支垂桿 的英文怎麼說

中文拼音 [zhīchuígǎn]
支垂桿 英文
antisag bar
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (東西的一頭向下) hang down; droop; let fall 2 [書面語] (敬辭 多用於長輩、上級對自己的行...
  • : 桿名詞(桿子) pole; staff
  1. Usage : manufacture tungsten wire, frame of grid, elicit wire, bracket, unsag tungsten wire, mould rods in high temperature, eradiate cathode, electrodes, bracket of heating

    用途:用於製造鎢絲柵極邊引出線架不下鎢絲,高溫定型發射陰極電極加熱子等。
  2. The mechanism consists of a steering gear box, pitman arm, drag kink, tie rods, steering arms, and steering knuckles, the latter supporting the front wheels

    該機構由轉向器,轉向臂,縱拉,轉向橫拉,梯形臂和轉向節構成,轉向節承著前輪。
  3. One of the vertical supports of a handrail on a staircase

    樓梯欄小柱樓梯扶手的撐之一
  4. A tall vertical spar, sometimes sectioned, that rises from the keel or deck of a sailing vessel to support the sails and running rigging

    船桅,桅一條高的(有時為分段的)直檣,從帆船的龍骨或甲板直立起來以持帆和操縱裝置
  5. Taking a qingdao hotel second phased project deep hole excavated for building foundation as example, the paper introduces the application of the demolition vibration in the complex peripheral environment and the geological condition, the influence, crag body vertical excavates regarding nearsightedness, the pre - stressed anchor rod and the earth nail unify support and protect the technology in the project of the crag body side slope

    摘要以青島某飯店二期工程深基坑為例,介紹了在復雜的周邊環境和地質條件以及有爆破振動的影響下,對于近似直開挖的巖體邊坡,預應力錨與土釘結合的護技術在邊坡護工程中的應用。
  6. Having fitted my mast and sail, and try d the boat, i found she would sail very well : then i made little lockers, or boxes, at either end of my boat, to put provisions, necessaries and ammunition, etc. into, to be kept dry, either from rain, or the sprye of the sea ; and a little long hollow place i cut in the in - side of the boat, where i could lay gun, making a flap to hang down over it to keep it dry

    安裝好了桅和帆之後,我決定坐船試航一番,結果發現小船走得相當不錯。於是,我在船的兩頭都做了小抽屜或者可以說是小盒子,裏面放糧食日用品和彈藥之類的東西,免得給雨水或浪花打濕。另外,我又在船舷內挖了一條長長的槽,用來放槍,還做了塊板可蓋住長槽,以防槍受潮。
  7. Cross - check the main roof truss roof installation quality of the surface is not perpendicular to the vertical center two blocks ; roof surface pressure chord of the roof truss vertical bending side, we must ensure that such errors do not exceed the allowable deviation to ensure roof stability and comply with the design requirements of the state by force

    屋架安裝質量主要檢查屋架跨中對兩座中心豎向面的不直度;屋架受壓弦對屋架豎向面的側面彎曲,必須保證上述偏差不超過允許偏差,以保證屋架符合設計受力狀態及整體穩定要求
  8. Valuable conclusion in engineering are drawn for practical design. the method of getting reasonable prestress degree for suspendoem which is restricted by intergral stability was discussed. optimizing programs are developed with the axis force and joint displacement of upper dome as object function respectively, the effective method of prestress degree for suspendoem which is

    探討了穩定約束的弦穹頂鋼索合理預應力度的優化方法,分別以網殼件內力、節點豎向位移和節點直向下位移為目標函數編制了優化程序,得到了整體穩定約束的弦穹頂結構確定鋼索預應力值的可行方法。
分享友人