斷口分析圖 的英文怎麼說

中文拼音 [duànkǒufēn]
斷口分析圖 英文
fracture analysis diagram
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ動詞1. (分開; 散開) divide; separate 2. (分析) analyse; dissect; resolve Ⅱ名詞(姓氏) a surname
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  1. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡區「三木花園」開發建設項目,從地下空間靜力結構穩定性角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體研究了計算面的應力與位移佈規律: ( 1 )在各種不同狀態下計算面的主應力矢量、位移( ux 、 uy )以及應力等值線色譜( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  2. However, the complicated international - trade circumstance makes it very difficult to control the payment risks of export, and at the same time because of their own defects, the traditional trade finance products cannot satisfy the exporters ’ needs. therefore, it has a high demand for the newer and better trade finance products and forfaiting is just a suitable one as a kind of bill discounted without recourse. after entering into wto takes the opportunities and challenges to the chinese banks, and the foreign banks will try to occupy the chinese markets by their rich management experiences, high - quality services and various fianc products

    一、本文的研究目的和意義隨著商業銀行客戶群日益多樣化的發展和不涌現的國際貿易新形式,傳統的打包貸款、出押匯等業務品種,已遠不能滿足我國企業日趨豐富的融資需求,本文通過對福費廷業務的特點、風險狀況、市場前景的,力找到一條適合我國商業銀行開展福費廷業務的新路子、新思維,同時也希望能為我國這樣一個新興市場經濟國家在解決出融資方面提出一個值得大力發展的途徑,有利於促進我國出貿易及我國商業銀行國際業務的大發展。
  3. The microstructure, structure, composition, phase of joint region, and the microstructure and composition of fracture have been analyzed using the equipment of metallurgical microscope, sem, eds, xrd and binary eutectic phase diagram for the al - cu system and diffusion theory

    利用金相顯微鏡、掃描電鏡、能譜儀、 x射線衍射儀,結合al - cu二元合金相及擴散理論,了接頭區域的形貌、組織、成、相組成,以及形貌、成
  4. The investigation in the field was combined with research indoors. by classifying tectonic sequence, confirming corresponding prototype basin, analyzing paleo - tectonic stress fields in different periods, plotting correlative tectonic map based on 297 explore wells, and analyzing the traits of the remaining depressions producing hydrocarbon and their migration rules in the ordovician, the author studied the basement of the basin ; the fault system of the basin ; the tectonic - sedimentary evolution of the basin and its circumference areas ; the prototype basin and corresponding dynamics background ; the paleo - tectonic patte rn and its evolution in the layers of producing gas in different periods of ordovician ; the superposition relationship among the different period basins formed by different stress fields ; the reformation of the basin and the formation, redistribution and final emplacement of the gas pools

    採用野外地質調查與室內綜合研究相結合,通過構造層序的劃及其相應盆地原型的確定、不同期次古構造應力場的、以297探井數據為基礎的相關構造件的編制、奧陶系殘餘生烴坳陷及其遷移規律研究等的綜合,開展了盆地基底以及盆地裂系統、盆地及鄰區構造與沉積演化、盆地原型及其形成的動力學背景、奧陶系產氣層不同時期的古構造格局及其演化、不同期次構造應力場形成的不同世代盆地之間的疊置關系以及盆地改造與天然氣藏的形成、重新配和最終就位諸方面的研究。
  5. Analysis results of histogram statistics and section electron microscopic scan technique, are that fracture feature of the cracks of the hbbb is similar and the crack is multi - source strain fatigue one. internal defects of the cast, such as impurities, gas holes, etc, are the main causes for early cracks. the contrast analysis of static strength, model and transient respond on three structures with fem proves that geometrical stress concentration in partial area has influence on early crack, also

    利用直方等統計方法和電鏡掃描技術對該抱軸箱體裂紋的結果是:抱軸箱體的裂紋特徵相近,裂紋性質屬于多源性低周疲勞裂紋,鑄件中的夾雜、氣孔等內部缺陷是導致過早裂損的主要原因;利用有限元法對該抱軸箱體三種結構的靜強度、模態和動態響應對比,證實了局部幾何性應力集中對過早裂損也有一定影響。
  6. The effect of girth weld strength match on the limit load and fracture resistance of high - grade, large diameter pipelines was analyzed with failure analysis diagram ( fad ) method

    摘要採用失效評定技術了油氣長輸管道特別是高強度大徑管道環焊縫不同強度匹配形式對管道極限承載能力以及抗性能的影響。
  7. Effect of girth weld strength match on limit load and fracture resistance of high strength, large diameter pipelines steel is analyzed with fad ( failure analysis diagram ) method

    摘要採用失效評定技術了油氣長輸管道中高強度管?鋼大徑管道環焊縫不同強度匹配形式對管道極度限承載能力以及抗性能的影響。
  8. This paper thus argues that there is no direct relationship between population growth and economic growth

    不同於既有文獻橫面的跨國方式,本文試了解單一國家的人變化與經濟成長間如何互為影響。
  9. Wavelet decomposition : db4 wavelet decomposition and energy norm l1 was employed to extract feature of zr - 4 alloy images. with the selected wavelet db4, features at different frequency channels of life span were gotten. then an energy change at the direction of fracture extension was studied to find the relationship between the feature and life - span. fractal algorithm : feature of image at different channel was extract after wavelet transform

    基於小波解的像的,首先提取鋯- 4合金低周疲勞紋理像的特徵,實驗確定了db4小波解和l1能量的計算方法,求得不同壽命的像在各個頻率通道的特徵值,像的變化反映在特徵值的變化,這為像的壽命提供了一種有效的手段。
分享友人