder bridge, curved grid girder analyzing method considering warping effect is applied. matrix displacement method is applied in analyzing skew support continuous curved thin - walled box girder bridge with restrained bearing. in order to convert original rigidity equations to structural rigidi ty equations that can be solved, bearing nodal displacement matrix can be introduced, then unknown quantities at the edge of beams can be consistent with the restrained directions of skew bearings, unit rigidity matrix and unit nodal forces can be gained. structural rigidity matrix can be composed according to matrix displacement method, so nodal displacements and inner forces on the end of the rod that are unknown can be gained calculating equations of inner forces on any cross - section can be solved

    分析斜支承連續曲線箱梁橋時,採用考慮翹曲作用的曲線格子梁分析方法,應用矩陣位移法對具有約束支承形式的斜支承連續曲線薄壁箱梁橋進行分析,考慮到支座的約束條件並不與梁端彎曲位移和扭轉位移的方向一致,引入支座節點坐標矩陣,使得梁端的位移未知量與斜支座約束方向一致,來計算單元剛矩陣和單元節點,然後按照矩陣位移法組集總剛並建立結構剛方程,根據結構剛方程即可求解未知的節點位移及導出任意截面處的內計算公式。
  4. In chapter 3, the control object of this subject, which is a three - link gymnastic robot on horizontal bar with limited joint torque and joint angle is brought forward and its mathematic model is developed. after simulating of the movement of the gymnasts, the control task of this subject is designed as a series swing - up and balance movement, the key point of control is analyzed

    第三章,提出本課題研究的對象:關節矩和旋轉受限的三連單杠體操機器人,導了它的數學模型;提出要完成的控制任務:模仿體操運動員上杠動作而設計的擺起倒立動作,分析了這套動作的控制關鍵。
  5. Then a semi - rigid joint behavior can be modeled as a finite stiffness rotation spring. basing on rotation and displacement equation, we obtain the element stiffness matrixes with semi - rigid connections where the effects of material nonlinear, hysteresis behavior and shear forces in the connection deformations have been considered in and at the same time we modify the fixed - end forces. finally, a program for calculating the elastic - plastic earthquake seismic of semi - rigid connected steel frame structure by step and step integration of wilson -

    本文在介紹和分析半剛性連接彎矩與轉連接關系模型的基礎上,用帶有轉動剛的彈簧表徵半剛性連接,導出半剛性連接的剛矩陣,並對件固端進行修正,同時在考慮剪切變形、材料彈塑性、及構件的動滯回性能的基礎上,編制了結構彈塑性地震動時程分析有限元計算程序。
分享友人