斜鉆孔 的英文怎麼說

中文拼音 [xiézhēnkǒng]
斜鉆孔 英文
deviating hole
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  1. The le - an oil field is located on the southern slope of dong - ying sag. there are two sets of ek basalt in its western block. depending on the drilling, the logging and the seismic date, tha ek basalt has the characteristics of high resistancs, the low sound wave defferance and faradic conductance, the smooth curve of self potential

    樂安油田位於東營窪陷南坡上,其西區發育了兩套店組玄武巖,根據井、測井、地震資料,店組玄武巖具有電阻率高、聲波時差值和感應電導率值低、自然電位曲線平直的特點,地震波呈板狀強反射;沉積期該區有有二次火山活動,玄武巖平面分佈比較穩定,噴發方式為「裂隙式噴溢」 ,火山口分別位於草12和草31井附近。
  2. General technical condition of all - direction borehole inclinometer for mining

    礦用全方位儀.通用技術條件
  3. Application and research of the high accuracy and all - directions borehole inclinometer

    高精度全方位儀的研究及應用
  4. Ground coupled heat pump system two vertical and two inclined bore holes 32 metres into the earth capture underground heat and provide cooling or heating

    地源熱泵系統由兩個垂直和兩個傾的32米深及埋管組成,利用地下蓄熱的特性提供熱源或冷源。
  5. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗井採用小斷面導硐后刷大、高負壓多排強抽,密集交叉邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  6. Being a deformation measurement with high resolution, borehole tiltmeters should be installed far away from disturbance sources as far as possible

    摘要作為一種高精度的形變觀測,觀測點必須盡可能避開干擾源。
  7. Rivers, lakes, large warehouses and railway are some of the main sources of disturbance affecting the tilt field due to mechanical loading and unloading on the surface

    河流、湖泊、倉庫(貨場、列車編組站)和鐵路,是幾種主要的影響觀測的地面載荷變化干擾源。
  8. The basic conditions of verifying bore in wutunsuo mine, plans of rectifying deviation, installation and use of mwd directional drilling system, and problems encountered in construction are narrated

    摘要敘述了武所屯井檢的基本情況,方案, mwd定向進系統安裝與使用以及施工中遇到的問題和解決辦法。
  9. Drilling of soil nails for slope no. dc30 near the afcd office

    鄰近於漁農自然護理署進行dc30坡的泥釘工程
  10. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋灌注樁基樁施工中,在不同地質條件下,水上機平臺的搭設、成設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾巖面上嵌巖面上底標高問題作了探討
  11. Pujiang tianhe crystal craftwork factory is a manufacture in all kinds of crystal frame crystal craftwork glass craftwork acrylic craftwork hotel commodity and crystal glass houseware and so on we have rebuilded design by ourselves milling machine profiled machine carve machine roll machine bevel edge machine and all kinds of produced machine such as drill machine press model machine inner - carve machine facet hot flex machine and silk - screen machine etc own professional designers machanician have immovable worker 120 thereinto high - grade antificer 5 intermediate 10 professional qc 15

    廠里有自行改造設計的水晶玻璃平磨機異型機雕刻機滾圓機邊機,以及各類用於工藝品加工和生產的機器如機壓型機內雕機刻面機熱彎機絲印機等。
  12. Various deviation surveying, preventing and controlling systems used for continental scientific drilling and deep hole drilling in crystalline rock are collected and summed

    收集和總結了主要科學探項目和結晶巖深取心探項目採用的、防和糾(造)系統。
  13. And it has been made high praises by yuhuai railway construction headquarters for its great contributions to the whole construction. the scheme put forward in this paper which is briefly described above is reasonable and feasible in the practical project. thereby, the research achievements obtained in this paper will play the referring and guiding roles for later similar projects

    本文所提出的雙壁鋼圍堰與樁相結合的復合基礎在傾度較大的河床上的抗滑方案在實際工程的施工中是合理的、可行的,本文的研究成果對以後類似工程的施工有一定的借鑒和指導的作用。
  14. Drilling track is key factor which decide trenchless success or failure, but controlling drilling track stay around rectifyed phase at the present. guided the theory of force is the key affectting the drilling track, the paper discuss primary factors on contralling drilling track, and advance the formulary ahout reckoning deviation force and azimuth force, expect to achieve the aim that drilling track were controled real time and be anticipated, and have the initiative on drilling track contaolling

    巖層進軌跡是決定非開挖成敗的關鍵因素,目前對軌跡的控制僅僅停留在被打糾偏層面上,本文在力是影響進軌跡本質因素理論指導下,對影響巖層進軌跡控制的因素進行了理論探討,並針對造力和變方位力提出了計算模式,希望最終能實現軌跡的實時監控與調整,變被打糾偏為主動進。
  15. It has 8 series of products with more than 20 types of machines, including glass linear double - edging machine, glass linear edging machine, linear circular edging machine, glass linear edging machine for bevel edge, glass washing machine, sepcial edging machine, drilling machine, beveling machine and glass sandblasting and carving machine and some other popular glass deep - processing machines

    現有八大系列,二十多種機型的產品,包括直線雙邊磨邊機、直線磨邊機、直線園邊機、邊機、清洗機、異形機、機、倒角機和噴沙雕刻機等。
  16. Science orientation, leading technology, pragmatic development and quality first are the business tent of the company. gone through 15 years development, the company has developed eight different series and over 30 varieties of product models including straight - line double edge serial, straight - line single edge maching serial, straight - line single round - edge maching serial, auto manual shape bevellers series, automatically vertical and horizontal drilling maching serial and cleaning maching serial etc. the company is also able to design production line for customer, and be able to evaluate, design and building processing workshop for customer. innovation gets rid of stale products and brings forth new products, occupying the leading position in international market and domestic market with their good and perfect service. the company has passed the cetification of iso9001 : 2000 and ce authentiaction. practice strictly quality control in product production, product design seedks after concisions and reliability easy for operation and maintenance with reasonable price performance ratio for complete set fo machinge and cost effective for customer in prophase investment and post - phase investment, and become the advocator for economization, " man - machinge communication, unrestrained and far - ranging " suntech machinery company has provided broad space for customer to purchase equipment

    億海機械製造有限公司原新海岸創立於1991年,佔地6萬平方米,現有員工五百人,是一家專業生產玻璃深加工設備的企業,集技術開發規模生產,售前售後的技術培圳於一體。 「科技導向技術領先務實發展質量第一」 ,是億海公司的經營宗旨。經過十五年的發展,現在八大系列,三十多種機型的產品,包括直線雙邊機系列,直線雙圓邊機系列,邊機系列,直線單邊機系列,直線單圓邊機系列,自動立式臥式機系列,清洗機系列等,公司還具備為客戶設計生產連線,為客戶評估設計購建加工車間等。
  17. The technical method of accurately determining bore - hole trajectory using common surveying instrument

    應用普通測儀精確確定空間軌跡的技術方法
  18. The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test

    本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下樁施工、承載力3000kn拉式掛籃開發與研製、梁部施工、新型橋面鋪裝層施工技術及動靜載試驗。
  19. Technique for gas drainage from high - located inclined holes in roof

    頂板高位傾斜鉆孔抽放采空區瓦斯
  20. Problems and countermeasures in respect to the construction of raked bored piles are also discussed in this paper

    提出開發灌注樁需要解決的問題和應對措施的設想。
分享友人