斷面形式 的英文怎麼說

中文拼音 [duànmiànxíngshì]
斷面形式 英文
form of fracture
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • 斷面 : section; fracture surface; plane of fracture
  1. 187 there are various types of lines on the drawing such as : border lines, visible lines, invisible lines, break lines, phantom lines

    圖上有各種的線條,諸如:邊框線、實線、虛線、剖線、中心線、引出線、尺寸線、裂線、假想線。
  2. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、料場規劃與土石方平衡、截流方與圍堰斷面形式、截流進占程序和時段、防滲、防滲墻施工等主要技術問題的優化完善過程
  3. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流計算出來的設計水位比非恆定水位具有一定的安全儲備;而對于灘地糙率的低估又會造成設計水位的偏低,給防洪工作帶來隱患;如果利用改進斷面形式來降低水位或彌補糙率增加帶來的水位抬高,需要較大的工程量,所以平時應注意灘的減糙管理工作。
  4. Through checking computations, it was shown that the analogue accuracy of the model was quite high, which can provide important basis for scientific decision - making on engineering measures. through analogue calculation and analysis of many regulation schemes, it was shown that combining the diversion weir works with the bed fixing works at the south branch is reasonable and feasible in the implementation of loushuikouzi river regulation works. in addition, it is suggested that the bed fixing works at the south branch should adopt the improved compound section scheme

    經對多個整治方案的模擬計算與分析,表明漏水口子河道整治採用分流魚嘴工程和南汊固床工程相結合的整治工程措施是合理可行的,通過模型計算研究還提出了南汊固床工程採用復斷面形式的改進方案建議,該方案保證了南汊枯期通航和不流,而且對南汊及撫遠鎮的保護具有正作用。
  5. It was also investigated and analysed on the styles of cross section in road green space, the rate of green space, the kind of green space, the quantity of plant spaces in green space, the format of planting. on the base of these, the planning designs of road green space in the blocks of heze city were also studied in combination with the practical situation which the city of heze were building to be a plain - plantation city with the flowers and water. the main results were as follows : 1. there were some problems about road green space in blocks of heze city, which were detected and researched. ( 1 ) the rate of road green space was low and the styles of cross sectionin road green space were simple

    本研究以菏澤城區道路綠地及街頭綠地為研究對象,對其綠地斷面形式、綠地率、綠地類型、綠地植物種類、數量、種植等現狀進行了全的調查和分析,在此基礎上,結合菏澤近年創建以「花城水邑」為依託的平原森林城市建設的實際,對菏澤城區道路綠地規劃設計進行了研究,主要結果如下: 1 .菏澤城區道路綠地存在以下問題: ( 1 )道路綠地率低,綠地布置單一,中心島積偏小; ( 2 )植物種類少,景觀效果差; ( 3 )植物配置單一,地方特徵不突出; ( 4 )某些植物選擇不當,如遮陰功能差,影響交通安全等; ( 5 )行道樹與架空線存在矛盾,影響樹木生長,景觀效果差; 2 .根據荷澤實際情況進行了城區道路綠地規劃設計研究: ( 1 )提出了菏澤城區道路綠地規劃設計的依據、原則、總體布局、布局
  6. According to the rule of optimized design, structure shape of single - track railway tunnel is designed, then 7 kinds of schemes are brought forward

    在滿足優化設計原則的條件下進行了單線鐵路隧道斷面形式結構優化設計,提出了7種備選方案。
  7. The relation between the strengthening length of the tunnel anti - seismic and the properties of surround rock of tunnel entrance and the shape of tunnel liner is analyzed

    對隧道抗震設防長度與洞口段圍巖性質、襯砌斷面形式的關系以及隧道洞口段的加固措施進行了研究。
  8. Using the proper way to deal with the canal in leaking project in the irrigation area of bailian slope ; since take the complex structure of plank & mold, gain the remarkable results

    摘要文章介紹白蓮坡灌區在渠道防滲工程中,選用合理的斷面形式,採用板膜復合結構,所取得的節水效果。
  9. By comparing the stability characters of rock after excavated, the best stable section shape is found. 3. the security of lining is compared by load - structure model which is used in tunnel design

    並對7種方案和標準圖方案進行了隧道全開挖后圍巖穩定性比較,從中找出隧道開挖后對圍巖穩定最有利的斷面形式
  10. The selection of the internal contour of the vehicular tunnel is determined by architectural limits. the program computes the most optimum cross - section of all kinds of different driveways and different cross - section forms

    公路隧道內輪廓確定,通過確定建築限界,由程序計算出不同車道,不同類型的最優斷面形式
  11. Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results

    文摘:綜合闡述了珠江水利委員會科學研究所從1983 ? 1998年間對飛來峽水利樞紐的整體布置、施工導流、泄洪、通航、截流、閘孔斷面形式、閘下消能、閘下沖刷等所進行的一系列試驗和研究工作,並介紹主要試驗研究成果。
  12. Taking geometry structural analogue method, analysis landscape spatial network structure, visual section form, landscape elements and their arrangement rule, detail characteristics in particular, using landscape planning as the main analytical tool, we analyze and assess the traditional landscape quality in xitang in a thorough way

    採用幾何結構模擬的圖示解剖手段,從景觀的空間網路結構、視覺態、景觀元素及其空間排列方,尤其是細部特徵等,運用景觀規劃作為分析工具,對古鎮西塘的傳統景觀特質進行了全的分析和評價。
  13. - ii - 5. with the consideration that the cross section of the cable - stayed structure and the rigid frame structure ' s are not uniform, a new joint solution was presented for these different sections

    5 、針對金馬大橋斜拉橋側主梁截與t構側主梁截不統一的問題,提出了一種不同結構的新型連接方法。
  14. At first, the experiment carried out by tianjin university has been analysed according to the " nonlinear balance trying calculation " method, and the values of yield load and ultimate load agree with the test result better, and the curve of bending moment - curvature, bending moment - deflection can agree with the results. the second, the simplified formula for evaluation the ultimate flexural capacity of cfrp strengthened rc members is presented according to the three probable failure modes ( compression failure ; cfrp rupture ; crushing of the concrete in compression before yielding of the reinforcing steel ). it is applicable to both singly and doubly reinforced rectangular sections, as well as flanged sections

    首先利用鋼筋混凝土非線性平衡試演算法對天津大學試驗進行了理論分析,所得分析值與試驗結果相比,加固梁的屈服荷載、極限荷載能夠很好地吻合,彎矩曲率關系曲線及彎矩撓度關系曲線較為吻合;其次,為了滿足實際工程的需要,根據碳纖維布加固構件可能發生的三種破壞態(壓區混凝土壓碎破壞、碳纖維布拉破壞以及受拉鋼筋尚未屈服時壓區混凝土已壓碎破壞) ,區別三種鋼筋混凝土構件截(單筋矩、雙筋矩、 t) ,分別給出了碳纖維布加固混凝土構件抗彎承載力的簡化計算公和適用條件,並進一步探討了這三種截下進行加固設計和復核的步驟。
  15. Planation surface is a wide - ranging and undulating surface formed by planation in a long and relative stable period or in a decreacing - development period. it is near the base level and there always exists some deposits such as crust of weathering above it. planation surface is often uplifted or buried by the later tectonic activities

    夷平是在長期的地殼相對穩定時期或地殼下降發展階段,由廣泛的夷平作用以截斷面形式橫切所有先成的地層和構造的接近侵蝕基準的平緩的地表態,其上常有風化殼等碎屑堆積,常遭到後期的抬升切割或埋藏,分佈於地球的各緯度帶。
  16. On the basis of on - the - spot investigation and information, this article puts forward the stratum separation scheme and field criterion for projects in gansu loess areas ; presents the geological structure model of the natural slope in this area for the first time ; counts and analyses the parameter of the loess ; analyses the stability of loess cut with the method of ultimate balance and finite element ; recommends different transect forms for the cut subgrade in gansu ' s loess areas ; evaluates these forms with grey system theory concerning stability, economy and anti - scour capability ; finally, puts forward the design method and procedures of reasonable heavy cuts transect

    本文通過大量的現場調查和資料收集,提出了甘肅省黃土工程地層劃分方案和野外判定標準;首次提出了甘肅省黃土自然邊坡的不同地質結構模型;統計和分析了甘肅省黃土的土性參數;運用極限平衡法和有限元法對黃土路塹高邊坡穩定性進行了分析;推薦了甘肅省不同黃土地區路塹高邊坡的斷面形式,並結合穩定性、經濟性和抗沖刷性能,應用灰色系統理論對其進行評價;最後,提出了黃土路塹高邊坡合理設計方法和設計步驟。
  17. Accordant to factors affecting the layout of pcee, the maneuver for planning linear location of pcee is formed. taking into account that unfit transverse sector design can stand for the reason of traffic condition worsted, included parts of pcee transverse sector are analyzed and suitable layout styles are recommended

    其次,以影響出入口道路規劃布局的因素為基礎,提出出入口道路線位規劃的方法;在明確橫設置不合理是出入口道路交通效能下降重要原因的前提下,對構成出入口道路橫的各組成要素進行分析,推薦合適的橫斷面形式
  18. The extending major fault has a strike of north - east, controlling the forming of depressions and evolution of sedimentation. the nature of the fault is normal in the early stage. later with the reformation of sliding effect, normal faults are still the main faults, and the plane distribution of the faults occurs sectionally

    取得了一系列的研究成果:遼河灘海地區主要有三種構造樣,即伸展構造樣、走滑構造樣及反轉構造樣,其中,以伸展構造樣為主,伸展主幹裂走向以北東走向為主,控制凹陷成和沉積演化,裂性質早期為正層,後期經走滑作用改造,至今仍以正出現,裂平展布具有分段性。
  19. In the third chapter, study on the rational cross section of steel stiffening box girder for the suspension bridge, through the fully comparative study with the ordinary hexagon streamlined steel stiffening box girder widely used in the present suspension bridges at home and abroad and taking the reality in the bridge into account, a updated streamlined steel stiffening box girder with fim has been developed and applied to the bridge successfully

    在第3章?大跨懸索橋鋼箱梁合理結構型研究中,對現代大跨懸索橋通常所採用的鋼加勁梁的進行了比較研究,特別是對普通的六邊流線型箱和本文提出的魚鰭型流線型箱從結構受力和經濟性等方進行了分析比較,為後者在宜昌長江公路大橋上的成功應用提供了可靠依據。
  20. Two abb frequency converters and a siemens programmable logic controller ( plc ) are with the lower - level computer and industry computer are with the host computer. the communication between with the host computer and low - level computer not only translate the system condition, but also send the control instruction. the system condition is shown with chinese window in the host computer, and the constant stress function is realized through the frequency converter part

    2臺變頻器和plc作為下位機設備,工控機作為上位機集中控制,上下位機之間通過通訊,把系統當前狀態、當前給定通過上位機來綜合判,並通過上位機以漢化界予以顯示,而下位機的變頻部分則實現管網的恆壓功能, plc實現4臺水泵機組邏輯控制和定期巡檢,及部分故障綜合報告。
分享友人