提前期偏置 的英文怎麼說

中文拼音 [qiánpiānzhì]
提前期偏置 英文
lead time offset
  • : 提動詞(垂手拿著) carry (in one's hand with the arm down)
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ形容詞1 (不正; 歪斜) inclined to one side; slanting; leaning 2 (只側重一面) partial; prejudi...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  1. Lead time offset days

    提前期偏置補償天數
  2. Lead time offset

    提前期偏置
  3. In this paper, a reasonable and feasible method of test measurement and analysis about the bond - slip properties of src eccentric loading columns was firstly presented. based on the former test of our research group, " the embedded electronic steel - concrete slip transfer " ( patent authorization no. zl - 02 - 2 - 61881. 3 ) was manufactured and exploited phasely, by which the interior slip between the steel shape and concrete along the embedment length could be directly measured, and the most difficult problem of experimental research was consequently solved. all these provided a basis for the further study on the bond - slip properties of src eccentric loading columns

    本文首先出了一套合理可行的型鋼混凝土壓柱粘結滑移性能的試驗測試和研究方案,並在本課題組試驗研究的基礎上,研製了內式鋼?混凝土電子滑移傳感器(專利授權號: zl - 02 - 2 - 61883 . 3 ) ,並進行了階段性地研究開發,從而解決了型鋼與混凝土連接面上滑移難以準確測量的關鍵問題,為進一步研究src壓柱的粘結滑移性能奠定了基礎。
  4. The article calculate the sale income, gross cost, income, cash flow, internal rate of return, net present value, payback period in etc. then i contrast analysis result of calculating with one of feasibility study and national standard, i have got a conclusion to analysis though ca7200e3 transformation - shell project from 2000 to 2005 management result can not achieve than assume, but this project management result is better than national standard. in conclusion the project is successful. 38 - 40 as proceeding the assessment, the article also gives many suggestion on the future of the project. i have a lot analysis from several aspect, they includes project background analysis, market analysis, project condition analysis, finance analysis, etc. these analysis prove that the project is feasibility

    論文比較分析ca7200e3變速器整體殼項目可研預與項目實際運行的符合度,找出項目實際運行與可研預測之間差產生的原因;論文首先對項目立項決策科學性、產品技術方案可靠性、原材料供應經濟性、組織機構和人力資源配合理性進行了綜合評價;然後對項目建設中費用、進度、質量、合同、信息管理工作存在問題進行了系統分析評價;接下來對項目運行狀況從產量、效益多方面進行分析,找出項目運行中存在的主要問題,並分析了問題產生的主要原因;最後在項目產品未來發展需求預測基礎上結合項目立項后評價、建設后評價、特別是運營狀況后評價所發現的問題,對如何高該項目管理水平給出了相關建議。
分享友人