擋水工程 的英文怎麼說

中文拼音 [dǎngshuǐgōngchéng]
擋水工程 英文
retaining works
  • : 擋Ⅰ動詞1 (攔住; 抵擋) keep off; ward off; block; resist 2 (遮蔽) cover; block; get in the way...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 擋水 : manger plate
  1. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡墻、地表排、整坡填縫、生物防護等多種措施優化組合而成。治理后,在飽有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。
  2. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某在施墻及邊墩產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對建築物的危害度,提出了相應的控制措施,較好地保證閘正常運行的功能。
  3. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施導流建築物的等級、布置。通過力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝利樞紐採用圍堰汛后時段洪導流方案的合理性和經濟性,為施決策提供理論依據。
  4. The retaining wall reclining on the slight slope built on soft foundation is usually used in protecting the shore of river, the contradiction between the lack of impartiality in stress of the base and the small stress allowed by the foundation as well as the lack of stabilization of the breast wall is a hard nut to crack in the engineering. in the paper, a tenon - base is added under the base of the retaining wall, on the study of the choice of the parameters and formulas used in calculation and the research of theory used in calculation, method used to deal with the load, etc, the writer gives a way to crack the nut mentioned above paragraphs and presents a qualitative and quantitative analysis about them, such as the equivalent inner friction - angle ( d ) and the passive press of the clay ( ep ), etc. in the end of the paper, using modern optimization method, a design of the retaining wall reclining on the slight slope built on soft foundation is done, the result is economical, and accords with the fact

    軟基上的仰斜式土墻在河道護岸中經常遇到,仰斜式土墻基底偏心應力較大和軟基土地基容許承載力偏小的矛盾以及土墻抗滑穩定不足是中難以解決的難題。本文在對仰斜式土墻設計中有關計算參數的選擇、公式的選用應該注意的問題進行了研究,對河道護岸軟基礎上的仰斜式土墻採用凸榫基礎處理的方法,就其計算理論、設計驗算中各荷載的具體處理方法進行了較為細致的研究,提出了解決軟基礎上的仰斜式土墻難以解決的難題的方法,並對有情況下粘土等效內摩擦角_ d 、凸榫被動土壓力e _ p等在計算中的取值提出了定性和定量的分析。最後利用現代優化方法對軟基礎上的仰斜式土墻進行了結構優化設計,得出了符合實際的結果,與其它重力式土墻形式進行比較,取得了明顯的經濟效益。
  5. This article, takes some project for landslip in a small district in zunyi for example, tells you the useful experience of water proof, sueface prevention structure and sticking of the surfaces of mountain slopes, and so on

    摘要文章以遵義小區某滑坡治理為例,介紹了滑坡治理中有效解決坡面防、護面結構與坡面的粘結等問題的實踐經驗,提出了錨桿支護、掛網噴砼、坡腳墻襯護、噴面邊界澆築連系梁的綜合治理措施。
  6. During the construction phase, the construction noise predicted at the representative noise sensitive receivers will not exceed the noise standard due to natural geographic shielding and the remoteness from the construction site

    在施階段,由於自然地理的遮作用及這些敏感受體的位置遠離地盤,所以建築噪音預計將不會超過噪音平。
  7. Including the main body of the subgrade, protecting and supporting engineering. drainage equipment of road, culvert and the transition zone between the road and the bridge. through investigating the types of diseases, the author discusses the existing problems and causes of producing diseases, puts forward the protective measures in design and construction, and raises the treatment measures in highway maintenance, which makes it more scientific and perfect for highway construction and maintenance in the loess areas

    論文首先對黃土的特性及其影響因素進行了分析,然後對黃土地區路基病害及其防治技術進行了研究,具體包括路基主體、防護與支、公路排設施、涵洞及路橋過波段等部分,對病害類型進行了調查,分析了使用中存在的問題與病害產生的原因,提出了在設計與施中應採取的防範措施,給出了養護中的處治對策,使我國黃士地區公路建設與養護更加科學和完善。
  8. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪道閘墩與堰體底板厚度相當,堰體為低堰且設有廊道、堰體建基面「高低腳」及邊墩兼作土墻等具體特點,在閘室設計中采山口利樞紐溢洪道閘室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析閘室的受力狀態,分析閘室在荷載不對稱。
  9. Landslide hazard mitigation works including earthworks, installation of soil nail, concrete check dam and flexible boulder fence, drainage works and maintenance access road works

    山坡災害防護,包括土木事、裝設泥釘、土堤和柔性防石欄、排和維修通道
  10. As a new type of impervious wall material, the geomembrane is to be used in the central core earth and rockfill dams. in this thesis, the engineering characteristics of geomembrane are mainly investigated. the reliability of impermeability, the durability, the deformation adaptability and the proper application range of geomembrane are discussed

    本文重點研究了土膜作為一種新型防滲材料應用於土石壩防滲心墻的特性,探討其在土石壩運行期間防滲的可靠性、耐久性、變形能力及其適用范圍。
  11. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨拉抗滑樁、墻進行支結合的處理方法,同時結合截排等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  12. Yunfeng hydroelectric power station dam downstream face reinforcement project design construction

    雲峰電站壩下游面加固的設計與施
  13. According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion

    根據福堂電站設計的結構布置情況、地質參數及滲流計算成果,對閘室和壩穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。
  14. Abstract : the applied ranges and general characteristics and structural shapes and deformation - controlled technique etc. are researched on the composite soil - nailing wall with retaining water according to its engineering practice in shenzhen area, and the calculating method of its design is put forward

    文摘:依據深圳地區的實踐,對復合型土釘墻的適用范圍、一般特點及結構型式、變形控制技術等進行了研究,並提出了復合型土釘墻的設計計算方法。
  15. Construction of box culvert has been completed near cheung sha

    鄰近於長沙土墻編號36的方形去經已完成
  16. As a new retaining structure, composite soil nailed wall has been widely applied in the foundation pit now, research on the work performance of the soil nailed wall during the construction can not reveal on - site work, this occurs especially in xi ' an area with rich groundwater where groundwater is forbidden to be lowered

    復合土釘墻作為一種新型的土結構,目前在基坑中得到了較為廣泛的應用,然而對復合土釘墻在施中的作性能的理論研究卻遠遠落後于實踐。尤其在西安地區地下位較高且不能降的前提下,當採用復合土釘墻進行基坑支護時,對其作性能的研究幾乎為零。
  17. There are some kinds of techniques in controlling and reinforcing the soil slope, such as bolts, anti - sliding piles, anti - sliding retaining wall, water - treatment and changing the nature of soil

    錨桿、抗滑樁、土墻、的治理及改變土體性質是常用的土坡的支和加固處理類型。
  18. Reinforced soil retaining wall ( rsrw ) is a kind of composite structure composed with panel, reinforcement and fill. it was used widely as retaining structure in many types of civil engineering, such as highway engineering, water transport engineering, water conservancy project, railway engineering and so on, enormous economic benefits, social benefits and environmental benefits were obtained

    加筋土墻是由面板、填料、筋材等組成的復合結構,近年來已廣泛應用於公路、運、利、鐵路等各類土建的支結構中,取得了極為廣泛的經濟效益、社會效益和環境效益。
分享友人