斜切層 的英文怎麼說

中文拼音 [xiéqiēcéng]
斜切層 英文
chamfered layer
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 切Ⅰ動詞1 (合; 符合) correspond to; be close to 2 (用在反切后頭 表示前兩個字是注音用的反切)見 ...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. The base of scion is cut diagonally to expose a large oval of cambium.

    接穗的基部被形,暴露出橢圓形的大圈形成
  2. It is shown that deep abnormal high pressure confined area ( abnormal prressure fluid compartment ) at footwall in southern margin of the basin and uplift sector closely related to faulting should be as a domain or direction for exploration , and structural traps ( like faulting barrier , anticline , etc. ) along with original oil / gas reservoirs at major faulting footwall as the main exploratary targets

    盆地南緣斷裂下盤深的異常高壓封閉區(流體封存箱) 、與斷裂密相關的隆起段是今後主要勘探方向與領域,斷裂遮擋、背等構造型圈閉? ?主斷裂下盤原生油氣藏是主要的勘探對象。
  3. All of the hydraulic structures are arranged in the right bank and four underground seepage tunnels are arranged parallel in horizon, and the axle wires intersect with syncline axis almost perpendicularity, and with rock formation obtusely. complex underground tunnels are formed under such formidable conditions, and each of seepage tunnels crosses nuclear of syncline and comes up against interlaminar sharing disturbed belt at different footage

    四條引水發電隧洞在平面上平行布置,軸線方向與本區構造線方向近於垂直,與巖走向大角度相交,構成一復雜地下洞室群,並在不同洞段通過沙金壩向核部,且遭遇多條間剪錯動帶。
  4. The second row of blocks should be cut beveled at the bottom so the layer begins to slant inward toward the middle

    第二的雪磚底部要割的有一個度,這樣壘起來就向中間收口了。
  5. Based on the three layer architecture technology, the platform system is developed by microsoft visual studio. net, and it realizes the operating module on database based on component technique of ado. net interface ; sql server 2000 is as the database management system, defines some key tables of database, designs an realizes the functions of appending, querying and renewing services, such as the organization, personnel, production, project and information issue of the scientific research management, respectively in the research part of ispssrm ’ s development, it first analyzes inadequacies and technological difficulties of the original edition of ispssrm, then discusses the problem of dealing with diagonal line, the combination of multi - table, the design of query on dynamic tables, and the web report forms, and the extension of the service function such as the applying and estimating in web, and finally proposes the concept to extend the function of ispssrm

    Net開發工具,基於三結構技術實現了web業務功能模版;基於ado . net介面的組件方式實現了數據庫訪問操作,在數據存儲使用sqlserver2000作為后臺數據庫管理系統,定義了數據庫關鍵表;設計實現了科研管理的機構、人員、成果、項目、信息發布、維護等業務的添加、查詢、更新功能。在ispssrm的發展研究部分,首先分析了ispssrm原型系統的不足之處及存在的技術難題,探討了動態表格的線處理、多表合併、查詢設計及web的列印問題以及網上申報、評審功能模塊等業務功能的拓展,提出了擴展ispssrm的功能的思路。 ispssrm現已經在蘇州大學科研處投入試運行,為高校的科研管理信息化建設、提高科研管理水平提供了一個實可行的方案。
  6. Only the main transmitted light from the glued layer or the first - order transmitted light also, is considered at most in the existing study outcome about light intensity transmission. on occasion, some experimental results about light transmission are given as a performance index. and nearly no one considers the contribution of the higher - order transmitted lights and the effects of the inaccuracy in glue technology on light distribution

    人們對它的研究,往往只考慮棱鏡膠合的兩面上的主透射光束,至多同時考慮次級透射光束對出射光強的影響,或直接將光束光強透射比的實驗值的平均結果作為棱鏡的一個性能指標給出,很少考慮棱鏡膠合間光束的多次反射對輸出光強的影響以及結構誤差和使用調整誤差對棱鏡光強分佈的影響。
  7. Based on the sound wave transferring theory of infinite elastic and viscoelastic materials with the method of transferring matrix, the formulas of transmission coefficient and the level of sound insulation are gained, which consider shearing strength in the rubber, and the sound insulation properties of compound structures are discussed in condition of oblique incidence

    摘要基於無限大彈性體和粘彈性體的波傳遞理論,採用傳遞矩陣的方法,對入射情況下的透射系數和隔聲量進行了理論推導,考慮了聲波在橡膠中傳播所產生的剪力,並就單復合結構的隔聲性能進行了詳細的研究,進而也分析了多復合結構的隔聲性能。
  8. In the upper troposphere, there is no intact asian active center. the troposphere structure of summertime ao is implicated with the horizontal heterogeneity of air temperature throughout the whole troposphere with its center over asian continent, which results in the zonal asymmetry and baroclinic structure of the summertime ao ( especially its asian center ). on the contrary, the correlation between wintertime ao and sea - land thermal contrast confines in the lower troposphere, hence its zonal asymmetry and baroclinity in the lower level

    夏季北極濤動的這種結構與對流的溫度水平分佈不均勻性有密聯系,且這種溫度分佈差異主要體現在亞洲大陸,因而也就使北極濤動的中緯度亞洲中心呈現出比同緯度帶其它區域更為明顯的緯向非對稱性和壓性;而冬季北極濤動受下墊面海陸分佈差異影響,其緯向非對稱型和壓性質主要出現在對流中低,在對流表現出很強的環形模態和正壓結構。
  9. The main crack of tiaohu formation are straight oblique - cracks and level crack, there are many scores in the crack. the length of cracks is long, and they cut across several layers. the average surface density of the cracks is 0. 101 slips / m. the cracks in lucaogou formation is mostly net cracks, and there are solution on crack surface

    條湖組的裂縫多為平直的交縫和水平縫,縫面多見擦痕,延伸長度大,穿多套地,裂縫面密度平均為0 . 101條米;蘆草溝組裂縫多為網狀裂縫,縫面有溶蝕現象,多存在於碳酸鹽巖內,裂縫面密度平均為0 . 143條米。
  10. There are 3 types of reservoir for the continuing subsidence type basin, there are diapir reservoir, fault reservior, drape reservoir, and the source rock is apart from the reservoir, they are contact by fault ; and there are anticline reservoir, fault reservoir, incline reserve ir, mudstone reservoir under the denudation area, and the source rock is contact with the reservoir

    以沉降為主要趨勢的盆地的油氣藏有底辟構造油氣藏、斷油氣藏、披覆構造油氣藏,其烴源巖與油藏在空間上是分離的,並通過斷相連;剝蝕區以下的油氣藏有背油氣藏或斷油氣藏、向油氣藏及泥質巖油氣藏,其烴源巖和油氣藏可有密的接觸關系。
  11. Solving the static correction problems under complex near - surface conditions is a systematic engineering. first, careful field weathering investigation must be done, then we have to take full advantages of refraction first - break information and field weathering investigation information to compute field static correction and large residual static corrections with various refraction first - break statics methods, finally, reflection statics methods are used iteratively to solve the residual statics problems. to solve serious static correction problems in complex near - surface areas of western china, different refraction first - break statics methods are studied in this thesis. the main study contents are as follows : 1 ) the propagation features of refraction for horizontal layered and dip media are studied firstly, it lays a good theoretical foundation for later statics method studies

    本文針對目前西部油氣勘探中迫需要解決的復雜地表區靜校正技術難題,對初至折射波解決二維和三維長、短波長靜校正問題的正反演方法進行了深入的研究和探討,研究內容主要包括( 1 )水平狀和傾界面折射波的傳播規律,為后續的折射靜校正方法研究奠定理論基礎; ( 2 )二維復雜狀介質地震折射波正演方法,該方法可適用於折射面起伏不大、低速和折射速度變化不大的情況。
  12. All the improvements included the modifications on the sound velocity, characteristic mach number and the mach number at the grid interface. several 2d flow fields which had shock, shear flow, rarefaction wave, or turbulent boundary layer and the combination of them were computed

    該格式改進了聲速、特徵馬赫數的處理方式,對網格界面馬赫數進行了修正,並求解了含有脫體激波、激波、剪流、膨脹扇、及湍流附面等流動特徵的復雜流動。
  13. Subsoil ; shear failure calculations for shallow foundations with oblique and eccentric loading ; explanations and examples of calculations

    土.淺基傾承載和偏心承載的變斷裂計算.第2 b
  14. In petroleum exploration and development, inclined and fractural formations are often encountered. it is necessary to solve in situ how to detect inclined formation, fractures, and their density and orientation

    如何利用聲波測井檢測傾、探測裂縫性儲集以及裂縫的密度和走向等,都是實際工作中迫需要解決的問題。
  15. As the strong normal share of the wind, turbulent fluctuation is strengthened and the sands are raised up from the surface ground the wind speed in the atmosphere of the low level has a horizontal share and this pushes the sands in the atmosphere aggregate, so the visibility descend

    近地面風速的垂直變和地面熱通量的加大,都可使使邊界湍流加強揚起地面沙塵。地面鋒區附近風場的強水平變,鋒面垂直環流及鋒后壓轉換的作用,將地面捲起的沙塵帶到高空,爆發強沙塵暴。
  16. The research and test results show that single - direction mining and slope cutting in the middle of face may reduce workers ' labor, shorten the working looping time, fasten the working schedule and improve efficiency

    研究和實測結果表明,在薄煤工作面採用單向割煤、中部進刀方式,不但降低了工人的勞動強度,而且減少了循環作業時間,提高了生產進度和效益。
分享友人