斜向應力 的英文怎麼說

中文拼音 [xiéxiàngyīng]
斜向應力 英文
oblique stress
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. The fault controlled the magmatism and metallization relevant to the contact zone, and deformed successively and produced cataclastic rocks and two sets of joints ; the second stage was from late cretaceous to eocene. the fault zone deformed right - laterally under ne - sw striking transtention, and new joints zone was produced at the end of the two main faults because of local stress concentration. the fault produced inchoative cataclastic rocks, and two sets of typical joints in plutons ; the third stage of deformation was relatively faint and only a little of microcracks was produced and infilled with vei ns in the deformed rocks, which was during the himalayan movement

    其後的繼承性活動在斷裂帶內形成碎裂程度最強達到碎裂巖的碎裂巖系列構造巖,變形帶兩側發育兩組典型的共軛剪節理;第二次在晚白堊世?始新世,斷裂在北東?南西近水平擠壓作用下右行張扭性活動,斷裂帶兩主斷裂在列重疊的端部由於局部集中進一步擴展形成節理帶,而斷裂在巖體區也發育兩組典型的共軛剪節理,斷裂內形成初碎裂巖為主的構造巖;第三次是喜山期以西側抬升、東側下降的強烈升降為主的活動,在基巖中,主斷層兩側圍巖出現微破裂。
  2. Analyze the stresses distributing of helical gear in long direction using 3dcbem. optimize the shape of dentiform using cvm as the optimize algorithm. the result were satisfied

    作者編制了齒輪前處理程序,用邊界元分析程序3dcbem分析了沿齒寬方的輪齒接觸的分佈。
  3. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內,另外,索和預加(梁縱、橫隔梁橫腹板豎)也施加在相的位置,分析了箱形主梁在自重、索和預作用下的空間
  4. The application of abaqus in research on simulation of 3 - dimensional ground stress field in synclinal structure

    構造三維地場模擬研究中的
  5. Cbm sealed condition is bad under neutral plane at axial part where shows tensile stress in syncline structure

    中和面以下表現為拉張軸部中和面以下的煤層甲烷封存較差。
  6. By means of stress - strain feature of upper and lower strata of fold neutral plane in the course of longitudinal fold formation, the differences between the upper coal bed and lower coal bed of fold neutral plane are analyzed from the coal thickness, coal structure, coal body structure, coalbed gas occurrence and diversities etc., revealing the cause of these appearances

    摘要利用縱彎褶皺變形中中和面上下巖層的不同變特點,分析了處于褶皺中和面上下各煤層在背部位煤層厚度、煤層構造、煤體結構及煤層瓦斯的賦存規律與差異性,揭示了這些現象產生的原因。
  7. It is to use finite element method to calculate the stress within the slope in this paper, and get the normal stress and tangent stress of the slope sliding surface directly, and then calculate the stability coefficient of the slope

    本文研究內容是用有限元法計算坡內部的,並直接求解邊坡滑動面上的法和切,進一步計算邊坡的穩定系數。
  8. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;變雙控制確保預施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  9. 2. a new design and construction method different from the traditional way was used in jinma bridge. when cantilever the main girder of the cable - stayed structure, the longitudinal pre - stressed reinforcements are not tensioned at once

    2 、金馬大橋在拉橋設計和施工中採用一種與傳統拉橋設計和施工不同的新方法,即懸臂澆築拉橋主梁時採用無縱筋的做法。
  10. This new erection procedure is compared with the conventional way from the reasonability, convenience and economic aspects. the results obtained from the calculating data state that cantilevering the main girder without tensioning the longitudinal pre - stressed reinforcements is a better way for establishing the cable - stayed bridge

    本文把這種方法與傳統方法在受合理性、施工方便程度和經濟性方面做了比較分析,並結合整體靜計算說明懸臂澆築拉橋主梁時不張拉縱筋這一方法的可取之處。
  11. Secondly, the basic principle on optimal design of structure is presented. based on the characteristics of aqueduct - stayed optimal design, cable optimization, aqueduct body selection optimization and aqueduct body vertical section optimization are included. the prestresses of cable - stayed, the dimension of aqueduct and the number of reinforcing steel bar are chosen as the design variables

    根據拉式渡槽優化設計的特點,本文將槽身優化分為索優化、槽身橫斷面優化以及槽身縱斷面優化三個方面進行優化設計,確定拉索預、槽身斷面尺寸、槽身橫及縱鋼鉸線配筋數量等槽身設計的主要變量。
  12. According to test results of two specimens of local transfer rc joint from inclined column to beeline - shaped wall under vertical static loads and results of corresponding finite element analysis ( ansys ), fundamental behaviors of the joint are achieved, which include paths of vertical load transfer before and after cracking, stress distributions, occurrence and development of cracks and final failure mode of the joint

    本文通過兩個鋼筋混凝土柱?一字形薄壁柱局部轉換節點在豎荷載作用下的靜試驗以及有限元分析,獲得了該節點的基本性能,其中包括開裂前後的豎荷載的傳遞路徑、試件分佈,裂縫的發生、發展,及試件最後的破壞形態等。
  13. It was showed that under the transverse tension, high stress concentration and even concrete cracks would appear on the oblique webs of the model

    研究表明,在張拉橫鋼束以後,主梁邊箱腹板中部會出現高拉區以及混凝土裂縫。
  14. In order to reveal load mechanism and failure mode of thick pile caps, by means of the test of 1 / 4 - scale models of thick pile caps with six piles and post - handling study of 3 - dimensional non - linear finite element adina, this paper points out the shortage, which is that the design of pile caps is carried out by flexural strength in chinese technical code for building pile foundations jgj94 - 94 and american reinforcement concrete building construction code aci318 - 02, promulgates that the failure mode of thick pile caps is punching failure and load transfer mechanism is the strut - and - tie, which is that zones of concrete with primarily unidirectional compressive stresses are modeled by compress struts, while tension ties are used to model longitudinal reinforcement over pile

    摘要為揭示厚承臺的傳機理和破壞形式,通過對4個1 : 5比例的六樁厚承臺的模型試驗研究與三維非線性有限元adina的后處理研究,指出中國建築樁基技術規范jgj94 - 94與美國鋼筋砼房屋建築規范aci318 - 02規范中,承臺以彎曲強度進行配筋計算的設計方法之不足,揭示出厚承臺的破壞模式是沖切破壞,傳機理是以帶有主要單的砼區域作壓桿,樁頂區域的縱筋作拉桿的空間桁架。
  15. Author thinks that the direction of the maximum plastic distortion along a constant radius around the crack tip may be considered as the direction of shear - mode fracture ( named pmax - criterion ) and the load when located shear band prongs the ligament in the front of crack tip is regarded as the limited load of shear - mode fracture. ( 3 ) the fad ( fracture assessment diagram ) of titled crack is proposed based on achievements of mesomechanics about i - ii complex ductile fracture of metal, and the titled crack is classified two kinds : void - mode fracture is assessed by fracture assessment curve, and shear - mode fracture by limited load. ( 4 ) using a fe program based on plantle - ressue theory to calculate some mesomechanical parameters, a flange joint structure of a high pressure vessel ( design pressure 31. 4mpa and the thickness of the hemispherical head is half of that of shell. ) is analyzed to determine whether the structure under operation pressure is safe or not, forecast the mode of potential invalidation and argue for the rationality of design of the structure

    試件的整體斷裂為剪切型,但在試件芯部裂尖鈍化區中部出現了韌窩型啟裂並有一定的擴展,說明局部較高的三軸度也會使韌窩型機制得以發展,但是不改變試件整體的剪切型斷裂模式;對韌性斷裂的剪切模式的細觀機理做了一定的探討,並且提出了含裂紋構件剪切型斷裂的宏觀判據:認為裂紋前方的集中剪切帶中與裂紋尖端等半徑處最大有效塑性變出現的方可以作為裂紋剪切斷裂的方(可簡稱為_ ( pmax )準則) ,集中剪切滑移帶貫穿裂紋前方承載韌帶時的載荷可以作為極限載荷;本文運用金屬韌性斷裂細觀學在一復合型韌性斷裂方面的研究成果,採用失效評定圖的形式,提出了傾裂紋的安全性評定方法的基本框架。
  16. Therefore, it might be very essential to study the cable stayed bridge of the super breadth composite beam. additionally, the main problems of the study are as follows : 5 、 the distributing for stress of lengthways and transverse in transect ; 6 、 discussing the change of stress of lengthways and transverse, while the breadth of bridge is changing ; 7 、 in the cable stayed bridge of the super breadth composite beam, the lengthways reinforce rib and rigidity crossbeam exert influence on stress of bridge board ; 8 、 while tower and beam are concretion, main tower affects bridge board

    鑒于目前關於此類橋型研究成果不多,就此作了下列若干問題的研究: 1 、超寬疊合梁拉橋橫斷面上縱分佈和橫分佈特點的研究; 2 、對超寬疊合梁拉橋隨著橋寬變化時,上述兩種分佈變化規律進行探討; 3 、在超寬疊合梁拉橋中,縱加勁肋對橋面板受的影響;橫梁尤其是剛性橫梁在橋面板受中所起的作用; 4 、塔梁固結時,主塔對橋面板的作用。
  17. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受的實際工況,對異型截面拉橋索塔錨固區節段最不利斷面在環與索共同作用下塔壁的進行了研究。
  18. In the test, the stress distributions of wall which is upon the transfer beam and square column and the vertical stress distributions of transfer beam and inclined column are specially studied

    試驗重點研究了兩類節點中薄壁柱與方柱和轉換梁相接處的豎狀態、轉換梁狀態以及柱和方柱的狀態。
  19. According to the pseudo static tests on two specimens of transfer floor from inclined column to framed short - leg shear wall, which are subjected to the vertical loads and the horizontal cyclic loads, in this paper the stress distributions, final failure model of the specimens, paths of the load transfer and the mechanical behaviors of the transfer beam are studied in detail, the ductility and energy dissipation of the specimens are also specially studied

    摘要通過對兩榀框支短肢剪柱轉換結構在豎荷載及水平低周反復荷載共同作用下的擬靜試驗,分析了試件的分佈狀態、破壞形態、荷載傳遞規律以及轉換梁的受性能和試件的抗震性能。
  20. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體學參數的關系、土釘總與庫侖土壓間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸分佈規律、開挖方式及原始邊坡形態對土釘的軸的影響、上下階邊坡在土釘軸方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓分析對朗肯、庫侖兩種經典土壓理論的區別與聯系、坡面傾及墻背有摩擦時的坡面豎分佈、面板背土壓的分佈形態作了研究,得出了邊坡支擋土壓受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受有利等結論。
分享友人