撐壓加工 的英文怎麼說

中文拼音 [chēngjiāgōng]
撐壓加工 英文
bulging
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • : 壓構詞成分。
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基程振動試驗及相關課題的研究作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支反力載系統,該載系統具有實用、簡便、穩定及安個等優點。
  2. The subject for different process technology and surface treatment of crank takes tracking checkout for its internal stress, analyses relation of jumping measurement, deformation measurement, recovery measurement and stress change, finds the reason and usual law of jumping overproof of crank. through cold pressure alignment, hot pressure alignment, support aged alignment and so on methods for 42crmo steel crank, the subject checks change of stress in the process of alignment and change of tissue and property after alignment for crank, and gives comprehensive evaluation for every alignment technology, then give safe and feasible technology parameter

    本課題主要是對不同藝及不同表面處理過程的曲軸,對其內應力進行跟蹤檢測,分析各藝過程中跳動量、變形量、恢復量與應力改變的關系,找出曲軸跳動量超差的原因和一般規律。通過對42crmo鋼曲軸進行「常溫力校直」 、 「熱力校直」 、 「支時效校直」等方法的校直,檢測校直過程中曲軸應力的變化及校直后組織和性能的改變,進而對各校直藝進行綜合評價,給出安全可行的藝參數。
  3. High - speed performance : in precision machining cam and cam rollers support the taper rib exerted pressure on the load, totally avoid 2806 - 1980, reliable and high - speed operation

    高速性能:在精密的凸輪和凸輪滾子的錐度支肋上施負荷,完全避免間隙產生,使運作可靠和高速。
  4. Under the horizontal earthquake action and wind force, aim at " the pure frame structure with rectangle columns ", " the pure frame structure with special - shaped columns ", " the frame - truss structure with special - shaped columns " and " frame - shear wall structure with special - shaped columns ", earthquake action analysis was done by the spacial finite element method through the changes structural parameter. analyzing systematically " structure vibration mode ", " vibration period ", " structure lateral rigidity ", " seismic action force ", " seismic response force ", " floor seismic shear force ", " lateral horizontal displacement of structure " and " members internal force ". results indicate : ( 1 ) based on equal area, the special - shaped columns replaced the rectangle columns, the structural lateral rigidity enlarges, the lateral displacement minishes obviously, the earthquake response increase slightly, the biggest increasing amount of frame columns axis - compress ratio is smaller than 0. 08. the whole aseismic performance of structure has improved ; ( 2 ) when the section ' s length and section ' s thickness ratio of special - shaped columns is smaller than 3. 6, the structure benefits to resist seismic action ; ( 3 ) the angle of horizontal seismic action with the whole coordinate is 0 degree, structure earthquake response is bigger, belonging to a control factor of structure aseismic design ; ( 4 ) the frame - truss structure with special - shaped columns and the " a " - brace has the biggest lateral rigidity ; ( 5 ) the frame - shear wall structure with special - shaped columns have bigger lateral rigidity and smaller displacement, members internal force enlarged just rightly, have much superiority of resisting seismic action ; ( 6 ) in the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), adopting special - shaped columns structure system, should reduce possibly the building ' s self - weight in order to reduce the earthquake response ; ( 7 ) the response spectrum method of computing seismic response and the time - history analysis method have similar analysis result

    西安理大學碩士學位論文在水平地震作用下,並考慮風荷載組合,分別對「矩形柱純框架結構」 、 「異型柱純框架結構」 、 「異型柱框一析架結構」及「異型柱框-剪結構」等四種結構體系,通過改變結構參數,運用空間有限元方法,進行地震作用計算。系統地分析研究「結構振型」 、 「振動周期」 、 「結構側向剛度」 、 「結構地震反應力」 、 「樓層地震剪力」 、 「結構側向位移」 、 「層間位移角」 ,以及「構件內力」 。結果表明:在等面積原則下,異型柱代換矩形柱后,結構剛度增大,側向位移明顯減小,地震反應力略有增,框架柱軸比最大增幅小於8 % ,結構整體抗震性能有所提高;當異型柱肢長肢厚比小於等於3 . 6時,結構有利於抗震;水平地震作用力與整體坐標夾角為0度時,結構地震作用效應較大,屬結構設計的控制因素之一;異型柱框一析架結構採用「人」字斜,側向剛度大於「八」字斜和「人一八」字混合斜;異型柱框一剪結構側向剛度大、位移小,構件內力增大適中,是一種抗震性能優越的結構體系:在抗震設防烈度較高地區( 8度)和抗震不利的建築場地( m類場地) ,採用異型柱結構體系時,應盡可能減輕結構自重,降低地震作用力;分別採用「振型分解反應譜」法和「時程分析」法進行地震作用計算,兩種方法所得結果基本一致。
  5. It was shown that the measured active soil pressures were smaller than the theoretical values and diminished with time, the measured pore water pressure decreased with the time and increased with the depth of soil, the combinative effects of cap girder and supporting structure were obvious which diminished the displacement of foundation pits, and the measured axial force of the anchor and interior steel beam were far less than the design force, indicating that the design safety factor of the foundation pit was too large to be economical

    基坑程實行信息化施並獲得了豐富的監測數據,通過對數據分析結果表明:實測主動土力小於計算主動土力,實測主動土力隨時間延長變小:土體中孔隙水力隨時間增長而減小,孔隙水力隨深度增而呈非線性增;基坑冠梁協同作用明顯,冠梁減小了基坑變形;錨索軸力比較穩定,鋼軸力變化相對較大,且二者軸力仍富餘較大,該設計比較安全。
  6. Taking an engineering case as an example, this paper describes the process and merit of the brb technology

    本文敘述並討論了防曲支用於結構抗震固的過程及特點,並列舉了一個程實例。
分享友人