敷設管道 的英文怎麼說
中文拼音 [fūshèguǎndào]
敷設管道
英文
roughing-in- 敷 : Ⅰ動詞1. (搽上; 塗上) apply 2. (鋪開; 擺開) spread; lay out 3. (夠; 足) be sufficient for Ⅱ名詞(姓氏) a surname
- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 管 : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
-
Besides serving as carriageways for vehicles and pedestrians, roads also accommodate various utility services, such as water and gas mains, sewers and electricity and telephone cables
除了供車輛和行人使用外,本港的道路也敷設了各種公用設施,如水管、煤氣喉管、污水渠、電纜和電話線等。Pipe laying works
敷設管道工程They are laying new sewers along the road.
他們正在沿路敷設新的排水管道。The labor quota of long - distance pipeline construction
長輸管道敷設工程勞動定額Steam piping the design problem of the direct paving
蒸汽管道直埋敷設的設計問題Testing earth - moving machinery - method for the evaluation of lift capacity of pipelayers and wheel tractors or loaders equipped with side boom
運土機械試驗.第6部分:側面帶起重吊桿的管道敷設機和輪式拖拉機或裝載機的升降能力評定方法Adopted to core network, access network and fiber to the home. cable laying methods : duct, aerial and direct buried
可廣泛應用於核心網、接入網和光纖到戶,敷設方式有管道、架空、直埋等。West pipeline crossing heihe river is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench
摘要黑河是西部管道工程採用大開挖方式穿越的距離最長的河流,原油與成品油管道採用同溝敷設方式穿越該河流。The modes selection of directly buried installation for hot - water heat - supply pipeline, the design and construction of directly buried installation with and without expansion joint and the quality assurance of prefabricated directly buried insulating pipe are discussed with a practical engineering example
摘要結合工程實例,探討了熱水供熱管道直埋敷設方式的選擇,有補償和無補償直埋敷設方式的設計與施工及預制直埋保溫管質量的保證。The directly buried installation has become the commend method for the district heating piping networks in china, and the designers in the field are in need of the consult date for the exoteric of probability and systemic introduce the design method for the directly buried heating pipe. so this report is try to carry the point
直埋敷設已成為我國區域供熱管網推薦的一種敷設方式,該領域的設計人員迫切地需要一套理論聯系實際,較系統地介紹直埋熱力管道設計方法的參考資料,本論文的編寫力求達到這一目的。Take the gelmud - lhasa product oil pipeline as an example, the authors study and discuss some technical problems about pipeline construction in the permafrost region, including pipe laying methods to be selected, cathodic protection technology, weather and environment variation along pipeline route and environment control of pipeline route
以格拉輸油管道為例,探討了凍土地區管道工程可選擇的敷設方式、油氣管道的電保護技術、氣候和環境變化對管道的影響以及沿線環境管理等方面的問題。The main contents are as follows : firstly, the distinguishing feature of earth pressure in different lying way and the main calculation methods of the vertical earth pressure are analyzed and compared, the defect and applying limitation of earth calculation formula are pointed out. based on the elastic theory, formula to calculate vertical earth pressure on general trenching conduit is derived
其主要內容包括以下幾個方面: 1 、對不同敷設方式的地下埋管的受力特點進行了分析,在此基礎上,介紹了上埋式管道垂直土壓力的幾種主要計算公式,指出了各種公式的局限性及其適用范圍,並以彈性理論為基礎推導了一般溝埋式管道垂直土壓力的近似計算公式。The synthetic operation of engineering pipelines of a residential area is to collect designed and existing information of each kind of engineering pipelines in the layout space of the residential area, to analyze and investigate the information, to find out and solve the conflict in the constructing process of the engineering pipelines, to synthetically arrange the plane and vertical location of the engineering pipelines, to provide the foundation for the engineering pipelines " designing, construction and management the leading content of this dissertation is how to make use of the vertical space under roads in the residential area and rationally locate every underground engineering pipelines
小區工程管線綜合就是搜集包括現狀的小區規劃范圍內各項管線工程的規劃設計資料,加以分析研究、綜合安排,發現並解決工程管線在規劃設計中的矛盾,合理地安排各管線的平面位置和豎向高度,為各工程管線的設計、施工和管理提供依據。由於架空敷設方式很難保持環境的完整和美觀,有礙小區進一步發展,且存在諸多不安全隱患,正被逐步替代,因而,如何利用小區道路下的豎向空間,合理設置各專業埋地管線,成為本文研究的主要方向。The company has been undertaking projects such as power delivery and distribution system for alternating currents of 110 kv and below, smart architecture system, channel and optical cable laying project for communication system, computer network system, and cable television network,
公司一直從事110kv及以下送變電和配電系統工程、建築智能化系統工程及通訊系統的管道和光纜敷設工程、計算機網路系統工程、有線電視網路、機電安裝與城市道路照明等工程。Earth - moving machinery - safety - requirements for pipelayers
土方機械.安全性.管道敷設設備的要求In order to improve efficiency and save energy obviously, the text analyses the problems existing in the design of providing heat through pipes in cities, such as the disposal of pipes, burying and lay directly, heat expiation of pipes, hydraulic balance and so on
摘要通過分析城市集中供熱管網設計中存在的問題,對管網布置、直埋敷設,供熱管道熱補償以及水力平衡等進行了分類探討,以最大限度地提高效率節約能量。Guide for laying of asbestos - cement pipelines
石棉水泥管道敷設指南After a discussion of the heat transfer condition of the chilled water pipe which is installed in tunnel, the relation between the temperature of the chilled water and its transportation distance, the author holds that a central refrigeration system shall be adopted, and the loses of chilled water temperature in a long transportation distance could be overlooked on the condition that the pipe is heat insulated
摘要分析了冷凍水管沿地鐵區間隧道敷設時與周圍環境的換熱狀況;認為採用集中供冷的方式,在隔熱情況下可不?慮冷凍水因長距離輸送而引起的溫升損失。Code of practice for safe use of cranes - side boom pipelayers
起重機安全操作實施規程.起重機側臂管道敷設機Magnesium silicate temperature preservation dope is kind of ropypaste, it features with well spread, small shringking after dry, the temperacially used in the temperature reservation project fo abnormity equipment andunderground pipes
硅酸鹽(鎂)保溫材料為稠膏體,塗敷性好,乾燥收縮小,使用溫度范圍寬,防水效果好,適用性強,特別適合二異形設備和地下管道的保溫。分享友人