斷開關控制 的英文怎麼說

中文拼音 [duànkāiguānkòngzhì]
斷開關控制 英文
cyclic onoff swithing controll
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ動詞1 (使開著的物體合攏) close; shut 2 (圈起來) shut in; lock up 3 (倒閉; 歇業) close down...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. The catv charge and control system is mainly composed of the management software 、 the header data modulator and the terminal charge and control equipment. i am responsible for design catv charge and control equipment and test system. the header data modulator is used to encrypt the control single from computer and transmit it into the appointed frequency. the terminal charge and control equipment demodulate out the control single from data modulator and transmit it to the addressing control part, where the demodulated fsk single is received and well - handled by the cpu unit, decode the unauthorized signals and deliver it to the shut point, shut point make use of capability of wideband anf characteristic of shut, then the signal of illegal customer will be turn off and vice versa, the legal customer can receive the normal signal

    前端數據調器完成對計算機輸出的信號加密處理,將指令碼載送到一指定頻率點。終端收費器解調出信號,送至單片機尋址部分。單片機尋址部分接收經fsk數據解調器送來的信號,送入cpu單元后,解出不授權信號,然後向部分送入信號,部分利用pin二極體的寬帶工作能力以及特性,實現對非授權用戶或者非法用戶的信號,使之不能正常收視,繳費用戶進行通正常收視,達到用戶通道的管理。
  2. Optical power meter real - time monitor optical power of each optical cable, and control computer gather the value of optical power attenuation circularly, if some values excess the limit, the computer control optical switch to connect another spare optical fiber with otdr card, control the otdr card to test the optical fiber, and then find the malfunction point accurately. the system require software system to run with hardware devices tother. this paper analyze requirement and technical feasibility in software system, ooa and uml are used to analyze software and abstract the class diagram

    通過光功率計對每條光纜中的備用光纖進行實時的監,測試光功率的衰減值,主計算機不循環的對每個光功率模塊進行數據採集,並記錄每路光信號的光功率衰減值,然後進行分析處理,如發現達到設定的光功率衰減門限值就報警,並的切換,將故障光纜中的另一備用光纖與otdr卡連接,通過otdr卡對該光纖進行測試,從而確定故障點。
  3. This switched parasitic yagi - uda antenna uses a yagi - uda antenna as its prototype, and can change radiation pattern by the control of rf switch which is placed at the center of its reflector

    八木天線以八木天線為原型,通過八木天線反射器中部的微波反射器的通來改變八木天線的方向圖。
  4. Two nonlinear simulation methods are designed by curve fitting method and anfis which seem simply and right in the simulation experiment. based on the model different control strategies also were realized in detail such as chopped current control ( ccc ), angular position control ( apc ), amplitude - change ccc and pi control. a simple torque sharing function ( tsf ) method and a tsf controller were designed which decreases torque ripple effectively

    文章中還建立一種基於模糊神經網路的非線性模型,並對比分析了三種方法,模擬中確定了電機的最優角,在此基礎上實現了電流斬波、角度位置、變幅值電流斬波以及分段雙閉環pi,模擬結果表明,它實現了電機的正常運行,很好的抑止了電機轉矩脈動,同時有效地降低了噪聲。
  5. 1 m 0. 5, the phase - shifted angle 6 is controlled in term of sine law which makes the magnitude of resonant voltage track a reference sine voltage, and the resonant voltage is rectified, filtered, inverted and then the better sine - voltage output is obtained, theoretical analysis and experimental results show that for the resistive load and inductive load, the switches of leading leg of the phase - shift - controlled circuit are always turned on at zvs, and ones of lagging leg are turned on at zvs ( < 0 ) or turned off at zcs ( ( > 0 ), moreover, all switches in the low - frequency inverter are always turned on and off at zvs, the measured circuit efficiency for rated load reaches up to 88 %

    從功率單向流動角度出發,提出了一種lcc諧振型恆頻移相單相高頻鏈逆變電路拓撲,在調系數0 . 1 m 0 . 5情況下,移相角按正弦規律變化,使諧振電壓脈沖列的幅值追蹤參考正弦電壓信號,經過整流、濾波、低頻逆變,從而獲得正弦度較好的輸出電壓。理論分析和實驗結果證明對于阻性負載或阻感性負載,移相全橋具有超前橋臂零電壓通,滯后橋臂或者零電壓通( _ 0 )或者零電流( _ 0 )的軟特性,而低頻逆變器的各個均實現零電壓條件下的通與
  6. A generic term for a circuit element that can be turned on or off in response to one or more control signals

    一種泛指電路元件的術語,通過響應一個或多個信號便可以通或這種電路元(件) 。
  7. Vi ( virtual instrument ) made up of general hardware and auto - test software is available along with the development of computer and electrical technology, test system based on vxibus is an example of vio test application of one set vxibus vi on space camera is presented in this papero this thesis introduces the development of auto - test technology and instrument concepts on vi > vxibus and its applications, sorts and analyzes the tested signals, describes in detailed the system integrate and auto - test software development of the vi, reveals plenty of test data recorded in graph, chart and file that collected by auto - test software, also the analysis and judgment result of the eye - view controller function tested by the auto - test software o

    基於vxi總線的測試系統是具有代表性的虛擬儀器。本文介紹了基於vxi總線的虛擬儀器在空間相機測試上的應用。文中介紹了自動測試技術與儀器的發展,介紹了虛擬儀器的有概念,介紹了vxi總線系統的應用,對測試信號進行分類、分析,詳細說明了基於vxi總線的虛擬儀器的系統集成,說明了自動測試軟體的發,列舉了由自動測試軟體獲得的,以圖形、圖表、文件等形式記錄的測試數據,以及由自動測試軟體得出的對目視器的功能進行分析和判的結果。
  8. Neither the bank, its associates, nor any of their directors, officers or employees, shall be liable to the customer for any expenses, loss or damage suffered by or occasioned to the customer by reason of any action taken or omitted to be taken by any one or all of the bank, its associates, their directors, officers, employees or agents pursuant to these conditions or in connection therewith other than as a result of the fraud, wilful default or negligence of the bank, its associates, their directors, officers, employees or agents ; the bank s failure in good faith to honour any stop - payment instructions given by the customer ; the presentation to the bank of any cheque or other payment order which is post - dated ; the bank failing to honour any draft drawn on it by the customer, but the bank shall immediately return such draft to the customer through the normal channels giving the reason for the dishonour ; any loss, damage, destruction or misdelivery of or to the securities howsoever caused unless the same shall result from the negligence of, or theft by, the bank or its associates or any of their directors, officers or employees, in which event the extent of the liability of the bank shall be limited to the market value of such securities at the date of discovery of the loss and even if the bank has been advised of the possibility of such loss or damage ; unauthorised use or forging of any authorised signature as a result of the negligence, wilful default or fraud of the customer ; subject to condition 5. 5, any act or omission, or insolvency of, any person not associated with the bank including, without limitation, a third party nominee or depositary ; viii the collection or deposit or crediting to the custodian accounts of invalid, fraudulent or forged securities or any entry in the custodian accounts which may be made in connection therewith ; any malfunction of, or error in the transmission of information caused by, any electrical or mechanical machine or system or any interception of communication facilities, abnormal operating conditions, labour difficulties, acts of god, or any similar or dissimilar causes beyond the reasonable control of the bank and notwithstanding paragraph, the error, failure, negligence, act or omission of any other person, system, institution or payment infrastructure

    本行其聯系人士其各董事高級人員或雇員均毋須向客戶因以下理由而使客戶蒙受或產生之任何支損失或虧損負責: i本行其聯系人士其董事高級人員雇員或代理人根據此等條件採取或遺漏採取有之行動,但由於本行其聯系人士其董事高級人員雇員或代理人之欺詐行為故意失責或疏忽所造成者除外ii本行本真誠地未能依約替客戶執行止付指示iii向本行提交任何遠期支票或其他付款指示iv本行未能兌現由客戶出之匯票,但本行將立即透過正常渠道將該匯票退回客戶,並解釋拒付之理由v無論如何導致之任何證券之損失損毀毀壞或錯誤交付除非上述各項乃因本行或其聯系人士或其任何董事高級人員或雇員之疏忽或盜竊所引致,而在該等情況下,本行的責任將只限於在發現損失當日該等證券之市值,以及即使本行已獲知該等賠償之可能性vi因客戶之疏忽故意失責或欺詐行為而導致的任何偽造授權簽名或不獲授權使用該簽名vii在第5 . 5 a條之規限下,與本行無者之任何行動或遺漏或無償債能力包括但不限於第三者代名人或寄存處viii代收或存入或貸存於保管人賬戶的無效偽造或假冒證券或在保管人賬戶記入可能與此有之賬項ix任何電子機械或系統失靈或因該等機件或系統產生的資料傳送錯誤或任何通訊設施之終不正常操作情況勞工問題天災或非本行所能合理之任何類似或非類似原因及x盡管有第ix項,任何其他人系統機構或付款設施的錯誤故障疏忽行動或遺漏。
  9. Because of the unique issues in the networks, including mobility - induced disconnection, network partition, high out - of - order delivery ratios and channel errors, the congestion control and the error recovery in the network is challenging. in this environment, the interaction between tcp and mac layer protocols, the affection of route protocols on the performance of tcp and the particular congestion control and error recovery mechanism are first discussed. then a particular transport layer protocol scheme based on the non - feedback mechanism is presented, with emphasis on the analysis and simulation of the key parameter

    文中主要討論了兩種不同網路結構中的無線tcp協議改進方案,其一在最後一跳為無線鏈路的網路環境中,針對基本tcp擁塞存在的缺陷,文中在現有解決方案的基礎上提出一綜合性的方案,其中包括無線鏈路的高誤碼率和連接問題的解決,並重點對方案中出現的交叉層問題進行分析和模擬;其二,考慮的是分散式網路( adhoc ) ,在文中較為詳細的分析了tcp和mac層機間的相互作用、路由協議中造成tcp性能降低的因素、 adhoc網路中應採取的特殊擁塞和差錯恢復機,在此基礎上提出了一種採用非反饋機的解決方案,重點對方案中的鍵參數進行分析和模擬,分析和模擬結果表明此機可在很大程度上提高adhoc網路中tcp的性能。
  10. A. c. high - voltage switchgear and controlgear. high breaking capacity fuses. characteristics

    交流電高壓設備和裝置.高遮電容熔器.特性
  11. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產發項目的決策階段、設計階段、實施階段分別需要採取的相措施和方法,以盡量降低項目的工程造價,即在決策階段編寫詳細的可行性研究報告和編投資估算;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清單報價,擇優確定專業分包單位,防止少數壟性行業任意抬價,深入現場,收集和掌握施工有資料,定嚴密的合同條款。
  12. " although the simplest model for a cn affecting gene actiity is where the ariant is a deletion of a gene or part of a gene, we found examples where actiity is affected from a distance, " commented barbara stranger, first author and post - doctoral fellow at the wellcome trust sanger institute. " this may occur when the cn reduces the effectieness of a region that works to switch the genes on or off

    變異拷貝數機能通過改變特定基因的「劑量」 (即復后的拷貝數量) ,藉助于裂解某個包含后續可翻譯成蛋白質密碼的基因的活性片或藉助于降解基因活性即類似/及在我們基因組中的調整的基因組中具有調作用的基因片來影響基因活性。
  13. The actual load is compared to four limit values, and by achieving the limit value, the relay of the crane controller could be switch

    實際的裝載量靠近極限值的同時,又不與四個極限值相比較。起重機電容可以作為
  14. The control tactics of space voltage vector are investigated, and the simplified algorithm which judges the sector location of reference vector and calculates switch operation time is put forward. by analyzing the current hysteresis control, the relation between switch frequency, and hysteresis bandwidth and input inductance of pwm rectifier is deduced. by applying instantaneous power theory, the principle of pwm rectifier power control is analyzed, and the direct power control by matlab toolbox through estimating active power and reactive power with virtual flux is realized, and the simulation results prove that it is correct

    對常用空間電壓矢量策略進行分析,提出了給定參考矢量所在區間判的簡化方法,以及電壓矢量作用時間的求取方法;分析了電流滯環策略,推導出頻率與滯環帶寬以及整流器輸入電感之間的系;應用瞬時功率理論分析pwm整流器功率原理,通過虛擬磁鏈估計有功功率和無功功率,用matlab實現了直接功率,並驗證了該方法的正確性。
  15. A. c. high - voltage switchgear and controlgear. direct over - current releases

    交流電高壓設備和裝置.直接過電流路器
  16. A novel cycloconverter - rype three - phase hf link inverter topology for soft - switching based on phase - shifted full - bridge mode is proposed, whose main advantages are as follows : under the conditions of d < i < and overlap - d, the switches of the leading leg are turned on at zvs and the switches of the lagging leg are turned off at zcs and all switches of the cycloconverter circuit are commutated in the overlapping mode in the interval of zero voltage, which makes the circuit realize soft switching to the utmost extent and reliably solve the problem of peak voltage caused by the storing energy of leakage inductance of hf transformer

    論文提出一種新型移相全橋軟周波變流型三相高頻鏈逆變器,電路的主要優點是:前級移相全橋的移相角在_ d _ i和_ ( overlap ) - _ d條件下,超前橋臂零電壓通,滯后橋臂零電流,並使周波變流器所有在零電壓期間重疊換相,使整機最大程度地實現了軟,並可靠解決了高頻變壓器漏感儲能引起的電壓尖峰問題。
  17. Cool attitude, resolutely decided to kick the answer is the key keep up the good operation guide controlled forward control control retreat space control shooting photographs

    冷靜的心態,果地決定,是揭謎底的鍵,加油吧操作指南「 」 「 」方向「 」前進「 」後退「空格」拍攝相片。
  18. Introduction : cool attitude, resolutely decided to kick the answer is the key keep up the good operation guide controlled forward control control retreat space control shooting photographs

    冷靜的心態,果地決定,是揭謎底的鍵,加油吧操作指南「 」 「 」方向「 」前進「 」後退「空格」拍攝相片。
  19. Improvement on protective lock of disconnecting switch and control circuit of circuit breaker of transformer two terminals

    隔離的防護鎖及變壓器兩端路器迴路的改造
  20. Vacuum breaker is widely applied in the reactive power compensation as the switch of shunt capacitor banks, which will cause reignition and over - voltage after the switching performance gets deteriorated

    進行無功補償時廣泛使用真空路器作為並聯電容器組的元件,其操作性能劣化后,突出的表現就是極易發生重燃和操作過電壓危害。
分享友人