斷層網 的英文怎麼說

中文拼音 [duàncéngwǎng]
斷層網 英文
network of fault
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
  • 斷層 : fault; slip; slicle; fracture; dislocation
  1. Intracystic hemorrhage of pre - existing arachnoid cyst with adjacent subdural hematoma was found on ct and mri of brain

    腦部計算機和磁振造影發現原本的顱內蜘蛛膜囊腫出現囊內出血伴隨硬腦膜下腔血腫。
  2. This paper addresses how to introduce the corba techologies into the tmn, meanwhile, it also addresses the possible applicatioin of corba in tmn. finally, this paper also introduces the detail design of how to apply a corba middleware tao into alcatel ' s forth generatioin project, using corba as the network management interface between the qaf and nef, the functions in tmn. this paper especially pays attention to the detail design of the netowrk management ' s softweare framework, managed object class and notifciation management, try to find a more elegant design pattern in network management development

    隨著電信路技術的不發展,各種新業務的日新月異,傳統的基於osi協議棧的電信管理tmn在開放性,分散式,互操作性和實現的復雜程度上都日漸不能滿足需求,為了解決這樣的問題,國際電信聯盟itu - t將corba技術引入電信管理中,本文就如何在tmn電信管理中引入corba技術,引入后的實際設計問題,以及corba技術在tmn中可能的應用做了一定程度的探討,並結合alcatel4g管子項目介紹了如何將基於corba的中間件tao ,應用在管系統中,作為q介面適配qaf和元功能nef的標準管理介面。
  3. Under the upper pressures belt or minute super pressures of the upper triassic series and jurassic system interface formation, the fluid in the upper triassic series moved along stratum interface, fault and crack network thoroughfare, formed " secondary gas pool " in the jurassic system

    上三疊統和侏羅系界面形成的超壓帶或微超壓帶,使上三疊統氣藏流體在壓力差的作用下,沿、地界面和裂縫路通道運移,在良好的侏羅系圈閉中形成「次生氣藏」 。
  4. Optical coherence tomography in idiopathic central serous chorioretinopathy

    特發性中心性漿液性脈絡膜視膜病變的光學相干成像
  5. Study of stereometric parameters of optic nerve head of normal eyes using heidelberg retina tomography

    掃描儀對正常人群視乳頭形態結構參數的測定
  6. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與破碎帶及千枚巖相聯系。
  7. After recombination of faults according to new penetrated breakpoints data, the number, extension length and trend of some faults controlled by original patterns changed

    根據新鉆遇中點資料對進行重新組合,原井條件下控制的部分的數量、延伸長度、走向發生了變化。
  8. We obtained the uniform data distribution from discrete data points by inserting spatial dots and then set up digital elevation model ( dem ) of correlative area through constructing mutual linked triangle net. the isoline graph was implemented based on this model. during the processes, we combined the technology of stratification computing when inserting special dots in fault area with the technology of stratification triangle net in fault area for dealing with thrust data

    然後介紹了在本研究中構造逆地質等值線的基本思路:從離散數據點結構出發,採用空間數據內插方法進行數據的均勻化,通過三角剖分構造出相互連接的三角形路結構來建立起相關區域內的數字高程模型,利用該模型構造出相應的地質等值線圖,其中使用擴展點與區的關系屬性進行區分空間插值計算處理和區域的分三角形格化處理相結合的技術,實現逆數據的處理和等值線繪制。
  9. The re - recognition on the faults in xingnan development area can direct the work of plotting development plan, adjustment of injection - production relation, perfect injection - production patterns and dynamic analysis in the process of production

    通過對杏南開發區的再認識,對油田開發方案的編制、注采關系的調整、注采井的完善及生產過程中進行動態分析起到了積極的指導作用。
  10. Based on the rock pressure ' s characteristics of the pre - driven roadway, the rational support plan and parameters about roof bolting with bar and wire mesh are determined, and the manner of driven waste in place of coal was adopted

    基於中預掘巷的礦壓特點,確定出其合理的錨梁支護方案與支護參數,並採用了掘出的矸石與煤的合理「置換」方式。
  11. The carrying system in the area, dominated by the vertical carrying system, especially type i and type ii carrying faults, linking to every other types of carrying systems each other, composed a three - dimensional network carrying system

    並指出本區油氣輸導系統是一個以垂向輸導系統為主,以、類主輸導為骨幹,與各類垂向輸導、油源輸導、不整合以及火成巖體等輸導系統相溝通的復雜的三維油氣輸導路系統。
  12. Adopting the plane mesh plus parameters to form automatically a large three - dimension spatial calculation mesh and adopting spatial fault calculation mesh formed by spatial arbitrary, dissection technology can solve the finite element mesh dissection in the calculation of huge underground cavern group

    採用平面格加參數化平推方式自動形成大三維空間計算格,同時採用空間任意切面技術形成空間平面計算格,解決了巨型地下洞室群計算的有限元格剖分問題。
  13. Bolt shotcreting steel mesh combined support system applied to broken zone of fault

    錨噴聯合支護在破碎帶中的應用
  14. Investigation of optical coherence tomography, heidelberg retina tomography, retinal thickness analyzer in age - related macular degeneration

    共焦激光掃描和視膜厚度分析在老年性黃斑變性檢查中的對比研究
  15. The plates are bounded by an interconnected network of ridges, transform faults, and trenches

    板塊以一個由洋中脊、轉換和海溝相互連接形成的路為界。
  16. This paper studied the method on the detection of network islands after faults, which is based on layer - separation and region - separation of network topology, the searching technique is applied to the analysis of the power system topology, simplified the process of the detection of network islands

    本文研究了分式的電解列判方法,應用人工智慧的搜索技術,進行電拓撲搜索,以判是否解列,簡化了電解列判的過程及其前期準備工作。
  17. Solving the elliptic grid generation together with an algebraic method marching along the normal - to - wall direction, viscous grids around complex geometries are generated. the inner - layer grids with the algebraic method is othogonality and easy to control the distance to the wall. according to the hilgenstock, the source items are calculated to control the othogonality and spacing of grid lines on boundaries

    法向外推方法生成的內代數格具有很好的正交性,可隨意控制格至物面距離,確保邊界內有足夠多且密的格;外格採用hilgenstock方法,根據格線角度和距離與期望值之間的誤差不進行源項修正,實現格對邊界正交性和距離的雙重控制,保證了格的合理分佈並具有較高的質量。
  18. Age - related changes in optical coherence tomography measurement of the neurosensory retinal thickness in the macula

    黃斑視膜神經上皮光學相干掃描增齡性研究
  19. This paper discusses the features of active fault through data analysis by using short water level across the fault to measure and set up the monitor net of south branch of the yamalike fault deformation

    摘要利用跨短水準測量,建立了跨雅瑪里克裂南支形變監測,通過資料分析得出該裂帶活動特徵,確定了雅瑪里克裂為全新世早期活動裂。
  20. Three - dimension finite element floating mesh method is used to calculate the temperature field and thermal stress of 6aa roller compacted concrete gravity dam section and f6 fault concrete tuck in this paper. the basic theories adopted include heat conduction theory, elastic theory and corresponding finite element calculation equation

    本文用三維有限元浮動格法對6aa壩段及基礎部位f6混凝土塞的施工過程進行溫度場和溫度應力模擬計算,計算的基本理論是熱傳導理論和彈性理論以及相應的有限元計算公式。
分享友人