斜井段 的英文怎麼說

中文拼音 [xiéjǐngduàn]
斜井段 英文
lower curved section
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  1. Different drilling fluid systems have been used in the horizontal well drilling in north tarim area, more specifically, polymer drilling fluid is used in the top hole of large size, and polysulfide drilling fluid for the lower interval ; for the building section and horizontal interval, polysulfide drilling fluid mixed with oil is used

    塔北地區水平上部大眼採用聚合物鉆液體系、下部採用聚磺鉆液體系、造及水平採用聚磺混油鉆液體系。
  2. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂和未考慮砂作用下的固結沉降曲線及杭甬高速公路試驗在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間曲線率、角度在整個斷面的變化規律,以及沉降最大值與率、角度變化之間的線性回歸關系。
  3. A research over treatment of gushing water in geleshan tunnel

    7號涌水地注漿整治技術
  4. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入重慶市沙坪壩區團結村至口村之間,隧道穿越近南北向的觀音峽背,地貌上表現為脊、槽相間,觀音峽背由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉水和暗河出口,並修建有多個中小型水庫、大量池塘和水
  5. In order to research the influences produced by sidetracking position, the primary hole deviation and azimuth of used wells on the primary section of the re - entry horizontal wells, it is necessary to consider the 3d trajectory design of the re - entry horizontal wells

    為了考慮側?點位置及老的初始、方位對側?水平起始的影響,需要對側?水平進行三維軌跡設計考慮。
  6. Moreover, some special wells are also limited the use of well bore observations, such as horizontal wells, decline wells and high temperature wells

    另外,某些特殊(如水平、高溫等)也在較大程度上限制了許多筒觀測手的使用。
  7. The principal initial hole factors influencing primary section trajectory, such as sidetracking position ( formation factors ), primary deviating angle and primary azimuth of the sidetracking position are analysed by spatial plane - tilted method

    文章運用空間平面法分析了對側?水平起始有重要影響的主要初始眼條件,包括側?點(地層因素) 、側?點初始角、側?點初始方位角等對起始軌跡的影響。
  8. Sequence stratigraphy can contribute directly to the exploration of subtle traps. it is effective to increase the precision of stratigraphic correlation, therefor to enhance the reliability of subtle traps prediction, stratigraphic correlation approaches using in this paper based on principle of stratigraphic base - level cycles developed by t. a. cross, which are well tested in shallow marine and coastal plain strata. utilizing core, drilling, logging, seismic data and other information, the paper focus on recognizing the stratigraphic cycles formed by multi - order base - level cycles, establishing the stratigraphic correlation framework, researching on the distribution of reservoir and the prediction of the prospecting targets of the fourth section of shahejie formation in qi - shu area, liaohe basin

    本文以t . a . cross成因地層研究小組提出的以地層基準面旋迴原理為理論基礎進行成因地層分析和儲層預測的高解析度層序地層學為指導,利用鉆、地震、巖心等多種分析資料,對遼河盆地西坡中部齊?曙地區沙四地層進行了層序地層綜合研究,建立了研究區高解析度等時地層格架,在等時格架內對本區沙四進行了沉積體系特徵及其展布規律的研究,在綜合分析成藏要素的基礎上對沙四有利目標區進行了預測。
  9. There have been many questions about the petroleum pool formation conditions and models for this area since the first well was drilled in 1988, which has had an great influence on the further petroleum exploration and development. in this study, a method with the combination of petroleum geology, sequence stratigrapy, organic geochemistry and geophysics, based on drilled core analysis data, well data and seismic sections, has been applied to investigate the petroleum pool formation conditions and models in this area, and the following results and recognition have been obtained : ( 1 ). the lower tertiary strata are subdivided into two sequences and seven systems

    本研究以鉆取心分析資料、測數據、地震資料為基礎,綜合利用沉積學、層序地層學、石油地質學、地球物理學、有機地球化學等多門學科的有關理論和研究方法,通過對埕島東坡區油氣藏形成條件和模式研究,主要取得了以下幾個方面成果和認識: ( 1 )埕島東坡地區下第三系共劃分兩個層序、七個體系域,其中沙一至東三中下部沉積為層序,東三上部至東一為層序。
  10. Based on the discussion the peculiarity of computer identification of tectonic soft coal seam, implemented the computer automatically identification of tectonic soft coal seam with well log of coal seam using the method of stratifying with slope - variance and probability statistics

    摘要在對構造軟煤分層計算機識別的特殊性進行探討的基礎上,應用率方差分層、概率統計計算的方法,實現了煤層的測曲我對構造軟煤分層的計算機「自動」識別。
  11. Xinji no. 3 coal mine is a steep mine. it has reached pre - results by isolating the pillar with loosen blast technology in recovery area. the recovery rate is lifted and coal loss is reduced. it is an example for the same mine

    新集三礦屬急傾,在回收區隔離煤柱中應用松動爆破技術,達到了預期效果,提高了采區回採率,減少了煤炭損失,並為同類型礦提供了經驗。
  12. Kick - off, build up section

    斜井段
  13. Kick - off build up section

    斜井段
  14. Tower 2 at core end needs a closed ceiling zone to hide the ducts of return air going into shafts

    在芯筒尾部的2號樓需要有一封閉的吊頂區域以隱藏回風管道進入
分享友人