收集參考資料 的英文怎麼說

中文拼音 [shōushēnkǎoliào]
收集參考資料 英文
assembling aworking bibliography
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : gatherassemblecollect
  • : 參構詞成分。
  • : Ⅰ動詞1 (考試; 考問) examine; give [take] an examination test or quiz 2 (檢查) check; inspect3...
  • : Ⅰ名詞1 (錢財; 費用) money; wealth; expenses 2 (資質) intelligence; endowment 3 (資格) quali...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • 收集 : collect; gather
  • 資料 : 1. (生產或生活的必需品) means 2. (依據的材料) data; material
  1. I collected a few photos of the yosemite falls, as well as rocks and cloudy skies for reference, all to help find the best way to express the mood, the colors and shapes of the area

    了一些約塞米特秋季的照片,也有些巖石,雲彩和天空作為,這些東西都能在製作中傳遞良好狀態,色彩和形式感。
  2. Collect relevant background information ( with reference to local and international experience ) and compile an " invitation and response " document

    相關的背景本地和海外經驗) ,以及編制"誠邀回應"文件;
  3. In these thesis, on the basis of existing data collected of arch bridges and dynamics, simply introduce the development and application of the analytical method and finite element numerical analysis method of arch bridges. taking the example of pubugou cfst arch bridge, establish 3 - d finite element model of it with software ansys, and analyze its natural vibration. the effects on inherent vibration of the differences of structure parameters, the restriction of the deck and the effects of different arrangements of cross braces are analyzed

    本文在有關拱橋及動力學的基礎上,分析了拱橋動力學的解析分析法和有限元數值分析方法的優缺點,同時以瀑布溝大橋為背景,使用ansys軟體建立了空間有限元模型,實施了橋跨結構的自振特性分析;並分析了慮到模型簡化過程中部分結構數取值差異、橋面板的約束狀況不同等因數對自振特性結果的影響;此外還對橋面上的橫撐布置不同導致對自振特性的影響作了分析。
  4. It can anticipate and avoid, minimize or offset the adverse significant biophysical, social and other relevant effects of development proposals, and optimizes resource use and management opportunities. based on investigating numerous references in literature both at homes and abroad, collection statistical data and field survey, eia guidelines ( such as < technical guidelines for environment impact assessment of development area hj / t131 - 2003 > ), eia basic and operating principles, g1s software and urbanization proposals, the ecological impact assessment was analyzed in four aspects : 1 ) to investigate and collect data and information of current condition in programming area, and the introduction of the development project ; 2 ) ecological assessment : to practise ecological assessment for regional state, analyze the characteristic of ecosystem structure, ecological function, diversity, landscape pattern and ecological environmental sensitive area

    本文在國內外文獻調研、統計和實地調查的基礎上,以《中國環境影響評價導則?非污染生態影響》 、 《規劃區域的環境影響評價導則( hj t130 - 2003 ) 》和《開發區區域環境影響評價技術導則( hj t131 - 2003 ) 》等法規為主要依據,運用環境學、生物學、景觀生態學、生態系統生態學等知識,城市規劃和可持續發展觀的原理,藉助遙感( rs ) 、地理信息系統( gis )和全球定位系統( gps )等技術手段,結合蘆潮港新城的開發布局和規劃特點,進行生態影響的分析研究。
  5. In this dissertation, based on the field data of using prefabricated plastic drains improving soft clay foundation of filling - sea project in the shenzhen gulf, the qualitative and quantitative analysis of many factors of theoretic calculation way used in prefabricated plastic drains design were done, which could be a reference to choose the theoretic calculation way in other projects

    本課題根據所到的深圳灣填海工程中塑板排水法處理軟粘土地基的工程實測,對塑板排水法處理軟粘土地基的理論分析計算中通常要慮的各種要素進行了定性或定量分析,可作為同類工程中選擇理論計算方法的
  6. First of all, reference material is gathered using books, the internet, and hundreds of photos made on dedicated research trips

    首先,要從書籍、因特網和成堆的旅行研究照片中收集參考資料
  7. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,分析河床邊界條件變化,小浪底水庫運用后水沙變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策和依據。
  8. Based on lots of drawings, authors analyze lightweight and center of gravity of small wooden fishing vessel of hard dine at yellow sea and bohai sea, and put forward formulas for calculating lightweight and center of gravity, which can be used as reference for design of small wooden fishing vessel of hard dine

    摘要在大量圖紙的基礎上,對黃、渤海區小型折線型木質漁船的空船質量及重心位置進行了統計分析,並提出了空船質量及重心位置的估算公式,供設計折線型木質漁船時
  9. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )整理漫灣水電站大壩運行監測,並對其進行了系統分析,從觀測本身直觀的分析了大壩的運行狀況; 2 )總結位移反分析的理論及方法,建立了慮先驗信息多介質位移反分析模型,基於神經網路非線性映射功能,建立了神經網路時間序列預測模型; 3 )以ansys軟體為平臺,開發了漫灣水電站砼重力壩運行狀態評價模塊,結合荷載效應分析、數反演分析、數預測分析三個模塊組成漫灣水電站砼重力壩運行狀態分析系統;實現了對漫灣水電站運行狀態的動態「反演-預測」分析; 4 )利用漫灣水電站砼重力壩運行狀態分析系統,在漫灣大壩實測分析、大壩砼特性數反分析、大壩砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩運行狀態。
  10. The article rests on the examples, precedents and written law via internet ; consults many essays about electronic evidence from domestic and overseas ; draws on the experience of the evidence and information subject ; compares the law, regulations and theory of most of the world ; analyses two important questions : the admissibility and the weight of electroniq evidence ; discusses the way of gathering and operating electronic evidence

    文章基於國內外有關電子證據的案例、通過因特網下載的相關立法、司法解釋;了國內外有關電子證據方面的論著;借鑒了證據法學、信息工程學等學科的理論和方法;比較了世界主要國家在電子證據方面的立法、判例、司法解釋和學說;分析了電子證據可采性和證明力兩個基本問題;探討了電子證據的和運用規則。
  11. The library is well stocked with both printed and electronic information resources which provides an ideal place for learning and study

    圖書館大量的書籍及電子庫,提供理想的及自學環境。
  12. The section for investigation is the collection of correlative basic material and the development of the exploitation of world waterfronts ; the section for analysis mainly debates about the problems in the waterfront landscape pattern and the waterfront exploitation of wuhan city ; the last section for exploration advances some countermeasures and suggestions to meet the need of waterfronts renewal and urban ecological system construction of wuhan city

    調查部分主要是與研究對象有關的基礎和相關研究的進展;分析部分針對武漢市濱水景觀格局現市以及當前濱水區開發加以分析評判,並指出其中存在的問題;最後的探索部分針對前面的問題提出了相應的對策與建議,以便為下一階段武漢市城市生態系統建設與濱水區改造提供決策
  13. This paper collects a great deal of essential information of concrete - filled steel tube arch bridges having been built and to be built in the near future in china, analyzes and summarizes the numbers, span length, structural types, construction methods and materials of the type of the bridges with the aim of providing reference for the structural design and construction of more of the bridges

    摘要了大量的國內已建和待建的鋼管混凝土拱橋的基本,對其數量、跨徑、結構形式、施工方法、材等方面進行分析與總結,為此類橋梁的結構設計與施工提供
  14. This paper introduces, on the basis of collecting various data, the design and development of a needle - aspiration hill - drop drill consulting the similar foreign model

    本文在各種的基礎上,國外相同機型,設計並研製了針吸式打洞穴盤播種機。
  15. In this paper, many technical data have been referenced and a lot of existing ways have been analyzed, and found that some great web site always adopt load balancing technology, that is, a computer receives all http requests and dispatches them to each web server with load balancing algorithms

    本文針對此問題,了國內外大量相關技術,分析了以往的解決方案,發現國際上一些大型站點普遍採用負載平衡技術,即由一臺計算機中接所有到達的http請求然後根據負載平衡演算法把請求分配到群中的各個服務器進行處理。
  16. Information on recognised villages has been collected as input to the study to ensure the rights of indigenous villagers are duly respected. the traditional lifestyles of the villages and local festivals would strengthen the rural characteristic of sent and thus its overall attractiveness

    顧問公司已認可鄉村的,作為這項研究的,以確保原居民的權益得到適當的尊重。鄉村的傳統生活方式和區內節慶會加強新界東南的鄉郊特色,從而提高其整體吸引力。
分享友人