插入設施 的英文怎麼說

中文拼音 [chāshèshī]
插入設施 英文
break in facility
  • : 動詞1. (把細長或薄的東西放進、擠入、刺進或穿入; 插上; 插進) stick in; insert 2. (中間加進去; 加進中間去) interpose; insert
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 插入 : insert; infix; run in; break in; patch; insertion; plug in; intercalate; intercalation; intromiss...
  • 設施 : installation; facilities
  1. As one of the design for testability technology, boundary scan test ( bst ) fixes boundary scan cells between the device pins and core logics. thus, the bsc acts as the virtual test probe that carries out the test stimulus and captures the test response

    作為一種結構的可測性技術,邊界掃描測試( bst )技術將邊界掃描寄存器單元安在集成電路內部的每個引腳上,其作用相當于置了加激勵和觀測響應的內建虛擬探頭。
  2. Escalators available in the lobby, 2 large function rooms, 8 break out rooms, 1 executive boardroom, large pre function area, latest audio visual equipment, simultaneous translation facilities, non - smoking rooms, hair and beauty salon, bistro atrium : 24 hour all day dinining international restaurant, four season : chinese cantonese and sichuan restaurant, robata - tei : japanese barbeque restaurant, rumours bar : cocktail bar with entertainment, le cafe : lobby lounge delicatessen and bar, 24 hour in - room dinining, undercover parking, gift and souvenir shop

    酒店擁有394間客房,包括30間套房,完善,功能備,每間客房均有快速網際網路介面, 3部電話帶語音信箱,多用途電源座,可移動的寬大寫字臺及舒適的辦公座椅,可連接個人電腦的數據介面。行政樓層提供特別的住登記服務和小型會議室。商務中心有獨立的工作間,配備電腦, 24小時免費網際網路介面及電子郵件服務,並提供文秘服務。
  3. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架模;拆裝式和液壓式兩種模板的計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的工順序和斜向分段、腹板水平分層、附著式振搗為主、式搗固為輔的工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力工質量的工技術;採用重物移運器有效移梁的工方法;壓漿、封端、橋面防水層和保護層工的一些規定和注意事項等都是對箱梁製造行之有效的工技術和工方法,並可為以後類似工作借鑒。
  4. Several simulations for the designed phase shifter were performed in hp - ads. various factors were considered in influencing the insertion loss and the phase shift of the phase shifter. some effective measures were put forward to improve its performance

    採用高頻電磁模擬軟體hp - ads對計的移相器進行模擬,分別考察了移相器各組成部分對損耗和移相度的影響,並提出了改進移相器性能的措
分享友人