擋土 的英文怎麼說

中文拼音 [dǎng]
擋土 英文
earth retaining
  • : 擋Ⅰ動詞1 (攔住; 抵擋) keep off; ward off; block; resist 2 (遮蔽) cover; block; get in the way...
  1. Application of bitumen paint to retaining wall at to yuen wai

    擋土墻上塗油瀝青
  2. Soil - retaining & supporting and earthworks

    二、擋土支撐及方工程。
  3. Effect of foundation trench strength to endogen force and failure model of cantilever retaining wall

    基槽強度對懸臂式擋土墻內力和破壞模式的影響
  4. Ming, h. y. and li, x. s. ( 2007 ). " numerical study of impact of soil anisotropy on seismic performance of retaining structure. " international journal of geomechanics, asce, 7 ( 5 ). in press

    明海燕,李相崧( 2007 ) . "砂各向異性對擋土墻抗震性能影響數值分析. "深圳大學學報理工版,第24卷,第3期,出版中
  5. Landslip preventive remedial works to slopes retaining walls

    斜坡擋土墻的防止山泥傾瀉修補工程
  6. The results of field observation showed that mucky clay in the shore slope of the wharfs was the stratum with the most obvious horizontal displacement and most of the pile heads close to the retaining walls inclined towards the land to different degrees, agreeing well with the inclination of pile heads as observed on site

    原型觀測結果表明:碼頭岸坡內的淤泥質粘層為水平位移最明顯層,靠近擋土墻的大部分樁頂都出現了不同程度的向陸側傾斜,這與實際見到的樁端傾斜狀況完全相符。
  7. This general form leads to the unification of coulomb ' s earth pressure theory and rankine ' s earth pressure theory, and makes the classical earth pressure theory to consummate, and enables the computation for retaining wall ' s engineering design to be more convenient

    一般形式的提出,使朗肯壓力理論和庫倫壓力走向統一,使經典壓力理論得以完善,使擋土墻工程設計時的計算更加便捷。
  8. Research of the dynamic characteristics of reinforced earth structure has become a resistless important task when the express highway and express railway are built and the reinforced earth retaining walls are widely applied

    然而,隨著公路、鐵路的提速及加筋擋土結構的應用領域的拓寬,對加筋上結構進行動力方在的研究已成為一個不可迴避的重要課題。
  9. As the balancing platform tends to make the barycenter move backward, a more balancing stress distribution under the wall, a higher and steadier wall can be achieved. furthermore, the resupine back of the downward wall not only works reasonably, but also can reduce the amount of excavation and filling obviously. so gravity retaining walls with balancing platform are applied heavily

    衡重式擋土墻因具有衡重臺使墻身重心后移、墻底應力趨于平衡,可提高擋土高度、增強墻體穩定性;且仰斜式下墻不僅受力合理、還可減少開挖與回填量等優點而被大量採用。
  10. Construction of retaining wall no. 36 near cheung sha

    鄰近於長沙豎設擋土墻編號36
  11. Prefabricated architectural walls and finishes screens, sound barriers and retaining walls

    加工前建築墻壁及批蕩隔板隔音屏障及擋土
  12. Prefabricated architectural walls and finishes screens, sound barriers and retaining walls public works category

    加工前建築墻壁及批蕩隔板隔音屏障及擋土
  13. Design and application of multiple arch trestle type retaining wall of whole section construction

    全拼裝連拱支架式擋土墻的設計與應用
  14. Wave motion analysis of earthquake action on the toe of retaining walls

    擋土墻墻趾地震作用的波動分析
  15. The earthquake damage of highway system shows that the failure of retaining structures is sometimes one of the main causes of road damage and bridge collapse

    公路工程的震害表明,擋土結構的地震破壞,往往是造成道路受損、橋梁破壞的主要原因之一。
  16. The main contents of testing the strength of subgrade abamurus using earthquake wave velocity are as follows : the influence of the lithology and strength of flag stones and the shape of block upon wave velocity, the influence of the strength of cement mortar upon earthquake wave velocity, the estimation standards of the strength and completion of abamurus. this paper puts forward an accurate no - destructive testing using the different reflect of elastic wave velocity for abamurus stones, the strength of mortar, the plumpness of mortar and the type of abamurus, on the basis of laboratory tests and field tests. it can be used to accurately distinguish the completion of abamurus

    地震波速法檢測路基墻強度,研究的主要內容有:片石巖性和強度及塊體形體對波速的影響;水泥砂漿強度對墻體波速的影響;墻整體強度和完整性的評估標準。應用彈性波速度對擋土墻石材、砂漿強度、砂漿飽滿度及墻類型的不同反映,在室內外模型試驗和現場生產試驗的基礎上,提出了一種正確的無損檢測法,可以正確判別漿砂片石墻墻身的完整性。
  17. Construction of retaining walls and noise barrier footings along yuen long highway

    興建中的擋土墻和隔音屏墻基
  18. Paving granite block facing of rw003 near lung tseng tau

    鋪設鄰近於井頭擋土墻編號003的花崗石磚砌石面
  19. The works mainly comprise the ground investigation field works at some 23 man - made slopes and retaining walls maintained by the highways department in the new territories and outlying islands, and associated laboratory testing

    工程主要包括為約23幅位於新界及離島而由路政署負責維修及保養的人造斜坡及擋土墻進行探工程及壤測試。
  20. Closure of hard shoulder for construction of retaining wall rws7 and rws8

    封閉路肩作建造擋土
分享友人