斜應力 的英文怎麼說

中文拼音 [xiéyīng]
斜應力 英文
inclined stress
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構監控的方法、布點、測讀及其對測讀數據的合理分析方法,索檢測和結構溫度監測的方法。
  2. Perfect pre - processing and post - processing function is one of the main factors to evaluate the vitality and market value of the finite element analysis system surveying today development of finite element analysis technology, most of which concentrate on establishing fine user interface, also has some limitation on application, and especially, the research on the visualization of arbitrary cut - plane is always in ascendants to realize the visual processing on cut - plane needs reprocessing the results of finite element analysis which have get, so the algorithm is two parts : seeking the physical value of cut - plane and drawing 2d contours, the former, based on the theory of stress on " arbitrary inclined plane " in physical mechanics, use the method of linear interpolation method to get the coordination and physical value of intersection between cut - plane and element arris ; the latter, based on the tables on elements, nodes, stress and strain, summarize a rapid algorithm of generating 2d contours based on the grid. this thesis synthesizes there two parts and get a visual processing program under fortran

    縱觀有限元分析技術的發展,目前大多集中在建立良好的用戶界面上的研究仍存在許多用上的局限性,其中對任意剖面上可視化的研究仍處于方興未艾的階段。要實現任意剖面上可視化處理,必須先將得到的有限元計算結果進行再處理,因此在演算法上分為兩部分:求任意剖面上物理量值的演算法及二維等值線演算法。前一部分以彈性學中「任意截面的」為理論基礎,利用線性插值方法得到截面與單元棱邊的交點坐標及交點物理量值;在此基礎上;根據已得到的單元及節點序號表、變物理量表,總結出一種基於有限元剖分網格的快速生成二維等值線的演算法。
  3. The fault controlled the magmatism and metallization relevant to the contact zone, and deformed successively and produced cataclastic rocks and two sets of joints ; the second stage was from late cretaceous to eocene. the fault zone deformed right - laterally under ne - sw striking transtention, and new joints zone was produced at the end of the two main faults because of local stress concentration. the fault produced inchoative cataclastic rocks, and two sets of typical joints in plutons ; the third stage of deformation was relatively faint and only a little of microcracks was produced and infilled with vei ns in the deformed rocks, which was during the himalayan movement

    其後的繼承性活動在斷裂帶內形成碎裂程度最強達到碎裂巖的碎裂巖系列構造巖,變形帶兩側發育兩組典型的共軛剪節理;第二次在晚白堊世?始新世,斷裂在北東?南西向近水平擠壓作用下右行張扭性活動,斷裂帶兩主斷裂在列重疊的端部由於局部集中進一步擴展形成節理帶,而斷裂在巖體區也發育兩組典型的共軛剪節理,斷裂內形成初碎裂巖為主的構造巖;第三次是喜山期以西側抬升、東側下降的強烈升降為主的活動,在基巖中,主斷層兩側圍巖出現微破裂。
  4. Analyze the stresses distributing of helical gear in long direction using 3dcbem. optimize the shape of dentiform using cvm as the optimize algorithm. the result were satisfied

    作者編制了齒輪前處理程序,用邊界元分析程序3dcbem分析了沿齒寬方向的輪齒接觸的分佈。
  5. The deformation of slope caused by change of ground water level was investigated by adopting a fully coupled procedure and the state - dependent dilatant sand model

    本文採用完全耦合有效分析程序和與狀態相關的剪脹性砂土模型模擬坡因地下水位變化而發生的變形。
  6. The actual stresses do not exhibit the discontinuity of slope at the centre indicated by the elementary theory.

    實際在中心處存在初等理論所指出的率不連續性。
  7. Stressed - type fastenings with taper action ; taper keys with gip head, keyways, dimensions and application

    錐度驅動型緊固件.彎頭鍵鍵槽尺寸和
  8. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內,另外,索和預加(梁縱向、橫隔梁橫向、腹板豎向)也施加在相的位置,分析了箱形主梁在自重、索和預作用下的空間
  9. The penetration test study the disturbance of soil in difference location. by using finite element method, the paper study the stratum movement and the earth surface deformation caused by pipe jacking, analysis the construction parameter such as head pressure, deflexion, friction force impact on earth surface deformation, give the distributing rule and range of additional soil pressure in soil

    採用有限元計算分析的方法,對頂管施工引起的地層運動及地表位移進行研究,分析了機頭土壓、機頭偏、摩阻等不同施工參數對地表變形的影響以及附加在土中的分佈規律和影響范圍。
  10. Calculation and research of normal section strength of prestressed concrete skew hollow slab

    混凝土交空心板正截面強度計算研究
  11. Steel strands shape parameters of skew prestress box girder

    交預箱梁鋼絞線形狀特性及其影響
  12. As the balancing platform tends to make the barycenter move backward, a more balancing stress distribution under the wall, a higher and steadier wall can be achieved. furthermore, the resupine back of the downward wall not only works reasonably, but also can reduce the amount of excavation and filling obviously. so gravity retaining walls with balancing platform are applied heavily

    衡重式擋土墻因具有衡重臺使墻身重心后移、墻底趨于平衡,可提高擋土高度、增強墻體穩定性;且仰式下墻不僅受合理、還可減少開挖與回填量等優點而被大量採用。
  13. Through tracing the change of the stress on the horizontal and slantwise paths, the influence and scopes of the excavation effect on the inside stress field of the slope are put forward

    通過對水平和傾路徑的追蹤,提出了開挖效對邊坡內部場的影響程度和范圍。
  14. The application of abaqus in research on simulation of 3 - dimensional ground stress field in synclinal structure

    在向構造三維地場模擬研究中的
  15. Cbm sealed condition is bad under neutral plane at axial part where shows tensile stress in syncline structure

    中和面以下表現為拉張,向軸部中和面以下的煤層甲烷封存較差。
  16. Cbm is easy to escape over the neutral plane where shows tensile stress in antiform ; cbm accumulates under the neutral plane

    構造中和面以上表現為拉張,煤層氣容易逸散,中和面以下煤層甲烷聚集。
  17. Application of caving mining technology with bottom under condition of flat dipping mid - thick body and unstable rock caused the most of trench and bottom drift, located in abutment, to be destroyed and low recovery in south area, xishimen iron mine

    摘要在緩傾中厚礦體底板巖性不穩固的條件下,採用有底柱崩落法,由於電耙道大多處于空區邊部集中的部位,致使塹溝及底部結構巷道破壞嚴重而使回收率極低,採用無底柱崩落卸壓則可有效解決上述難題。
  18. The result indicates that, after the bridge built, the stress change around major bridge pier is the greatest, and the effect to the stability of slope is also the greatest

    研究表明:橋荷載施加后,主橋墩處的改變最顯著,對坡穩定性影響較大。
  19. Combining with the research task researching on the deformation and stability of deep excavated cuts and high filled embankment of the traffic department in fujian province, based on the residual soil slope project on the project site at k15 + 183 of yong - zhang highway ( yong ' an section ), adopting non - linear theory, modern monitoring technology and numerical simulation technology, the deformation and stability of cutting cliff debris and residual soil slopes have been studied systemically and synthetically in the thesis. at the same time theory analysis, the analysis and estimate of field monitoring are taken into account in this course. main research work and working achievement are summed up as follows : ( 1 ) with the acquaintance of the trends and development about the deformation and stability of slopes at home and abroad, slopes are classified and summarized systemically

    並通過k15 + 183工點路塹土質邊坡的各類位移變形的監測成果驗證了該程序的正確性及適用性; ( 5 )通過用大型有限元軟體ansys模擬分析,不僅分析了其隨著開挖時間步的變關系,並模擬了與實際測管相匹配的測路徑,通過對各開挖時間步的模擬計算分析,得到了與實測數據較符合的結果; ( 6 )綜合監測分析成果和極限平衡理論計算分析成果,對k15 + 183工點路塹邊坡的原設計坡率和幾何形態進行了優化計算分析,取得了較為滿意的結果。
  20. By means of stress - strain feature of upper and lower strata of fold neutral plane in the course of longitudinal fold formation, the differences between the upper coal bed and lower coal bed of fold neutral plane are analyzed from the coal thickness, coal structure, coal body structure, coalbed gas occurrence and diversities etc., revealing the cause of these appearances

    摘要利用縱彎褶皺變形中中和面上下巖層的不同變特點,分析了處于褶皺中和面上下各煤層在背與向部位煤層厚度、煤層構造、煤體結構及煤層瓦斯的賦存規律與差異性,揭示了這些現象產生的原因。
分享友人