支洞 的英文怎麼說

中文拼音 [zhīdòng]
支洞 英文
adit
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  1. Based on the modern design theory of tunnels construction that the adjoining rock be regarded as primary load - bearing structure, this thesis have made researches on the stability of tunnels mother rock and the safety of support pattern under the high external waterpressure and high geostress

    這就使本隧工程的建設面臨著極大的挑戰。本文是在將圍巖作為主要承載結構,護與圍巖共同作用的現代隧設計理論的基礎上,來研究高外水壓力及高地應力下隧圍巖穩定性及護結構安全的。
  2. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏工程引水隧灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和護結構安全的。
  3. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧的設計和施工中面臨的一些問題,選取隧的一個典型斷面進行滲流、滲控分析和開挖及護的有限元數值模擬,從而就深埋隧不同的開挖及護方式對地下水滲流場及圍巖穩定性的影響和所應採取的護措施等方面進行了探索、研究。
  4. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿護結構的應力場、位移場的變化規律進行了研究,分析了加錨護對隧圍巖應力、變形的影響。
  5. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高潮線反映現代黃河三角洲沖淤演變時,從1976年黃河改道清水溝流路入海到2000年,整個黃三角洲凈造陸201 . 5km ~ 2 ,淤積有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口河嘴大量蝕退,蝕退速率開始快速,后來逐漸變慢;清水溝河嘴大量淤積,淤積速率開始迅速,后來逐漸變慢,甚至出現凈蝕退;清水溝河嘴南側到脈溝一段岸線與刁口河嘴以西到灣灣溝一段岸線基本穩定。
  6. Ambulance workers, including a helicopter crew, were called to the scene after the man poured petrol down the hole and then lit a match in an attempt to kill the offending arachnid

    他將汽油澆到里,然後點了根火柴,試圖將這只不懷好意的蜘蛛燒死。之後,救護人員被召集到出事現場,其中包括一直升機救護隊。
  7. The following are such theories and methods as nonlinear theory considering interaction between support and rock mass, which, based on quantity analysis technology and actual data of initial crust stress, can simulate complex geological condition, carven shape and supporting so that provide important reference for analysis of stability of rock mass around underground carven and design of supporting

    隨之而來的是考慮護與圍巖共同作用的非線性理論和方法。這些理論和方法一般都以數值分析為手段,以實測地應力資料為基礎,能模擬復雜的地質條件、室形狀及護措施,從而為地下室圍巖穩定性評價和護設計提供重要的參考依據。
  8. It has become an irresistible tendency to recon ciliate the relations between exploitation of these caves and their protection, to simplify management and perseverance and to provide the scientific research of the caves with necessary aids. this article applied certain research the envrionmental management information system ( emis ) application in the management of the karst caves for tourism, and made a brief introduction of the exploitation and application processes. we have made corresponding research in the mechanism of based on the system, its pivotal technology, the warning system of the caves " environmental quality, the execution of the caves " environment data base and its code, all of which have produced certain fruits

    運用信息技術協調巖溶穴旅遊開發與保護之間的關系,簡化穴管理和保護工作,為巖溶穴科學研究提供必要的輔助已成為大勢所趨本文就環境管理信息系統envrionmentalmanagementinformationsystem ( emis )在旅遊巖溶穴管理上的應用方面做出了一定的研究,對開發和應用研究過程做了簡要的闡述,主要從系統建立的機理,系統的撐技術,穴環境質量預報警,穴環境數據庫實現及其編碼實現等方面做出了響應的研究並取得了一定的成果。
  9. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡水電站主變排風拱頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分」的概念和相應的網路基元模型,並回歸得到了溪洛渡水電站主變排風拱頂各個排風「虛擬分」風量均勻系數以及阻抗的計算公式。
  10. The current travel the main contents of culture stanzas to include the building mountain district exquisite article the resources to display, the literature performance wait the activity. the building mountain that rites part is solemn is cultured, and perform the part of and happiness and crazy, outstanding suburb color, mold the clear suburb topic of to emerge with the consciousness with the the new atmosphere to travel the area of big area, culture. the current travels the culture stanza with the happy suburb, sahuan building mountain " for the topic, travel the culture stanza the opening ceremony and saint mountain the scenery to spend a holiday the area to start practice the celebration ceremony the rites, building mountain the economic trade to talk over the meeting with the tenth building mountain, continuously the fire of the human civilization the motherland is good, the capital city is beautiful " three corpus activities of activities of publicity educations are with the stanza of white grass cookhouse ground sahuan son ", ten cross river the light stanza, celebrate the 7 1 " hall the whole image for ascending folk king of country whip performing, cloud residing the the series the activity, the spending the hole, silver the fox the hole, fairy the the hole, cloud the water hole " fourth holes look foring the competing and go to the countrying is a farmering, cut in lining " experience personallying a day swiming sixth items prop upping the activity to main contents, molding the root in peking the, hole the kingdom " ; release the north line of building mountain to travel the hallway, and adjust the mountain area the environment of economic construction, ecosystem, and promote the farmer to increase to accept, quickly the building mountain travel a developments step, and go on a tour for whole municipal and periphery visitor, recreational, the amusement invest with chinese and foreign businessman to start a business the offering is more, more ideal choice. attraction the more people travel the building the mountain, investment into the building mountain, and further push that area to completely develop

    儀式部分莊重典雅,表演部分歡樂狂野,突出郊野色彩,塑造鮮明的郊野主題和親和意識,展現房山旅遊大區文化名區的新氣象。本屆旅遊文化節以「 happy郊野撒歡房山」為主題,以第十屆房山旅遊文化節開幕式暨聖蓮山風景度假區開業慶典儀式房山經貿洽談會續燃人類文明之火「祖國好京城美」宣傳教育活動三項主體活動和白草畔野營地「撒歡兒節」十渡河燈節慶「七一」堂上鄉村民俗霸王鞭表演雲居寺祈福迎祥系列活動「石花銀狐仙棲雲水」四尋寶比賽及下鄉務農「插隊」體驗一日游六項撐活動為主要內容,塑造「北京根祖,溶王國」的整體形象推出房山北線旅遊走廊,調整山區經濟結構,優化生態環境,促進農民增收,加快房山旅遊黃金圈建設步伐,為全市及周邊遊客出遊休閑娛樂和中外客商投資創業提供更多更理想的選擇。吸引更多的人旅遊到房山投資進房山,進一步推動該區全面發展。
  11. According to in - situ construction real time observation and inverse analysis results, refinement numerical artificial analysis on a group of headrace tunnels was conducted and influence of different construction schemes and support parameters on rock mass deformation and failure behavior were researched to provide quantized data and technical aid for project construction decisions

    基於跟蹤施工的現場實時觀測和反演分析結果,對引水發電群進行了精細化數值模擬分析,研究了不同施工方案和護參數對巖體變形、破壞特性的影響,以便為工程的施工決策提供量化資料和技術持。
  12. Data mining which is a full - scale intellectualized solution, makes enterprises apperceive the thing hypostases deeply, provides support for decision - making, and affords the customer intelligence service of deep levels more effective market activities, wins the higher income for enterprise

    數據挖掘是一個全面的智能化解決方案,使企業深入察事務的本質,並為決策提供持,提供深層次的客戶智能服務、更有效的市場活動,為企業贏得更高收入。
  13. A few balances mounted above the tunnel support the model in an inverted position for "normal" running.

    有少數天平安裝在風上面,把模型在倒裝位置上進行「正常」的試驗。
  14. The appetite for joy which pervades all creation, that tremendous force which sways humanity to its purpose, as the tide sways the helpless weed, was not to be controlled by vague lucubrations over the social rubric

    一切生靈都有「尋求快樂的本性」 ,人類都要受到這種巨大的力量的配,就像上下起伏的潮水推動海草一樣,這種力量不是研究社會道德的空文章控制得了的。
  15. An offshoot of the yandang mountain

    羊角景區是雁蕩山斜逸旁出的一個脈。
  16. On the backfilling grouting technique to blook up the branch tunnel

    支洞封堵混凝土回填灌漿技術
  17. Analysis of pressured diversion system with irrigation discharge branch tunnel of stone river reservoir

    石頭河水庫灌溉支洞對發電引水系統的影響分析
  18. An underground cavity group has a large cross - section main cavity and many branch cavities with short intervals and various cross - sections

    摘要某地下室群,主室斷面很大,支洞較多,距離較近,且斷面變化復雜。
  19. All kinds of special pipes and conduits ( ditches ), ash storage sites, wells, pumping stations, water cooling towers, oil depots, dikes and dams, railways, roads, bridges, docks, fuel loading and unloading equipment, lightening arresters, fire - fighting equipment and other related ancillary equipment outside power plants and power transformation stations

    (三) 、水力發電廠使用的水庫、大壩、取水口、引水隧(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。
  20. Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations

    (三) 、水力發電廠使用的水庫、大壩、取水口、引水隧(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。
分享友人