提水 的英文怎麼說

中文拼音 [shuǐ]
提水 英文
bailing
  • : 提動詞(垂手拿著) carry (in one's hand with the arm down)
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. To wash yourself or your dishes, carry water 200 feet away from streams or lakes and use small amounts of biodegradable soap. scatter strained dishwater

    盥洗或洗碗時,提水到距河或湖兩百尺出,少量使用可自然分解的洗潔劑。洗碗濾渣後分散灑掉。
  2. This paper analysed working principles and controling features of water lifts about the head pressure transition. plc was used to operate controling system so as to work the system well

    摘要對頭差壓力轉換提水裝置的工作原理及控制特點進行了分析,使用可編程式控制制器( plc )控制系統運行,使系統很好的工作。
  3. The newly - built projects " construction supervision system should adopt independent social form and implement the supervision of omnibearing and full process ( mainstay project, field interplant project and the supervision manufacture of equipment ), which will be favorable to the optimal achievement of the project ' s general aim, cutting down the latent danger of quality and reducing the cost of operation and management

    高揚程梯級提水灌溉工程新建項目的建設監理制宜採用獨立第三方的社會監理形式,並推行從規劃設計到工程實施的全過程、全方位(主幹工程,田間配套工程,設備監造)的監理,以利於工程總體目標的最優實現,減少工程投運后的質量隱患,降低運行管理費用。
  4. Two aspects of the problem are discussed : one is that lift irrigation is no need when abstraction volume capability of canal head can meet the demand ; the other is that lift irrigation is in need when abstraction volume capability of canal head can not meet the demand

    它包括兩個方面:一是當渠首可引量能滿足灌區灌溉用量時,則不需要提水灌溉;二是當渠首可引量尚不能滿足灌區灌溉用量時,則需提水灌溉來補充灌溉用量。
  5. Ole missis, she tole me i got to go an git dis water an not stop foolin roun wid anybody

    老太太,她叫我去提水,不準在路上停下來和人家玩。
  6. White, mulatto, and negro boys and girls were always there waiting their turns, resting, trading playthings, quarrelling, fighting, skylarking

    有白人孩子,黑人孩子,還有混血孩子,男男女女都在那排隊等著提水。大家在那兒休息,交換各自玩的東西,吵吵鬧鬧,爭斗嬉戲。
  7. A challenging class using the stability balls, the workshop allows you to take your class or client to new higher level of pilates work, using core stability challenges as well as choreographic variations

    這趟具有挑戰性的課程,將使用健身球,讓你的課程或者客戶進入一個嶄新的、更高的普拉提水平,就像編排的變化一樣接受核心穩定的挑戰。
  8. Testing methods for small wind energy conversion system

    提水和發電用小型風力機.試驗方法
  9. The article summarizes the practical experience of large - medium sized irrigation projects supervision both home and abroad, and it attempts to explore possible paths for the benign development of high - lift stepped irrigation, project ( hlsip ) under the market economy

    本文在分析總結國內外大中型利工程建設監理實踐的基礎上,試圖從推行建設監理制的角度為高揚程梯級提水灌溉工程在市場經濟條件下的良性發展尋求一條新的思路。
  10. Meanwhile, by analyzing the characteristics of hlsip ( including the newly - built and innovated projects ), it tries to explore suitable supervision model for the project and it mainly studies the quality, cost and time control of the project in different stages

    同時,在分析高揚程梯級提水灌溉工程(包括新建項目和更新改造項目)建設特點的基礎上,論述了適宜於本項目建設和改造的監理模式,並著重研究了工程建設不同階段的質量、投資、進度控制理念及方法。
  11. The hlsip ' s newly - built projects carry out supervision system, which is favorable to improving investment environment, optimizing project design, improving the quality of projects and the project ' s adaptability to market. the innovated projects " supervision system is favorable to lowering the cost, changing the ageing of projects and bringing in advanced administration equipment and technology, enabling the projects get rid of the dilemma and step into the track of benign cicle

    高揚程梯級提水灌溉工程新建項目推行監理制有利於改善項目投資環境,優化工程設計,高工程質量,使工程建成後有較強的市場適應能力;更新改造項目監理制的推行有利於降低工程運行成本,改變工程原有缺陷,引進先進的管理設備和技術,使工程盡快走出困境,逐步走上良性運營之路。
  12. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉工程質量控制的重點包括:設計階段控制好方案對比、設計優化,特別是工建築、機電安裝、灌區規劃等多專業多目標的確定和協調,高設計質量和深度,注重控制設計成果的長期效益;施工階段協助業主選擇好施工承包商,制定出嚴謹、完備的施工合同,搞好設備監造,嚴格執行質量控製程序,使工程施工時時處于受控狀態;同時要高承包商的質量自控能力,堅持施工質量的全過程、多方法、多體系控制。
  13. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    高揚程梯級提水灌溉工程的投資控制,在設計階段應逐步推行限額設計的作法;施工階段以優化施工方案,審簽施工圖紙,嚴格計量支付為重點,防止投資失控,同時要謹慎對待工程變更,正確處理索賠事宜。
  14. She got up early, fetched water, cleaned the room and then went out for a walk

    她早早起床,提水,打掃房間然後出去散步。
  15. Discussion of the crack in the wall of ben jiaji second lifting water hinge construction

    賁家集提水二站樞紐工程墻體裂縫探討
  16. Control operation and flood handling scheme of wuluwati reservoir

    烏魯瓦提水庫調度運用和度汛方案
  17. Hours after russia ' s president vladimir putin championed a russian pensioner ' s complaint that she had to lug water home in buckets, the plumbers were on the way

    俄羅斯一位退休老人在電視實況轉播中,向總統普京投訴,說她每天不得不從外面提水回家。接到投訴,普京立即批示,幾小時后,上門維修的暖工就出發了。
  18. But this well was an inclined well. this is one point. this well was near to the top of holy spring mountain, considering relative altitude, its 150meters higher than koutou, but it has never dried

    此井有兩處怪異:正常井的井壁必須垂直,利於提水,而此井壁卻整體向南傾斜,這是一怪此井接近聖泉山山頂,按相對高度,幾乎等於憑高懸在口頭村上空150米處,而井常年流溢,從不幹枯,這是二怪。
  19. In this paper, a numerical simulation model to analyze the function and effect of the pumping irrigation in sediment deposition reduction of the irrigation canal system is proposed

    除了以往有效的措施外,本文在總結灌區渠道不同部位設置提水泵站設施作用與效果的同時,通過建立灌區渠道懸移質沖刷計算模型,對其減淤清淤的作用與效果進行了理論分析研究。
  20. 2. an optimal decision - making model for water resources scheduling of large - scale scheduling district is set up. it can provide a method to achieve maximum net revenue with a fixed service discharge from canal head and a fixed pumpage of pumping station

    建立了大型灌區資源優化調配決策模型,研究在灌區渠首供能力和泵站提水能力一定條件下,將灌區資源如何調配才使得灌區總凈收益達到最大值的優化決策問題。
分享友人