插板固定器 的英文怎麼說

中文拼音 [chābǎndìng]
插板固定器 英文
retainer of plugboard
  • : 動詞1. (把細長或薄的東西放進、擠入、刺進或穿入; 插上; 插進) stick in; insert 2. (中間加進去; 加進中間去) interpose; insert
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  1. Make the u type and w type heating tube to be series - wound and shunt - wound to meet the rated voltage reauest. the fixed housing is made adopting the stainless steel or high quality hot zincification board to resist high temperature and corrosive. matching the heat fuse and temperature controller to protect doubly the heating pipe of the air conditioner and keep safe. adopting the silicone rubber high temperature wire and imported connecting terminal to make the electric connection more fixed and reliable

    以達到額功率的要求支架選用不銹鋼或優質鍍鋅製作而成,耐溫防腐配用熱熔斷和溫度控制,對空調加熱管起著雙重熱保護作用,安全性能更好採用硅橡膠耐高溫線和進口接線端,使產品電氣聯接緊可靠。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹水平分層、附著式振搗為主、入式搗為輔的施工工藝,蒸汽養護的方法和規;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. The assembly can be done by means of pillar plugs on a printed circuit board or in the control cubicle on top hat rail as specified in din en 50 022, by the optional adaptor board with phoenix terminal screws

    放大可以通過支座安在電路上。如果安裝在控制機箱里,可以通過可選的適配和phoenix螺栓安裝在頂帽式導軌上符合din en 50022所規的。
分享友人