提前工期 的英文怎麼說

中文拼音 [qiángōng]
提前工期 英文
lead duration
  • : 提動詞(垂手拿著) carry (in one's hand with the arm down)
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • 提前 : 1 (往前移) shift to an earlier date; move up (a date); bring forward; advance 2 (事先) in a...
  1. It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months

    樂灘電站從2001年10月底開始施準備到2004年12月20日首臺機組投產發電,僅用38個月的時間,比合理了7個月,並在此間,搶回因廠壩部份地基巖溶地質問題延誤的5個月
  2. In discrete production processes, we studied production scheduling problems of two identical parallel machines at single stage and multistage. the objective is to minimize production bottlenecks and the penalties of earliness / tardiness ( e / t )

    在最小加時間優化調度的基礎上,通過對生產條件的分析,得出了兩種替換形式下( e t )懲罰最小情況下調度的優化方法。
  3. In this thesis, the traditional windage analytical method that comparing the actual cost with the planning cost can not control the implementary course of project, an effective project management and control technique which is very popular in nowadays is used for reference - - earned value method basing on performance analyzing, the main aim is to use the earned value exponential to analyze the fluctuant complexion of the time limit and cost for a project, and all the influences made by the fluctuant complexion, and the developing trend of the time limit and cost for a project

    本文出了傳統的用實際發生成本與計劃成本進行比較,來衡量項目進展情況的偏差分析法不能全面地監控項目實施過程,借鑒了在目項目管理實踐當中被普遍採用的一種有效的項目管理和控制技術:基於績效分析的掙值法,其根本目的是要使用該掙值指數分析項目和項目成本各自出現的變動情況、這些變動所造成的相互影響、項目與項目成本的未來發展趨勢。
  4. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡程中成功應用。
  5. Article 20 where it is really necessary for an employer to reduce the size of its workforce when it comes to the brink of bankruptcy and undergoes a statutory consolidation or runs deep into difficulties in production and management, the employer shall explain the situation to the trade union or all of its staff and workers 30 days in advance, solicit opinions from them and report to the administrative department of labor before it may reduce the size of its workforce

    第二十條用人單位瀕臨破產進行法定整頓間或者生產經營狀況發生嚴重困難,確需裁減人員的,應當30日向會或者全體職說明情況,聽取會或者職的意見,經向勞動行政部門報告后,可以裁減人員,解除勞動合同。
  6. Article 27 during the period of statutory consolidation when the employing unit comes to the brink of bankruptcy or runs deep into difficulties in production and management, and if reduction of its personnel becomes really necessary, the unit may make such reduction after it has explained the situation to the trade union or all of its staff and workers 30 days in advance, solicited opinions from them and reported to the labour administrative department

    第二十七條用人單位瀕臨破產進行法定整頓間或者生產經營狀況發生嚴重困難,確需裁減人員的,應當三十日向會或者全體職說明情況,聽取會或者職的意見,經向勞動行政部門報告后,可以裁減人員。
  7. If you specify the duration only, you enable microsoft project to schedule the clock - hanging flexibly, moving the start date forward or back if the wall - painting occurs later or earlier than planned

    如果只指定, microsoftproject便能靈活地排定懸掛鐘表的日程,如果粉刷墻壁比原規劃有所或推遲,懸掛鐘表的開始日也就相應地或推遲。
  8. In addition, it puts forward a nested temporal db, which, with stronger expressive ability than others, is a breakthrough to entity - relationship model and is referred to as nter model. it also verifies the expressive ability of nter when it is applied to sidss. finally, in view of the features of sidss and the current status of salary distribution system, it conducts initial study of the sidss based on temporal - spatial relationship and the sidss with a temporally - driven knowledge database, with the aim for us to develop a consummate sidss system in the future

    本文中,介紹了時態數據庫的基本概念、發展、特點和分類;結合sidss的背景、特色及體系結構,詳細討論了sidss的時態性及其數學模型,指出將時態數據庫應用到sidss並作進一步的研究是必然趨勢,並在此基礎上研究了時態數據庫系統的模型;在探討了幾種模型之後,打破實體-關系類的模型的框框,出了一個表達能力較強的嵌套時態數據模型,稱之為nter模型( nestedtemporalentity - relationshipmodel ) ,並驗證將其應用到sidss系統中的表達能力;最後針對sidss的特點以及目資管理系統的狀況,進一步對基於時空關系的sidss系統、由時態驅動知識庫的sidss系統進行初步探討,以今後對開發更完善的引) ss系統作進一步的研究。
  9. The fallacy of composition is a kind of " macro - market failure ", so the stabilization policy should be chosen by the state. also, the paper analyzed the economic bodies " responses and the state ' s behaviors in the deflationary environment, and studied the price fluctuations in the money angle, and finally summarized the causes of the deflation in our country, pointing out that over - investment is the main factor. several suggestions about setting up some institutional and physical infrastructure facilities are brought forward in the end

    本文所做的作還包括對通貨緊縮環境中微觀經濟主體的反應以及政府(央行)的行為進行了分析,並從貨幣角度對物價變動和通貨緊縮的形成作了探討,最後對我國通貨緊縮形成的原因進行了總結,認為90年代初以來過度投資造成的生產能力相對過剩是引起我國通貨緊縮的主要原因,而抑制高通脹的「雙緊」政策、亞洲金融危機的沖擊以及國內一系列重大改革措施的負面影響等原因,則在一定程度上、加劇或延長了我國的通貨緊縮。
  10. In domestic project management, the progress management is ineffectively for a long time, especially the information - based system construction aspect in progress management. the ning dian power engineering was put into production on 27th, dec. it was advanced twelve month. the key was using the p3 software to control the engineering ’ process during the construct period

    標志著我國電力裝機容量突破5億千瓦的寧電程,於2005年12月27日正式投產發電,了12 . 5個月正式移交試生產,而應用p3有效控制程進度是該重點並網投產的關鍵。
  11. At the same time, this model supposes information on demand during lead time is imperfect and lead time can be controlled and reduced at an added cost

    同時,模型假設有關零售商內需求的信息是不完全的,並且可以由追加額外的趕成本進行控制。
  12. Following this principle, dpc adopted the method of " goal management ", i. e. disintegrating the three goals of investment, schedule and quality to different levels in accordance with different administrative levels to keep their consistency generally. moreover, dpc tried some effective new pattern such as in - phase management, strategic pass management and block management to shorten the time limit on the premise of ensuring the project quality. using some effective science way and modern management technology such as key line method to realize the reasonable resources allocation, including human resource, material resource and financial resource

    在這一理念的指導下,大連石化分公司運用了目標管理,將投資、進度、質量三大目標層層分解,並保證目標點的設置和時間段的劃分切實可行,方便合理;目標分解結構在較粗的層次上與組織分解結構一致,實現了組織結構設計與目標分解設計的配套;努力高作為建設單位為各參建方的服務意識,注重與參建各方的有效溝通和相關單位的全方位協調;採用同步管理、關口管理和分塊管理等多種有效的新模式,在保證程質量的下,趕,搶進度;用關鍵線路法、凈值法等有效的科學手段和現代管理技術來實現建設程中資源的合理配置。
  13. By comparing the results of the living example, it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced. it offers a new means to calculate project time limit about indefinite item planning - management

    通過實例計算結果比較,分析了以模糊網路關鍵路線演算法的不合理性,證實了本文出的新的定義下模糊關鍵路線法的合理性,為非確定性項目計劃管理出了新的計算方法。
  14. In view of passive situation of moral education in higher institutions caused by the " leftish " effect for a long period, professor li hong - yi definitely put forward a new concept - " moral education with engineering method " ( mewem ) the first time

    李鴻義教授針對高校德育長受「左」的思想影響而出現的被動應付局面,首次明確地出「程德育」新概念。程德育目已成為一種德育實踐範式,但理論上的研究幾乎還是空白。
  15. The objectives are to minimize a linear function of total completion time and total variation of completion time, a linear function of total waiting time and total variation of waiting time, a cost function based on earliness, tardiness, window size, window location, and a linear function of the due date, the earliness and tardiness for all jobs

    目標函數分別為極小化完時間和與完時間偏差和的線性組合,極小化等待時問和與等待時間偏差和的線性組合,極小化時間、延誤時間、最早交貨及窗口長度的加權和,極小化時間、延誤時間及公共的加權和。
  16. Redevelopment of shek pai wan estate phase 2 completed ahead of schedule with photo

    石排灣第二重建,舊居民可望及早調遷附圖
  17. This was the second major announcement in a week from the detroit - based automaker, which offered early retirement buy - outs last wednesday to hourly union workers in an attempt to cut 30, 000 union jobs and close 12 manufacturing plants by 2008

    這是來自這個基地位於敵特律的汽車製造商一周內的第2個重要公告,公司于上個禮拜3對聯盟員供早退休優惠以此試圖裁減30000名員,以及在08年關閉12個製造廠。
  18. The first phase of the project was completed two months ahead of schedule.

    第一兩個月完
  19. Material and fund can be saved and road longevity can be prolonged if this road structure is adopted

    如採用本路面結構可節省原材料,節約資金,提前工期和延長路面壽命。
  20. Maximize the profitability of each project whilst ensuring work completion within deadlines without compromising quality and safety

    使每個項目的收益最大化,同時確保在保證質量和安全性的下在限內完成作。