支頂能力 的英文怎麼說

中文拼音 [zhīdǐngnéng]
支頂能力 英文
topside potential
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 能力 : ability; capacity; capability
  1. Make " doorsill line ", " seal top line " basically be to consider to plan as a whole of fund bear ability, make sure income and expenses is balanced

    制定「門檻線」 、 「封線」主要是考慮統籌基金的承受,保證收平衡。
  2. There are 500 ton and 315 ton oil pressure, and 176 sets of kinds of machine process and checking equipments in the factory. the mould we designed are economical applied and low making charge short period. we produce back - door level air - spring, jack, brake oil pipe, accelerator pedal for micro car and engine mid - parts, gemel, tri - way air pipe, adiabatic board and other welding parts

    工廠主要生產微型汽車系列背門撐桿制動油管千斤等總成,以及發動機倉中置構件側圍上內蒙皮等沖焊件,已形成年產30萬車付的,其中背門撐桿制動油管供應量佔了長安公司一半以上。
  3. It is something that makes you feel comfortable to watch, i was surprised to see how joe ma has totally subverted the usual play boy image of yu and turned him into an innocent and cute young man. nonetheless, one disappointment is that none of these sub - plots tend to work together as a whole. they function well in their respective moments, but when they are put together, they just don t seem to look very coherent or actually help the plot to advance smoothly

    個別場面都拍出一定的吸引,陳小春在蔡卓妍、周麗淇、余文樂甚至韓君婷等人之間周旋,演得尤其落,但整體來說幾段節始終製造不出連成一線的劇,不少場面如余周大鬧日本歌壇教父的家或陳小春夜闖韓君婷香閏等都來得零碎,多隻博得觀眾一燦吧了。
  4. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石面平擱簡、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦隨上部結構荷載變化的規律; (二)通過單柱承載試驗,測定了古建築中木柱的受變形特徵、破壞模式、及模型材料的變形模量、極限承載、極限變形等參量; (三)通過柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復特性及滯回曲線,斗?抗壓極限承載及受變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗減振參數等進行了定量分析。
  5. 2 ) from the angle of constructing course, steeve - arch supporting structure requires low - capacity cranes to erect, and simple constructing methods easy to meet. the time spending on construction is short. the usual arch supporting structure requires high - capacity cranes to erect, and complicate constructing methods hard to meet

    2 )從施工角度看,吊桿式拱架承結構對吊車的起吊要求低,工藝簡單,施工方便,工期短;豎桿式拱架承結構起重量大,對吊車的起吊要求高,施工難度大。
  6. The icv provides protected transport for an infantry squad and direct fire support during the dismounted assault. the icv carries a 9 - man squad and retains the capability to provide effective supporting fire to the squad while it is dismounted. the primary design of the iav has two variants : the infantry carrier vehicle and the mobile gun system

    美軍裝備的「斯崔克」 icv ,是新組建的中型旅主要作戰裝備,夠完整的輸送一個步兵班,駕駛員車長,及后艙的9名步兵,除可以提供行進中的保護外,還為下車作戰提供直接的火援,使用的置武器站可以根據任務而改變,可選擇的武器: m2hb 12 . 7mm機槍, mk - 19 40mm榴彈機槍。
  7. The top end bracket shall be fitted with a stainless steel lifting bail and shall be capable of supporting the combined weight of the pump and motor

    部尾軸承架應該配置不銹鋼吊環,應該撐泵和電機的總重量的壓
  8. The top end bracket shall be fitted with a lifting bail and shall be capable of supporting four ( 4 ) times the combined weight of the pump and motor

    部尾軸承架應該配置吊環,應該撐泵和電機的總重量四( 4 )倍的壓
  9. ( 4 ) the intelligent inspect system for roof latticed truss structure in shenzhen citizen center is selected as a practice background, and the intelligent inspect method to the steel bracket of roof truss is researched in present paper, in which includes several tasks as follows : automatic load identification for bracket based on neural network method, prompt calculation for the stress of key points on bracket, and its service status evaluation and stress alarm

    ( 4 )以深圳市市民中心屋網架結構的智監測系統為實際應用背景,詳細介紹了網架結構撐鋼牛腿的智化監測方法。其中包括,基於神經網路的牛腿瞬時荷載的自動識別、牛腿關鍵點應的快速正向計算、以及關鍵點工作狀態的評估與報警。
  10. The influence of some design parameters, such as density of net, rise - span ratio, height of strut, prestressing tension of cable, are analyzed, some economical and reasonable optimized parameters were gotten

    分析了網格密度、矢跨比、撐桿長度、鋼索預應值等設計參數對弦各項性指標的影響,得到了經濟合理的設計參數取值范圍。
  11. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於撐和圍繞磁共振成像醫療設備的混凝土中及海堤、工業棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性環境的混凝土結構等海洋工程、橋梁工程、路面工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土梁學性的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土梁正截面受彎性試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土梁正截面受彎性進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土梁正截面受彎性的理論計算體系。
  12. Through theoretical analyses in the article, the highly tough top - coal deflection before destroying is in inverse proportion to elastic mould, in direct proportion to tensile strength, and the conclusion that bigger deflection roof can ' t sufficiently transmit the compressible support to top - coal is drawn

    通過理論分析,獲得了高韌性煤層煤體在破壞前的撓度與彈性模量成反比,與抗拉強度成正比的關系,並得出撓度較大的板不很好把承壓傳遞給煤的結論。
  13. Software vertex processing provides a guaranteed set of vertex processing capabilities, including an unbounded number of lights and full support for programmable vertex shaders

    軟體點處理提供可保證的點處理集,包括無限制的光源數量和對可編程的點著色器的完全持。
  14. This paper study the supporting system structural behavior node form and construction process of glass roof for promoting the research and application of it

    本文重點對採光承結構體系、承結構的受、採光中節點形式及施工過程進行研究,以期推動玻璃採光的理論研究與工程應用。
  15. On the basis of simplified calculation model presented by doctor wangxiaoping, some finite element models are set up. by finite element model program sap93, an analysis of static models of 18m - span and 30m - span w666 acmr in different supporting conditions is made. also a study on the relation between definite support displacement, which reflect variational stiffness of substructure represented by steel column or reinforced concrete column, and load - carrying capacity mechanical performance is made too

    本文以w666金屬拱型波紋屋為研究對象,沿用王小平博士的簡化計算模型,對18m 、 30m跨波紋拱兩端不同座形式(鉸、固和彈性座)分別利用有限元計算程序sap93進行計算分析,研究波紋拱在不同跨度,不同座形式下,不同外荷載作用時對該結構受及穩定承載的影響,同時分析下部承鋼柱、鋼筋混凝土柱的剛度變化體現為允許座位移的大小與結構受及穩定承載之間的關系。
  16. Abstract : based on the systematic analysis of the shear behavior for r. c. beams, the tests of 11 simple supported beams under the top concentrated loads and the uniform loads are supplemented. the prime variable is shear span ratio, span depth ratio, horizontal web reinforcement ratio and vertical web reinforcement ratio. according to the test results, the working behavior, the prime shear failure modes, the effect of concrete and web reinforcement ( horizontal web reinforcement and vertical web reinforcement ) and other aspects of r. c. beams are analysed. the uniform calculation method for shear capacity of deep beams, short beams and shallow beams for practical is presented

    文摘:在對國內外鋼筋混凝土梁的受剪性進行較系統分析的基礎上,補充了11根鋼筋混凝土簡短梁在部集中荷載和均布荷載作用下的試驗,試驗梁的主要變化參數為剪跨比、跨高比、水平腹筋率和垂直腹筋率.根據試驗結果,對試驗梁的工作性、主要的剪切破壞形態、混凝土項的抗剪作用、抗剪腹筋(包括水平腹筋、垂直腹筋)的作用等進行了較為深入的分析,提出了可適用鋼筋混凝土深梁、短梁和淺梁相互協調的受剪承載的統一計算方法
  17. Tunnel vault and the surface of the side wall, play a firing prevention and heat insulation protecting roles, prevent the armored concrete reducing its intensity when the temperature rapidly heating up because of fire, avoid the tunnel from exploding and protect effectively the lining reinforcing steel bar not to lose supporting capacity so as to avoid the tunnel collapsing

    隧道防火塗料塗噴在隧道內的拱和側壁的表面,起防火隔熱保護作用,防止隧道內鋼筋混凝土在火災中迅速升溫而降低強度,避免混凝土炸裂、有效保護襯內鋼筋不會失去而避免隧道垮塌。
  18. The differences involve lack of support for pixel and vertex shaders because mobile devices do not currently provide this capability

    存在的差異在於缺少對像素和點著色器的持,因為移動設備目前不具備此
  19. To study the capability of space power information support is significant in reality and military for improving the top design, the programming and demonstration, and the operational application of the equipments ' system construction

    摘要研究空間量的信息,對于搞好航天裝備體系建設的層設計、規劃論證以及作戰運用,具有重要的現實意義和軍事效益。
  20. If, as seems likely, the chelsea defender does not recover in time, there is little doubt carragher is a less risky appointment than ledley king, but there is still something surreal about england ' s defence to face the most formidable attacker in the world ( not to mention david trezeguet, zinedine zidane et al ) including a centre - half who has played in that position on only a handful of occasions for his club

    如果特里無法及時傷愈,那麼更為全面的卡拉格將替他出場,不過讓這樣一英格蘭隊的防線面對亨利這樣一位可怕的射手(還不用提特雷澤蓋、齊達內等人)實在有些超現實主義。
分享友人