揚水 的英文怎麼說

中文拼音 [yángshuǐ]
揚水 英文
pump up water揚水泵 lift pump; 揚水站 pumping station
  • : Ⅰ動詞1 (高舉; 往上升) raise 2 (往上拋撒) throw up and scatter; winnow 3 (傳播出去) spread; ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. The aphorisms started following like water as all the old cliches got dusted off.

    一些陳詞濫調象塵土一樣起,一些格言警句象洪一樣到處泛濫。
  2. I looked up through the smoke of my cigarette and my eye lodged for a moment upon the burning coals, and that old fancy of the crimson flag flapping from the castle tower came into my mind, and i thought of the cavalcade of red knights riding up the side of the black rock

    我透過香煙的煙霧望過去,眼光在火紅的炭塊上停留了一下,過去關于在城堡塔樓上飄著一面鮮紅的旗幟的幻覺又浮現在我腦際,我想到無數紅色騎士潮般地騎馬躍上黑色巖壁的側坡。
  3. Treat brothers tinea, with external use normally medicine is given priority to, acid of usable water raise, tannic acid each 2 gram, deliquescent inside water, immerse brothers ministry, everyday 1 second, every time 15 minutes, 5 is one period of treatment 10 times

    治療手足癬,通常以外用藥為主,可用酸、鞣酸各2克,溶解在內,浸泡手足部,天天1次,每次15分鐘, 5 10次為一療程。
  4. This is portable pump with strong suction and medium head doss, equiped with extraordinary hair collector ; the body is made of themal plastic of strength ening fiberglass with good corrosive and impact resistance ; and with the advan tages of high flow, quiet

    這是一款輕便、自吸式、中等程的泵、配有特大的毛發收集器;泵體由玻纖增強的工程塑料注塑而成;有良好的抗沖性和耐腐蝕性;此泵具有高流量、運行安靜之優點。
  5. Yangzhou fukedu hotel is the first express style commercial and tourist hotel, witht the convenient transportation, is located at yangzhou yingbin avenueside jiangyang road and yangzi river road acrossing, eightfold main buildings are opposite new century hotel, the hotel has large - scale parking, medium and small - sized meeting room, multi - purpose hall. moreover, it possesses 88 guest rooms designed by glazing unit window, are equipped with the full facility of 24 - hour hot water, air conditioning, separate bathroom, cable television, ip telephone, broadband internet access, fire and burglar alarm installation. as long as you lodge in yangzhou fukedu hotel, let you feel concise, convenient, confortable, safe and economic

    福客都酒店是州市首家快捷型商務旅遊酒店,座落在州迎賓大道旁江陽路與子江路交叉口處,交通便利,八層主樓與新世紀大酒店遙遙相望,酒店擁有大型停車場中小型會議室多功能廳,客房88間,中空玻璃窗戶, 24小時熱,設施完善,環境優雅內設單人房標準房套房等,房內配有空調有線電視獨衛ip電話寬帶上網火災及防盜報警等設施一切讓您感到簡潔方便舒適安全經濟,是您及您的貴客下榻休息的理想場所。
  6. The chobe elephant are migratory , making seasonal movements of up to 200 kilometres from the chobe and linyanti rivers , where they concentrate in the dry season , to the pa in the southeast of the park , to which they di erse in the rai

    丘比象是遷徙動物,季節性地從乾燥季節他們聚集的地方丘比和林堤河行程200公里來到東南平地,而在這里它們卻由於雨而分散。
  7. The englishman, whose right eye was nearly closed, took his corner where he was liberally drenched with water and, when the bell went, came on gamey and brimful of pluck, confident of knocking out the fistic eblanite in jigtime

    那個英國人的右眼幾乎給揍瞎了。他回到自己那個角落,被澆以大量冷。鈴一響,他就又鬥志昂渾身是膽地上場了,充滿了立即擊倒那個埃布拉尼297拳手的信心。
  8. The green environment of blue sky and crystal water, beautiful scenery, warm and humid climate, fresh and clear air, profound historic culture, well - known yangzhou table delicacies, complete commercial and habitant facilities and careful health service have made gaoyou an ideal city for starting a undertaking, studying and living

    藍天碧綠色的環境底蘊深厚的歷史文化聞名遐邇的維美食配套全的商住設施細致周到的醫療服務,使高郵成為創業學習生活的理想城市。
  9. The newly - built projects " construction supervision system should adopt independent social form and implement the supervision of omnibearing and full process ( mainstay project, field interplant project and the supervision manufacture of equipment ), which will be favorable to the optimal achievement of the project ' s general aim, cutting down the latent danger of quality and reducing the cost of operation and management

    程梯級提灌溉工程新建項目的建設監理制宜採用獨立第三方的社會監理形式,並推行從規劃設計到工程實施的全過程、全方位(主幹工程,田間配套工程,設備監造)的監理,以利於工程總體目標的最優實現,減少工程投運后的質量隱患,降低運行管理費用。
  10. They were, says mr stephen, and the end was that the men of the island, seeing no help was toward as the ungrate women were all of one mind, made a wherry raft, loaded themselves and their bundles of chattels on shipboard, set all masts erect, manned the yards, sprang their luff, heaved to, spread three sheets in the wind, put her head between wind and water, weighed anchor, ported her helm, ran up the jolly roger, gave three times three, let the bullgine run, pushed off in their bumboat and put to sea to recover the main of america

    「此語不差」 ,斯蒂芬先生曰, 「其結果,本島男子發現負情女子異口同聲,無可救藥。遂建造舟筏,攜家財登船,桅桿盡皆豎起,舉行登舷禮,轉船首向風,頂風停泊,起三面帆,在風與之間挺起船首,起錨,轉舵向左,海盜旗迎風飄,三呼萬歲,每次三遍,開動艙底污泵,離開兜售雜物之小舟,駛至海面上,航往美洲大陸。 」
  11. Leonard was praised for rescuing the child from drowning.

    連納德因救起溺孩童而受到表
  12. Advances in study of hydraulic characteristic parameter conversion for low - lift pumping devices

    泵裝置力特性參數換算研究綜述
  13. Sanitary system : 5 " sus pipe, water supply depends on high - low levels, total 195 horse - power lift pumps. 10 " pvc waste water trunk pipe, total 150 horse - power waste water pump

    5 " sus管分高低層供揚水泵共195馬力10 " pvc排干管污泵共150馬力
  14. In accordance with the characteristics of multi - units and high - lift pump station and the application to the actual project, the main pumping house and the auxiliary pumping house are arranged in combination with the intake pond, and then the understructure is integrated with the main pump house ; with which the working space is fully used with convenient management and investment saving

    摘要結合工程應用,針對多機組、高程離心泵站的特點,將主副廠房及進池結合布置,下部結構與主廠房形成整體結構,既便於維護管理,又節省投資、充分利用空間。
  15. Delivery valve installations connected with dry rising fire mains ; filling armaturs pn 16

    消防龍帶連接供閥. "乾式」揚水管的供配件pn16
  16. Delivery valve installation connected with dry rising fire mains ; filling station and output station

    消防龍帶連接供閥. "乾式」揚水管的供裝置及排
  17. During processing the pumping station groundwork of the collapsibility loess in ningxia south mountainous area, we used the method of soil - exchanging to designing, constructing and collapsibility distortion observation on thickly layer, and found a conclusion that soil - exchanging on processing bad geological hydraulic engineering groundwork was a method of less investment, shorter project time and good effect

    摘要通過對寧夏南部山區嚴重濕陷性場地建設揚水泵站的地基處理,和對換土法在深厚層濕陷性地基中設計、施工、沉降變形觀測等的論述,得出利工程在處理地基不良地質問題中,換土法具有投資少、工期短、效果好的結果。
  18. At last, through analysis on calculating results and comparison among operational schemes, it is concluded that if pull - in steady operation of pump unit can be successfully realized, then it provides the reasonable suggestions for design and operation of pump station

    最後,通過對計算結果的分析及運行方案對比,判斷機組能否順利牽入同步和揚水,最終進入穩定工況運行,從而為泵站的設汁及運行提出科學合理的建議。
  19. Ustable speed pumped storage hydro

    可?速揚水
  20. Or, the project cannot play its due efficiency and even can be discarded in the midway. this will cause the great waste. the water intake of ningxia guhai pumping engineering and the water intake of yuejin channel on yellow river have been moved forward several times because of the silt

    位置選擇適宜,建築規模合理,則可以節省工程投資,達到預期效果;位置選擇不當,則有可能造成該工程不能發揮其應有的功效,甚至會中途廢棄,造成極大的浪費,此現象不乏實例,如寧夏的固海揚水口,躍進渠黃河取口因泥沙淤積就曾幾次前移。
分享友人