  1. And so on, the mathematical model and transfer function of the tracking system are built, and the feasibility of the tracking control system design is demonstrated. furthermore, the static error of the system with a unit incline input is deduced. a majority of model of unit is based on analytics, so the general model can apply to other optical intersatellite communications systems

    在此礎上,將atp跟蹤控制子系統視為性定常系統,通過解析法和實驗法對子系統的各個控制環節的單元器件進行合理建模,得出整個環路總的開環及閉環傳遞函數,論證了本課題所設計的atp跟蹤控制環路的可行性及其視軸輸入為信號時的理論穩態誤差。
  2. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩有深厚覆蓋層的堆石壩,心墻和壩防滲墻的應力和變形是壩體、壩最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層礎防滲設計、壩混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的礎上,對粘土心墻和壩垂直防滲方案、瀝青混凝土心墻和壩垂直防滲方案以及粘土心墻和壩水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非性計算分析;對左岸高陡邊的大壩防滲體與礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  3. On the basis of displacement - time series of the slope, a nonlinear dynamic model is set up according to backus generalized linear inversion theory in this paper. due to the equivalence beween autonomous gradient system and catastrophe model, a standard cusp catastrophe model can be obtained through variable substitution. the method is used in analysis of displacement data of huangci landslide and wolongsi landslide and in understanding how slopes evolve before sliding. the result shows that the nonlinear dynamic model can make satisfactory prediction result. is it most important that there is a sudden fall of d, which indicates the occurrence of catastrophe ( when d = 0 )

    研究表明,滑變形失穩過程具有混沌和分維特性,可以用分形理論來研究滑預測問題,於對任一連續函數,至少在較小的鄰域內可以用多項式任意逼近的數學理論,運用改進的backus廣義性反演理論,以位移時間序列為礎,反演了演化的非性動力學模型。並利用自治梯度系統與突變模型的等價性,通過變量代換得到標準的尖點突變模型。
  4. Accordring to basic concept and assumes essentially on the basic of sweden method of slices, be living below the maximum equilibrium state, the function expression about stability safety homogeneous slop is deduced, and the slope surface is consist of two lines and an arc, afterwards according to analysis theory of minimal value ruling on the basic of the maximum, genetic algorithm is applied to slove the dangerousest slide situation and radius and corresponding safely factor

    根據瑞典圓弧法的本概念和本假定,在極限平衡狀態下,推導了兩直段均質穩定性安全系數函數表達式,然後根據極限分析理論的極小值原理,利用遺傳演算法,求出了邊穩定性安全系數極小值,並得到最危險滑動面的滑弧半徑和滑弧中心坐標。