支拱木 的英文怎麼說

中文拼音 [zhīgǒng]
支拱木 英文
crown lagging
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : Ⅰ名詞1 (樹木) tree 2 (木頭) timber; wood 3 (棺材) coffin 4 (姓氏) a surname Ⅱ形容詞1 (木...
  1. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂結構構件及結構模型,對中國古代結構中的典型構造如:柱腳在礎石頂面平擱簡、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築構件與構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  2. Steel - wood composite support scaffold was employed for construction of danhe river super major bridge, a stone arch bridge with a main span of 146 m

    晉焦高速公路丹河特大橋為主跨146m的石橋,該橋在施工中採用鋼、結合的架。
  3. A wooden frame built especially to support the sides of an arch until the keystone is positioned

    板條專門用來在頂石放置好以前的兩邊架子
  4. It is 19. 5 meters high and 15. 6 meters around at the base. built entirely of wood, the vault is supported by eight pillars. the roof has no beams but only a great number of brackets entwined within each other

    它高19 . 5米,底部直徑15 . 6米,全結構,殿頂由8根立柱撐,頂無橫梁,由眾多斗上疊,天花板層層收縮,構成美麗的穹窿式藻井。
分享友人