新水道 的英文怎麼說

中文拼音 [xīnshuǐdào]
新水道 英文
nieuwe waterweg
  • : Ⅰ形容詞1 (剛出現的或剛經驗到的) new; fresh; novel; up to date 2 (沒有用過的) unused; new 3 (...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. To make marketing gambit innovation on that base, the post - savings bank should exploit new financial product priority at intermediary service, personal credit service and particular deposit account service, take advantage of the new internet channel to founded net bank, make internal maketing and customer value management for upraise competitive capability and service level, make alliance strategic to meet the polytropic customer demand

    在此前提下開展營銷策略創,要注重從中間業務、個人信貸和特色存款業務方面開發的金融產品;利用網際網路技術提供的開辦網上銀行;為提高競爭能力和服務平進行內部營銷和顧客價值管理;為適應顧客需求的多樣化而進行戰略聯盟。
  2. Certain possible inventions of which he had cogitated when reclining in a state of supine repletion to aid digestion, stimulated by his appreciation of the importance of inventions now common but once revolutionary for example, the aeronautic parachute, the reflecting telescope, the spiral corkscrew, the safety pin, the mineral water siphon, the canal lock with winch and sluice, the suction pump

    當吃飽后,為了助消化而仰臥著時,他曾思考過幾項發明的可能性。這是由於認識到如今雖已司空見慣當初卻曾是巨大革的那些發明的重要性,從而受到刺激:比方說,航空降落傘反射望遠鏡螺絲錐別針瓶裝礦泉運河那有著絞車與泄的閘門裝置抽機。
  3. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨田東面主要排的單線行車路橋,以連接沿該主要排東面近車輛輪候區的現有未命名路與淳裕路
  4. As they were situated directly in the proposed reservoir site, they were resettled in tai long wan, a western coastal area of lantau island and a resettlement area in tsuen wan. others, whose land was included as part of the catchment area, or affected by the construction of the catchwaters, faced a different situation. among them, the residents of pui o including lo wei village and sun wei village, ham tin, law uk, san shek wan, upper cheung sha and lower cheung sha village, tong fuk and shui hou village suffered from disturbance to their natural water supply

    一些被興建引影響或被辟為集區的村落,如貝澳老圍村、圍村、咸田村、羅屋村、散石灣、長沙上村、長沙下村、塘福村及口村,原來流經村落的河流及地下源,因主要流被引堵截,農田無足夠灌溉,早造開耕嚴重不足,居民須往他鄉運,以應付日常生活急需及維持灌田。
  5. The first visit to xinzhou was to report its grand flower - worshiping festival, where we have experienced the local people ' s strong love and observation of their traditional opera and seen the scenic daoguan river

    第一次走進洲,是采訪拍攝盛大的舊街花朝節,親身感受了洲人對傳統劇目楚劇頑固的熱愛和堅守;這一次,走進觀河,看到的是生態優美的洲,青山綠、鄉村田野的風情萬千。
  6. I was like water, water can even through stone, and when tracked, water makes new path

    我象可以蜿蜒前進,哪怕有巖石阻擋,如果尋蹤而下,還會造成路。
  7. The positive is that as a substitute of old channel or a part of the new channel shiplock maintains the continuation of channel and makes possible the channel free from navigational obstruction and waterway transportation progress. the negative is that shiplock at the same time brings some problems to waterway transportation, such as the long time passing through shiplock, the piling up of vessels, making less other ' s benefits and making more other ' s costs, making conditions and forms of transportation change, making more complicated the waterway transportation safety management and navigation order keeping, and adding up transportation costs

    在經濟學意義上,船閘具有正負外部性,正的外部性為,船閘作為原航的替代物或的一部分,保證了航的連續性,為保證航暢通、航運發展提供了可能;負的外部性為,船閘同時給航運帶來了一些問題,如船舶過閘時間長、船舶積壓,引起他人效用的減少和成本增加,以及運輸組織條件、方式改變,使上交通安全管理和船舶航行秩序維護更加復雜,增加運輸成本。
  8. The newest cultivation techniques for good quality rice in hokkaido of japan

    日本北海稻施肥技術
  9. Speaking at a ceremony to mark the completion of works on the main drainage channels for river indus, river beas and river sutlej, the director of territory development, mr wong hung - kin, said today ( september 17 ) that the works for these three rivers in the river indus basin were sizable and entailed the straightening and widening of some 9km of existing meandering rivers with raised river embankments. the works also included the re - provisioning of existing facilities that were affected by the projects such as the reconstruction of 12 river - crossing bridges

    拓展署署長黃鴻堅今日(九月十七日)在梧桐河、雙魚河及石上河主要排工程竣工典禮上致辭時表示,整項梧桐河盆地的治河工程涉及上述三條位於界北區的主要河,規模龐大,總長約9公里,將原來迂迴曲折的河拉直及擴闊,並且將河堤加高及重置受工程影響的原有設施,包括12條過河橋梁。
  10. Hotel nikko new century beijing is located along the famous xizhimen street. it is near the canal that the emperor used when going to the summer palace from the inner city. along the water - way you will find many royal gardens such as the leshan garden beijing zoo, the wuta tower, the wanshou tower, and the purple bamboo park

    北京世紀日航飯店坐落於北京西直門外,它比鄰明清兩代帝王由市內通往頤和園的,故而其周邊保留了諸多皇家名苑:如樂善園北京動物園五塔寺萬壽寺福蔭紫竹院等。
  11. Illustrated with 34 representative works, among them ink paintings that assimilate traditional techniques of chinese art and others drawn from his unique series of zen paintings, the booklet accompanying this exhibition also contains an article, " the way of ink painting the origin and in search of zen ", which introduces l shoukun s theories of art

    呂壽琨:墨畫展覽小冊輯錄了呂壽琨的墨畫精作共34幀,包括其秉承傳統的作品和后來獨創的禪畫。並刊有專文墨之-溯源與尋禪簡介呂壽琨的創作風格,分析呂氏從師古師自然走向尋禪的進程。
  12. The predicted noise level is at least 1 db more than the prevailing traffic noise level at the time before the works to construct the road were commenced

    預測中的路噪音平必須最少比該區在建路工程進行之前的交通噪音聲級高1分貝a 。
  13. New territories west development civil engineering - land development - tsing yi development - remaining works new territories west development transport - roads - flyover across castle peak road at sha tsui road

    界北部發展土木工程-排及防止侵蝕工程-元朗排1996年11月5日
  14. " the full stretch of new river channel from fu tei au to san wai barracks was also completed before the wet season of 2003. the flooding risk of the flooding black spots in fu tei au, hung kiu san tsuen, sheung shui wah shan, tin ping shan tsuen, shek wu san tsuen, ma shi po tsuen, siu hang tsuen was greatly alleviated, " said mr wong, adding that the department s effort in alleviating the flooding problems in these areas was appreciated by the north district council

    他又說:在今年雨季前,由虎地坳至圍軍營的已經完成,令虎地坳、洪橋村、上華山、天平山村、石湖村、馬屎埔村、小坑村等過往嚴重浸黑點的浸威脅得到紓緩。
  15. The green school in dedham, ma saved the town $ 400, 000 in new sewer - system infrastructure by reducing stormwater runoff from the school grounds

    美國麻薩諸塞州戴得鎮的綠色學校因為減少校園雨徑流,而為該鎮省下了系統基礎建設約四十萬美金的經費。
  16. Dredging operations will be carried out in the ponds to ensure that contaminated sediments are not inadvertently allowed into the new drainage channel

    池塘會進行挖泥作業,確保受污染的沉積物不會因疏忽而流入的排
  17. In this premier issue, you will find the latest water quality survey report, the four lines of defense for protecting the purity and safety of our water quality, a guide to touring taipei water park, and concepts and practices to help conserve water

    本期創刊主要內容為公布最質調查報告介紹確保質純凈安全的四防線推薦悠遊自來園區宣導節約用觀念與做法,並提供有獎徵答,希望您喜歡。
  18. 4 singapore is at the southern tip of this important waterway

    加坡是在這條重要的南端
  19. His proposals include introducing molluscs into the city ' s waterways as natural bio - filters, adding bicycle lanes and hastening the cleaning and rezoning of 7, 600 acres ( 3, 100 hectares ) of contaminated land

    他的建議包括在城市的中引入軟體動物作為自然生物過濾器,在路上增加自行車,並加速清理並重規劃7600英畝( 3100公頃)被污染的土地。
  20. Article 23 when a waterway changes its course under natural force, the water rights owners thereof may petition the authority - in - charge to designate a new location and course for withdrawing water in a quantity, in whole or in part, as stated on the water deeds

    第23條(變更后之權利用)因自然變更時,原權人得請求主管機關,就新水道指定適當取地點及引路線,使用權狀內額定用量之全部或一部。
分享友人