支撐面板結構 的英文怎麼說

中文拼音 [zhīchēngmiànbǎnjiēgòu]
支撐面板結構 英文
suspended deck structure
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • 支撐 : 1 (抵抗住壓力) prop up; sustain; support 2 (勉強維持) support; prop up3 [建築] strut; brace; ...
  • 面板 : [機械工程] face plate; panel; panel board; frontpanel; face ply [veneer]; surface veneer; skin pl...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. Design and construction of fully supported lead sheet roof and wall coverings - code of practice

    的鉛和墻塗敷層的設計與.實施規程
  2. This paper applies nonlinear finite element program bsnfem to analyze the behaviors of eccentrically braced steel frames under cyclic load. the study that comprehensive and systematic analyze the factor of links length, thickness of links flange, distance of links rib, thickness of links rib and angle of brace to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel frames have been some studied before. this paper fills the black in the filed factor of high - span ratio, brace stiffness and brace - to - beam connections to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel trames and any factor to be changed affect energy - dissipation capacity of y shape eccentrically braced steel frames

    對耗能梁段的長度、耗能梁段腹的厚度、耗能梁段翼緣的厚度、耗能梁段加勁肋的間距、耗能梁段加勁肋的厚度、的夾角等因素的改變對d形、 k形偏心鋼框架耗能的影響,前人已有一些研究,本文對這些因素的影響進行了全系統的分析,完善了理論分析的不足;而高跨比、剛度、與梁的連接形式等因素對d形、 k形偏心鋼框架破壞機理的研究以及各種因素對y形偏心鋼框架破壞機理的影響,則很少有人涉及,本文對此也進行了深入系統的分析,填補了這一研究空白。
  3. ( 4 ) according to the principle of " repair as the old ", the schemes of foundation strengthening, the schemes of the body structure, the schemes of the shear wall strengthening, the schemes of the floor strengthening, the schemes of the brace layout, the schemes of the switch floor construction and special strengthening scheme such as carbon fiber, the wall steel wire grid strengthening are achieved in this paper

    按照「修舊如舊」的原則實現了照舊色做舊,使新舊件的色澤差別諧調。依據上述原則,論文實現了基礎加固施工方案,主體加固施工方案、剪力墻加固施工方案、樓拆除和砼施工方案、布置方案、高層主體轉換層施工方案、木屋蓋拆除方案以及特殊加固工程施工技術如粘鋼加固、碳纖維布加固、墻鋼絲網加固等。
  4. The frontier production function, a parametric function of any form, can be estimated by sample data. this study shows that the projected panel data, which is the inputs and relative exponential maximum output data set, obtained by conducting the data envelopment analysis with the log inputs and output, is approximately piecewise cobb - douglas under a certain assumption

    根據前沿生產函數的定義,本文利用投入產出的對數形式和數據包絡分析方法求出了相對指數最大產出,並證明了在一定的條件之下,這種數據即所謂的數據具有分段近似cobb - douglas性。
  5. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全箱體、內、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰計算變形和施工實測變形,果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工問題具有現實意義。
  6. As regards the dynamic responses analyses, the free vibrations of a single deck supported by a single pillar or double pillars are studied

    在動態分析中方,針對最佳化分析后之單一層甲以單或以雙進行自然振動分析,另外也考慮了單之甲的動態反應。
  7. Modern designed steel cabinet built up with welded rectangular steel tubes. swing away control panel mounted on a tubular steel arm. heavy duty machined u - shaped frame for the roll assembly

    現代設計的櫃式是由角鋼焊接而成。搖臂式控制由管狀鋼架。輥組件置於堅固的u型鋼中。
  8. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截,且為高空作業,給模工程及預應力張拉帶來一定困難;系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人