斜板箱 的英文怎麼說

中文拼音 [xiébǎnxiāng]
斜板箱 英文
tilting box
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  1. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內力,另外,索力和預加力(梁縱向、橫隔梁橫向、豎向)也施加在相應的位置,分析了形主梁在自重、索力和預應力作用下的空間應力效應。
  2. We mainly produce shifting fork and release fork of large - scale and heavy - duty truck ; shifting fork, release fork, shifting block, choosing - gear shaft, reverse - gear shifting fork shaft, right - and - lfet steering joint arm, upper cross arm shaft, wheel hub, link rod of all kinds of cars right - and - left supports, nipbutton of train auto - girder parts ; centeral wedge, fixed lean - board of absorber ; shifting fork, erankshaft, link rod, under - link board, startup pole of motocycle ; mould forging of mine, construction machinery, textile machinery, non - ferrous metal industry, etc

    主要生產產品:大、重型卡車變速的撥叉、分離叉等;各種轎車變速的撥叉、分離叉、撥塊、選檔軸、倒檔撥叉軸、左右轉向節臂、上橫臂軸、輪轂、聯桿,火車自動梁部件的左右支柱、夾扣,減震器的中心楔塊、固定等鍛件;摩托車的撥叉、曲軸、連桿、下聯、啟動蹬桿總成;礦山機械、建築機械、紡織機械、有色金屬等精模鍛件。
  3. According to the analysis result, the reason of the inclined cracks in the box girder webs of the bridge is found

    根據分析結果,找到了該橋梁腹裂縫的成因。
  4. Uses 4 gaas power double amplifier module. plug - in level adjustment and slope adjustment for each way are on the back panel, comvenient to use

    4個高電平素出採用4個砷化鎵功率倍增放大模塊輸出,每路獨立的電平調整插件式和率調整插件式在機上,使用方便。
  5. They may range from the single cell or multicell box with rectangular sides to a similar trapezoical type with sloping sides.

    它們包括有單和多,有矩形和有向腹類似梯形的類型。
  6. In environment water treatment aspect, there are professional technology staff who are working on environment protect and dedicate to transplant foreign advanced technology, meanwhile they develop acidity / alkalescence waste water treatment technologies and equipment, soft water desalination technologies and equipment, high effectual lime preparation and putting set, high effectual integration putting set, at the same time, develop gravity sand filters, bevel precipitate set, many series of filter set, super filter set, prevent infiltration set, cooling tower, large - sized frothing water tank, cleaning device etc. all these technologies and equipments are domestic leading level

    環保水處理方面,有專業從事環保方面的技術專業人員,在從事多方面環境污染治理工作的基礎上,致力於消化移植國外先進技術,研製開發出酸性/堿性廢水處理工藝和成套設備、軟水脫鹽水工藝和成套設備、高效石灰乳制備及投加裝置、高效一體化加藥裝置,同時開發出重力砂濾器、沉澱器、多種過濾器、超濾裝置、反滲透裝置、冷卻塔、大型鼓泡水、清洗裝置等單體設備,這些工藝技術與設備均居於國內領先水平。
  7. This paper highlights the durability design features and design alternative adopted for the parts of steel structure, concrete decks of and joints between steel and concrete composite box girder for the cable - stayed spans of donghai bridge over main navigable channel in the marine environment

    摘要介紹東海大橋主航道拉橋鋼混凝土形結合梁的鋼結構部分、混凝土橋面、鋼混凝土結合部位在海洋環境下耐久性設計特點及採用方案。
  8. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    梁製造由鋼筋工程、模工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  9. This vessel is a steel box - type working ship with single continuous deck, deck bottom being transverse framing, sheer being transverse framing, and tapered bow stern

    本船為鋼質單連續甲,甲和底部為縱骨架式,舷部為橫骨架式的首尾端削的方型工程船舶船型。
  10. It was showed that under the transverse tension, high stress concentration and even concrete cracks would appear on the oblique webs of the model

    研究表明,在張拉橫向預應力鋼束以後,主梁邊中部會出現高拉應力區以及混凝土裂縫。
  11. During the finite element modeling of the bridge, the factors affecting the accuracy of the finite element model are discussed in detail, such as, the geometrical non - linearity of the cable including gravitational sag and initial tension, and the structural orthotropic steel box - girder deck to be equivalent to physical orthotropic deck by using compound material mechanics, and so on

    在建模過程中,盡可能多地考慮了一些影響全橋有限元模型精度的因素:如拉索的幾何非線性(重力垂度和初始應力) ,將構造正交各向異性鋼梁橋面用復合材料力學的方法等效為物理正交各向異性等。
  12. The main conference hall sits above the water tank on a carpet of insulation - with its ceiling inclined towards south to provide a mounting position for the solar hot water panels

    主要的會議大廳位於水之上,水與大廳地完全絕緣,大廳的天花朝南傾,這種設計為太陽能熱水提供了一個可安裝的位置。
  13. Model test study on arbitrary euadrilateral slab briolges. ( 2 ) analysis of curued and skew slab bridge. ( 3 ) stetic and dynamic analyzis of curued box girder bridge. ( 4 ) application of cad technic in the design of unregular plate bridges. ( 5 ) analgsis of unregular plate bridge

    變厚度異型橋的模型試驗;彎復合型橋的分析;彎梁橋的靜、動力分析; cad技術在導型橋設計中的應用;不規則橋梁的力學分析。
  14. Analysis could also show, to improve the stress distribution of the twin - box single cross section of cable - stayed bridge, it is the best way by thickening the bottom flange

    分析還表明,加厚底拉橋雙單室形主梁應力分佈的改善效果最佳。
分享友人