插入式變壓器 的英文怎麼說

中文拼音 [chāshìbiàn]
插入式變壓器 英文
plug in transformer
  • : 動詞1. (把細長或薄的東西放進、擠入、刺進或穿入; 插上; 插進) stick in; insert 2. (中間加進去; 加進中間去) interpose; insert
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : 壓構詞成分。
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • 插入 : insert; infix; run in; break in; patch; insertion; plug in; intercalate; intercalation; intromiss...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架模;拆裝和液兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著振搗為主、搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應雙控制確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. Transformer series zgs9 series pad - mounted transformer is a new electricity distribution equipment with hv loadbreaker, hv current - limiting fuse inside the transformer and it is insulated and cooled through mineral oil

    系列組合是一種新型配電設備俗稱美,是將高負荷開關,熔斷,高限流熔斷安裝在油箱內,以礦物油進行絕緣和冷卻。
  3. Direct plug - in transformer units

    直接插入式變壓器設備
  4. C interface - 12kv 15 - 140a inserted fusegear used for oil - immersed transformer overload protection

    C口- 12kv 15 - 140a油浸插入式變壓器過載保護用熔斷
分享友人