新填土 的英文怎麼說

中文拼音 [xīntián]
新填土 英文
recent fill
  • : Ⅰ形容詞1 (剛出現的或剛經驗到的) new; fresh; novel; up to date 2 (沒有用過的) unused; new 3 (...
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  1. Recently, using solid clay brick is gradually prohibited, so the new wall material is required to fill up the new architecture. many sections research on this field, using fly ash to develop new building materials is the mostly adopted method, among the new building materials, fly ash foamed concrete is a noticeable one because of its outstanding merits such as light weight, heat preservation, sound insulation and good resisting earthquake. using fly ash to develop foamed concrete can not only become fly ash into resources, but also provide a new kind of building materials for the innovation of wall materials, which has good economy and society ben efits

    近年來,由於墻改「禁實」政策的實施,市場急需的墻體材料來建築所需,許多單位相繼開展了各有關研究,綜合利用粉煤灰研製開發型建材逐漸成為了主流,其中多孔混凝特別是粉煤灰發泡混凝,正以它突出的輕質、保溫、隔音、抗震效果好等優點,成為一種引人注目的建築材料,利用工業固體廢棄物粉煤灰研製發泡混凝不僅能實現粉煤灰的資源化,而且還可為墻體材料的改革提供一種型建築材料,具有較好的經濟效益和社會效益。
  2. Descending into the grotto, he lifted the stone, filled his pockets with gems, put the box together as well and securely as he could, sprinkled fresh sand over the spot from which it had been taken, and then carefully trod down the earth to give it everywhere a uniform appearance ; then, quitting the grotto, he replaced the stone, heaping on it broken masses of rocks and rough fragments of crumbling granite, filling the interstices with earth, into which he deftly inserted rapidly growing plants, such as the wild myrtle and flowering thorn, then carefully watering these new plantations, he scrupulously effaced every trace of footsteps, leaving the approach to the cavern as savage - looking and untrodden as he had found it

    然後,走出洞來,把那塊石頭蓋回原處,在上面堆了些破碎的巖石和大塊的花崗石碎片,又用泥滿石縫,移了幾棵香桃木和荊棘花種植在這些石縫里,並給這些移種的植物澆些水,使它們看起來象是很久以來就生長在這兒的一樣,然後擦去四周的腳印,焦急地等待他的同伴回來。他並不想整天地去望著那些黃金和鉆石,或留在基督山島上,象一條似的守護著那些沉在地下的寶藏。
  3. Planners are heavily involved in the land use planning of new development areas including new towns and newly reclaimed areas. green spaces including open spaces and amenity areas are key elements that help to make the area a better place to live, work and enjoy

    規劃師在發展區如市鎮及海的地規劃中,都會及規劃綠化地帶的工作,令地區有一個更舒適居住工作和游樂環境。
  4. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體石方檢測路基不同回物界面檢測海回物巖溶檢測樁基無損檢測地下管道探測地下隱蔽物探測考古斜坡滑體探測地質結構探測湖底探測高速公路路面及路基檢測。
  5. The experimental study of twelve push - out specimens with different hole molds and different materials filled in holes and two composite steel - fdpcp ( full - depth precast concrete panels ) beams of a full shear connection and different hole mold, as well as a composite steel - fdpcp beams of a partial shear connection and square holes was conducted in this paper, the authors gain following results : three composite steel - fdpcp beams all have good composite action and perfect work behaviors as a whole and the composite steel - fdpcp beams is a new - style structure which should get further research and development

    摘要對12個不同預留孔形、孔內不同充材料的推出試件及2根不同預留孔形的完全剪力連接與1根部分剪力連接的鋼混凝預制板組合梁進行了試驗,結果表明,只要預留孔形設計合理,灌孔混凝強度得當,鋼混凝預制板組合梁就具有良好的組合效應和整體工作性能,是一種有發展前途和廣泛應用領域的型組合結構。
  6. This paper discusses the train of thought for sea reclamation planning at the estuary district of the pearl river delta based on the research on sea reclamation, combining concrete conditions of the sea area at the estuary district, surrounding circumstances of resources, as well as the state of land utilization, and from the view of protecting the existing establishments near this district, and promoting the formation of favorable ecological environment at the district and implementation of the thought step by step under current policy

    摘要通過對海工程的相關案例研究,結合珠三角河口地區海域的具體情況、周邊資源條件及地利用情況,從有利於保護周邊現有生產生活設施、有利於形成的水岸生態環境、有利於在現行政策環境下分步推進等角度出發,探討在珠三角河口地區進行海造地工程的規劃思路。
  7. The fresh soil and water loss caused in the road construction often appears at the roadbed, rock slope and the place for the discarded soils and gravel, which will do harm to the rivers, reservoirs and the crop fields and pollute the surrounding environment

    道路建設產生的的水流失主要發生在挖方、方路基、邊坡、棄(石)場以及施工過程中的亂挖、亂堆、亂倒,它主要危害建設區內的河流、水庫、農田和村莊,污染周圍環境。
  8. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有限元法模擬分析涵洞基坑開挖時,採用分層、分步模擬開挖過程的方法,即將計算域內單元分層「挖去」 ,使開挖表面成為無應力表面的方法,分析體在卸載狀態時的應力場和位移場隨開挖深度的變化規律;在洞體施工后,回體時,據開挖完成時的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級增加單元的自重荷載,利用有限元法模擬基坑及上覆體分層築的施工過程,這不僅反映體處于再加載應力狀態時,受力及變形的一般規律,而且這種將地基? ?涵洞? ?體作為一個統一整體進行模擬的方法,量化了三者之間的相互作用關系。
  9. The preventing flood and draining waterlogging plan of china - singapore suzhou industrial park by taking the following factors into consideration, such as the cost, the characteristics, the management, the full utilization of the land, and the investor ' s psychological influence etc, this plan was elaborated by comparing the program of connecting protective embankments with the program of filling pits with earth. 2

    《中蘇州工業園區防洪排澇規劃》通過對聯圩方案及方案,在工程投資、運行管理、地利用、工程特色以及對投資商心理影響等方面的綜合比較,確定合理的工程方案。
  10. The west kowloon reclamation will provide housing for more than 100 000 people, commercial space and vital road and rail arteries linking kowloon with the new airport and north - west new territories

    西九龍海區將為超過10萬名居民提供住所,並設有商業用地。該海區也為連接九龍與機場和界西北部的重要道路及鐵路干線,提供地。
  11. Tokyo gas, the utility whose land it was, is removing 2m ( 6. 6 feet ) of topsoil, and 2. 5m of fresh soil is going on top, but environmentalists say that an earthquake or a tidal surge would bring the benzene straight back up to the surface again

    東京燃氣因此將深達兩米( 6 . 6英尺)壤表面挖掉,回了2 . 5米的,但是環保人士稱地震或潮汐仍將把苯毒再次翻上來。
  12. Thaw settlement cause negative friction. this paper base on the thought of " initiative cooling ", aim at three problems existing in common concrete pile used in frozen soil, a new type of pile is proposed to overcome the disadvantages of the classical pile used in frozen soil. pile body within active layer is fluted and refilled with porous materials such as gravels and ballasts, convection will be occur and then thermal exchange inside porous material in winter while only heat conduction exists in summer, as a result the soil around flutings will be cooled, so the top line of permafrost will be drive up

    本文基於「主動冷卻」地基的思想,以及針對凍地區普通混凝樁存在的三大問題,提出了一種型樁的設計思路,運用數值模擬試驗手段對其冷卻機理與加固機理進行了系統研究,即在凍融活動層的深度范圍內,在混凝樁身的表面刻槽,修築完時槽內充碎石、塊石等多孔介質,通過外界大氣溫度的自然波動下多孔介質在冬季時存在的對流換熱機制,而在夏季只存在熱傳導,來達到主動冷卻樁周凍和抬升凍上限的目的。
  13. Mr lim says it could be increased to about 760 sq km by closing gaps between singapore ' s main island and lesser ones

    林先生說通過補主島同其他小島之間的溝壑,加坡的國面積有望達到760平方公里。
  14. Interaction of run - on slab and soil is simulated by “ m ” method, run - on slab is constrained by soil through the vertival and horizontal, advances computing model of new type semi - integral abutment bridge. ( 3 ) this paper takes hengyang dashuiting middle bridge for test supporting project, designs full scale model test which can reflect truly interaction of beam, run - on slab and the embankment behind the abutment of new type semi - integral abutment bridge

    通過「 」法來模擬搭板與體之間的相互作用,用豎向彈簧和水平彈簧來實現體對搭板的約束作用,建立了型半整體式無縫橋梁的計算模型; ( 3 )以衡陽大水町中橋為試驗依託工程,設計了能真實反映型半整體式無縫橋主梁、搭板以及臺后相互作用的足尺模型試驗。
  15. By adjusting pile lengths and pile numbers, the settlement of pile foundation increased from the main span to the side span to such an extent that it matched the settlement of the embankment at both ends of bridges without any special treatment

    分別通過調整樁長和樁數,使樁基沉降從橋梁主跨逐步增大,而在路橋連接處使邊跨橋墩沉降與橋坡沉降基本一致,實現路橋沉降協同,從而開辟了解決橋頭跳車問題的途徑。
  16. Tsuen wan west station is located in the vicinity of the existing tsuen wan pier. part of it will be constructed on newly reclaimed land on the tsuen wan waterfront

    荃灣西站位處荃灣海濱,部分建於荃灣路以西的荃灣海傍地上。
  17. Please use form no. s16 - 5 for land pond filling for building the new territories exempted house nteh if nteh is a column 1 use or a use always permitted under the covering notes

    若為興建界豁免管制屋宇而進行塘,而界豁免管制屋宇屬于第一欄用途或注釋說明頁經常準許的用途者,請使用表格第s16 - 5號。
  18. For the construction of the new airport in hong kong, the airport core programme was designed involving substantial reclamation of land, construction of an airport, associated bridges and railway systems, a cross - harbour tunnel, expressways and a new town

    在香港機場的工程中,機場核心工程包括大規模、興建機場各座大樓、鋪設橋梁及鐵路系統、跨海隧道、高速公路與建設市鎮等。
  19. However, routing the road over the went landfill or its proposed expansion zone is not feasible due to space requirements of the landfill ( assuming an at - grade road ) and the incompatibility between raised roadway supports and the landfill s impermeable liner ( assuming an elevated road )

    可是,將道路跨越界西堆區或其建議擴展區域都並不可行,因為需要在空地堆放(假設是一條地面道路)和升高道路支撐物和的防滲透墊層(假設是一條高架路) 。
  20. The related problems design of pile foundation of construction, in the filling soil field with slope on natural slope, were been analyzed. the theory formula were been put and successfully applied to the pile foundation conputation and design of the bank house in the new town. it may be used to design for pile foundation in similar field and foundation of construction

    根據場地的實際情況,首先對山區斜坡上的鎮邊坡邊緣附近,建築物樁基礎設計計算的有關問題進行了分析,建立了相關的計算式,然後以某水電站庫區移民集鎮信用社綜合樓樁基礎設計計算為例,闡述了其應用效果。
分享友人