Combining with the research task researching on the deformation and stability of deep excavated cuts and high filled embankment of the traffic department in fujian province, based on the residual soil slope project on the project site at k15 + 183 of yong - zhang highway ( yong ' an section ), adopting non - linear theory, modern monitoring technology and numerical simulation technology, the deformation and stability of cutting cliff debris and residual soil slopes have been studied systemically and synthetically in the thesis. at the same time theory analysis, the analysis and estimate of field monitoring are taken into account in this course. main research work and working achievement are summed up as follows : ( 1 ) with the acquaintance of the trends and development about the deformation and stability of slopes at home and abroad, slopes are classified and summarized systemically
並通過k15 + 183工點路塹土質邊坡的各類位移變形的監測成果驗證了該程序的正確性及適用性; ( 5 )通過應用大型有限元軟體ansys模擬分析,不僅分析了其隨著開挖時間步的應力應變關系,並模擬了與實際測斜管相匹配的測斜路徑,通過對各開挖時間步的模擬計算分析,得到了與實測數據較符合的結果; ( 6 )綜合監測分析成果和極限平衡理論計算分析成果,對k15 + 183工點路塹邊坡的原設計坡率和幾何形態進行了優化計算分析,取得了較為滿意的結果。The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing
2 . 3 . 1在工程項目的施工期內,主要的工程活動包括挖填土方工程斜坡工程護土墻灌溉緩沖湖靜水塘缸沙坑及高爾夫球場的加蓋草皮鋪設。The main causes of breakage were concrete tube pile instability of foundation pit or failure of its bracing, soil squeeze due to pile driving, incorrect excavation and incorrect heap of soil
摘要造成混凝土管樁傾斜與斷裂的主要原因為基坑邊坡失穩或支護結構破壞、沉樁擠土效應以及挖土與堆土不當等。With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure
通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。分享友人